|
| 1 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable. material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit etc complete as per the design & specification.Girth from 300 mm to 600 mm |
| 2 | Girth from 600 mm to 900 mm |
| 3 | Girth from 900 mm to 1800 mm |
| 4 | Clearing and grubbing road land including uprooting rank Horticulture) vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earller and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per the design & specification. |
| 5 | Supplying and filling the foundation and plinth with clean Horticulture) coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of all labour, T&P etc. as per the design & specification. |
| 6 | Providing & laying cement concrete of prop (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying. watering and curing etc. Complete. To the required levels including cost, conveyance, royality and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer in charge. |
| 7 | Providing fitting & fixing of Paver Block 60mm over 50mm thick sand layer Interlocking Paver block of approved variety in colour & size made by block making machine with strong Vibratory compaction of approved design & shape, laidin required colour & pattern over 50mm thick compacted bed of course sand, filling with joints with sand etc. all complete including cost, coveyance & royalty of all materials etc complete as per the design & specification. |
| 8 | CC(1:2:4)with 6mm crusher brokn granite chips. |
| 9 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken Granite chips |
| 10 | Supplying, fitting and placing uncoated HYSD bar M.S. fensing Grill made out of M.S. Flat/Square Bar painted with red oxide primer (L. No.7175 dt. 13.10.2011 of EPM). |
| 11 | M.S. fensing Grill made out of M.S. Flat/Square Bar painted with red oxide primer (L. No.7175 dt. 13.10.2011 of EPM). |
| 12 | Supplying and stacking of good earth at site including royalty and carriage up to 1 km (earth measured in stacks will be reduced by 20% for payment) as per the design & specification. |
| 13 | Supplying and stacking sludge at site including royalty Horticulture) and carriage up to 1 km (sludge measured in stacks will be reduced by 8% for payment) etc complete as per the design & specification. |
| 14 | Rough dressing the trenched ground including breaking Horticulture) clods as per the design & specification. |
| 15 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal uprooted vegetation as per the design & specification |
| 16 | Fine dressing of the ground etc complete as per the design & specification. |
| 17 | Spreading of sludge, dump manure and/or good earth Horticulture) in required thickness as per direction of Officer-in-charge (Cost of sludge, dump manure and/or good earth to be paid separately) etc complete as per the design & specification. |
| 18 | Mixing earth and sludge or manure in the required Horticulture) proportion specified etc complete as per the design & specification. |
| 19 | Grassing with maxican including watering and Horticulture) maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free fromweeds and fit for mowing including cost of grass and supplying good earth, If needed (the good earth shall be paid for separately) etc complete as per the design & specification. |
| 20 | Planting of Ornamental spp/ (21\\" X 21\\") poly pack: Digging pits removing all unserviceable materials and dumping outside the working area as shown by the Officer-in-Charge and filling the same pits with supplied well decomposed cow-dung manure mixture of ratio 4:1 and required quantities of fertilizer, Pesticides, Supply of planting material with specified saplings, taking up maintenance over 1 month, work like watering, weeding application of fertilizer, pesticides etc. including cost of men, material, tackles all complete as per the design & specification. |
| 21 | Planting of Ornamental spp/ (17\\" X 18\\") poly pack: Digging pits removing all unserviceable materials and dumping outside the working area as shown by the Officer-in-Charge and filling the same pits with supplied well decomposed cow-dung manure mixture of ratio 4:1 and required quantities of fertilizer, Pesticides, Supply of planting material with specified saplings, taking up maintenance over 1 month, work like watering, weeding application of fertilizer, pesticides etc. including cost of men, material, tackles all complete as per the design & specification. |
| 22 | Sclupters |
| 23 | Electrical Works |
| 24 | PH Works Please Enable Macros to View BoQ information |