Name of Work:- WARD 03 PWD DAURALA ROAD MAKBRA WALI MASJID KE PASS PULIYA KA RCC R KA WORK
Sl. No.
Item Description
1
ramp and culvert
2
Earth work in filling in embankment with approved material obtained from borrowpits with a lift upto1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto10km asper Technical Specification Clause 301.5(Earth work with 10.000 km Lead) 1st Part L=15.70+10.70/2=13.20 B=8.00+9.60/2=8.80 L=21.00+10.00/2=15.50 B=11.60+14.00/2=12.80 B=6.10+6.40/2=6.25
3
Providing,laying,spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber,applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density (for Grading-II) L=15.70+10.70/2=13.20 L=15.70+10.70/2=13.20 B=8.00+9.60/2=8.80 L=21.00+10.00/2=15.50 B=11.60+14.00/2=12.80 B=6.10+6.40/2=6.25
4
Providing,laying,spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber,applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density ( for Grading-III) 1st Part L=15.70+10.70/2=13.20 B=8.00+9.60/2=8.80 L=21.00+10.00/2=15.50 B=11.60+14.00/2=12.80 B=6.10+6.40/2=6.25
5
R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Raft and wall i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/287a) 1st Part L=15.70+10.70/2=13.20 B=8.00+9.60/2=8.80 L=21.00+10.00/2=15.50 B=11.60+14.00/2=12.80 B=6.10+6.40/2=6.25
6
Mild steel or iron work such as reinforced including supply of all material,labour and T&P etc.required for proper completion of work,(As per Analysis) L=13.20/0.30=44 L=8.80/0.30= Previous bill Qty
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.