|
| 1 | Site/field survey and Checking of all Electric/street light poles, 11kVDouble Pole Structure for their healthy ness and preapre a list of all missing items. Other details are as per Technical Specification and scope of work. | Site/field survey and Checking of all Electric/street light poles, 11kVDouble Pole Structure for their healthy ness and preapre a list of all missing items. Other details are as per Technical Specification and scope of work. |
| 2 | Cleaning of wild grass/ creepers around 11kV DP and removal of bird nest etc. were deposited in 415V Distribution Box. checking the functioning of 100A MCCB, Fuse Units. Installation of 415V DB MS cover, if required do necessary welding, denting and do painting of RAL colour or do existing colour on DB or as directed by EIC. Other details are as per Technical Specification and scope of work. | Cleaning of wild grass/ creepers around 11kV DP and removal of bird nest etc. were deposited in 415V Distribution Box. checking the functioning of 100A MCCB, Fuse Units. Installation of 415V DB MS cover, if required do necessary welding, denting and do painting of RAL colour or do existing colour on DB or as directed by EIC. Other details are as per Technical Specification and scope of work. |
| 3 | Supply & Installation of Missing Jumper from OH line to LA, DO Fuse, 11kV/415V, 200MVA Distribution Transformer, drop out fuse replacement, jumper from DO fuse to distribution Transformer alongwith Connectors and associated work. ACSR / PVC insulated RYB and black colour Jumper length is 1 to 1.5 Mtr. Other details are as per Technical Specification and scope of work. | Supply & Installation of Missing Jumper from OH line to LA, DO Fuse, 11kV/415V, 200MVA Distribution Transformer, drop out fuse replacement, jumper from DO fuse to distribution Transformer alongwith Connectors and associated work. ACSR / PVC insulated RYB and black colour Jumper length is 1 to 1.5 Mtr. Other details are as per Technical Specification and scope of work. |
| 4 | Replacement of faulty MCCB provided on 415V DB. Work comprises supply and Installation/connection of new 4P,100A MCCB, (Similar Havells / simens /L&T), on 415V DB alongwith with all necessary Lugs/hardwares etc. to complete the work. Other details are as per Technical Specification and scope of work. | Replacement of faulty MCCB provided on 415V DB. Work comprises supply and Installation/connection of new 4P,100A MCCB, (Similar Havells / simens /L&T), on 415V DB alongwith with all necessary Lugs/hardwares etc. to complete the work. Other details are as per Technical Specification and scope of work. |
| 5 | Replacement of damage/faulty porcelain KIT KAT fuse Unit in 415V DB. Supply and installation of 100A Kit Kat fuse unit set of 3 nos. comprises one unit. Work comprises supply & installation of good quality porcelain KIT KAT fuse unit and all Lugs/hardwares etc. to complete the work. Other details are as per Technical Specification and scope of work. | Replacement of damage/faulty porcelain KIT KAT fuse Unit in 415V DB. Supply and installation of 100A Kit Kat fuse unit set of 3 nos. comprises one unit. Work comprises supply & installation of good quality porcelain KIT KAT fuse unit and all Lugs/hardwares etc. to complete the work. Other details are as per Technical Specification and scope of work. |
| 6 | Cleaning & Checking of 11kV/415V,200KVA, oil type Distribution Transformer installed on 11kV Double Pole Structure, work comprises do necessary meggering for measuring insulation level of filled oil in tank. Other details are as per Technical Specification and scope of work. | Cleaning & Checking of 11kV/415V,200KVA, oil type Distribution Transformer installed on 11kV Double Pole Structure, work comprises do necessary meggering for measuring insulation level of filled oil in tank. Other details are as per Technical Specification and scope of work. |
| 7 | Removal and do necessary overhauling/repairing and filtration of insulating oil of 11/0.415kV, 200KVA Distribution X-mer and again installation on 11kV DP after carrying out of necessary rectification/repairing work on unit. Other details are as per technical specification and scope of work. | Removal and do necessary overhauling/repairing and filtration of insulating oil of 11/0.415kV, 200KVA Distribution X-mer and again installation on 11kV DP after carrying out of necessary rectification/repairing work on unit. Other details are as per technical specification and scope of work. |
| 8 | Supply and installation of Pipe type Earthing. Work shall be done as per latest/relevent IS scope of work. Other details are as per Technical Specification and scope of work. | Supply and installation of Pipe type Earthing. Work shall be done as per latest/relevent IS scope of work. Other details are as per Technical Specification and scope of work. |
| 9 | Supply, installation and commissioning of 11kV, 200Amp, gang operated 3Ph horizontal type Air Break Switch (AB) of Insulation (porcelain/Polymer), on 11kV DP structure. Other details are as per Technical specification and scope of work. | Supply, installation and commissioning of 11kV, 200Amp, gang operated 3Ph horizontal type Air Break Switch (AB) of Insulation (porcelain/Polymer), on 11kV DP structure. Other details are as per Technical specification and scope of work. |
| 10 | Supply and installation of 60-70W LED street light luminaries, with constant current driver (similar to Bajaj model-ENXT P 84L WH PO PC SD or equivalent). Other Details are as per technical specification and scope of work. | Supply and installation of 60-70W LED street light luminaries, with constant current driver (similar to Bajaj model-ENXT P 84L WH PO PC SD or equivalent). Other Details are as per technical specification and scope of work. |
| 11 | Supply, installation and commissioning of 30/40W LED Light fitted with suitable rating solar panel / power battery for 10 to 12 hrs backup. Other Details are as per technical specification and scope of work. | Supply, installation and commissioning of 30/40W LED Light fitted with suitable rating solar panel / power battery for 10 to 12 hrs backup. Other Details are as per technical specification and scope of work. |
| 12 | Cleaning and painting of Electrical street Light pole , double Pole staruture RSJ pole and Power distritbution RSJ pole painting work. Other Details are as per technical specification and scope of work. | Cleaning and painting of Electrical street Light pole , double Pole staruture RSJ pole and Power distritbution RSJ pole painting work. Other Details are as per technical specification and scope of work. |
| 13 | Supply and installation of PVC insulated and PVC Sheathed ,standed copper conductor TRS cable for 1100V confirming to latest IS 694 :2010 make Polycab/havells/RRKabel/ including all consumables like rawal plugs,wooden screws,saddle spacers , or for street light fixture power supply purpose, as required and do per specification and scope of work etc. | Supply and installation of PVC insulated and PVC Sheathed ,standed copper conductor TRS cable for 1100V confirming to latest IS 694 :2010 make Polycab/havells/RRKabel/ including all consumables like rawal plugs,wooden screws,saddle spacers , or for street light fixture power supply purpose, as required and do per specification and scope of work etc. |
| 14 | a) 3Core X 2.5Sqmm | a) 3Core X 2.5Sqmm |
| 15 | b) 3Core X 4Sqmm | b) 3Core X 4Sqmm |
| 16 | c) 3Core X 6Sqmm | c) 3Core X 6Sqmm |
| 17 | Shifting and supply/installation of damage service connection/meter power board with 25/30Amp kit Kat Fuse and work is removal and installation of angle provided by MPEB for service connection at suitable height or as suggested by EIC/MPEB. Other Details are as per technical specification and scope of work. | Shifting and supply/installation of damage service connection/meter power board with 25/30Amp kit Kat Fuse and work is removal and installation of angle provided by MPEB for service connection at suitable height or as suggested by EIC/MPEB. Other Details are as per technical specification and scope of work. |
| 18 | Providing services to accomplishing the tasks as assigned and directed by Engineer-in-charge by supplying of various categories of labours on task basis.Note : A task would mean 8 hours of duty including half an hour of lunch time. Please read scope of work and rates qouted under this item as contrcator shall follow minimum wages as per Other details are as per Technical Specification and scope of work. | Providing services to accomplishing the tasks as assigned and directed by Engineer-in-charge by supplying of various categories of labours on task basis.Note : A task would mean 8 hours of duty including half an hour of lunch time. Please read scope of work and rates qouted under this item as contrcator shall follow minimum wages as per Other details are as per Technical Specification and scope of work. |
| 19 | Highly Skilled manpower | Highly Skilled manpower |
| 20 | Skilled manpower | Skilled manpower |
| 21 | Semi-Skilled manpower | Semi-Skilled manpower |