| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., isposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 2 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). |
| 3 | Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 4 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 5 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer -in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). |
| 6 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level andcurvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand),including making joints with or without grooves (thickness of joints exceptat sharp curve shall not to more than 5 mm), including making drainageopening wherever required complete etc. as per direction of Engineerin-charge (length of finished kerb edging shall be measured to calculatevolume for payment). (Precast C.C. kerb stone shall be approved byEngineer-in-charge). |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a)1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 9 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). (a) Dark shade pigment using ordinary cement |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge: |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : a)One or more coats on old work. |
| 12 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:a)Cement Mortar 1:6 (1 cement : 6 coarse sand). |
| 13 | 12 mm cement plaster of mix : a)1:6 (1 cement: 6 coarse sand) |
| 14 | 15 mm cement plaster on rough side of single or half brick wall of mix : a)1:6 (1 cement: 6 coarse sand) |
| 15 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom With rapid setting bitumen emulsion (a) On W.B.M / W.M.M. @ 0.4kg/sqm |
| 16 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom With rapid setting bitumen emulsion (a) On bituminous surface @ 0.25kg/sqm |
| 17 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. (a) 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 18 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. (a) 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 20 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work,including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100 mm c/c on both ways, neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick, 100 mm wide MS sheet duly painted over priming coat, reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc including cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 21 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 22 | Providing and laying bituminous mix of instant road repair with patch master 25kg/bag packing i/c labor for cleaning, spreading and filling in potholes on the road surface to provide smooth surface completely as per direction of Engineer-in-charge/ for compliance of complaints on social media platform. |
| 23 | Cleaning and desilting of open storm water drain of any width and depth, i/c taking out wet/semi-wet sludge, silt and malba, rubbish etc. (i/c any dead animal etc.) and disposal of the excavated material for all lead and all lift/depth and opening of drain cover and placing covers in position after desilting the drain, removal of the blockage, obstruction in the smooth flow of drain in or under water / liquid mud i/c pumping out water if required in or under foul condition. The amount includes the cost of dismantling RCC covers & recovery of scrap steel from drain covers, etc. All complete as per direction of Engineer-in-charge. |
| 24 | Cleaning and opening spouts and bell mouths over both side main carriage way as well as services roads of Palam Dabri Road and disposal of the excavated material for all lead and all lift/depth during monsoon season. All complete as per direction of Engineer-in-charge. |
| 25 | Multiplying GST correction factor @0.973 =1243955.68 |
| 26 | Sum of amount for item no 22,23,24 = 526233.00 Please Enable Macros to View BoQ information |