|
| 1 | Cleaning of malva at site with disposal of 60mtr. including waste making diversion etc....all comp. |
| 2 | Earth work in excavation in foundation in ordinary soil i/c lift 1.5m & lead 30m etc......all comp. As per P.W.D schedule item No. 251 without royality |
| 3 | Concrete with 4cm. Gauge brick ballast fine sand and cement in prop. Of 12:6:1 including supply of all mat. Lab. T&P all comp. As per P.W.D schedule item No. 273 |
| 4 | R.C.C work with cement, approved coarse sand and 2cm guage stone grit in the proportion of 1:1½:3 in column footing and plinth beam excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc. and also including supply of all material, labour & T&P etc. required for proper completion of work (PWD Sl.No.283-A) |
| 5 | Class-150 brick work with 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work. As per P.W.D schedule item No. 305 |
| 6 | M.S. or iron in plain work such as R.C.C. i/c bending for proper shape and i/c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i/c cost of binding wire etc.....all comp. As per P.W.D schedule item No. 504. |
| 7 | Class-150 brick work with 1:4 cement & coarse sand mortar super Structure of one brick thick wall etc…......all comp. As per P.W.D schedule item No. (305+309+310) |
| 8 | 12mm thick Plaster with cement & coarse sand mortor consisting of one part of cement and 5 parts of C.sand of 2.25 FM on brick work including supply of all material, labour & T&P etc.....required for proper completion of work. As per P.W.D Schedule item No. 584(i) |
| 9 | Oil bound distempring two coat over one coat primer including supply of all material & labour as per SI No. 649 & 650 |
| 10 | M.S. or iron in heavy size as trusses, builts up gates door frames, record racks roof work gates etc i\c cost of drilling holes rivitting or welding where necessary etc.....all comp. As Per S.I No-503 |
| 11 | Supply of barbed iron wire fencing etc....all comp. |
| 12 | Providing barbed iron wire fencing i/c fixing it to post after stretching it, i/c labour and T&P etc.....all comp. As per P.W.D schedule item No. 513 |
| 13 | Sand filling in plinth incl. supply of necessary quantity of sand & incl. watering dressing etc. rate includes cost of all materials, labours and T&P etc. required for proper completion of work all.... comp. As per P.W.D schedule item No. 255 |
| 14 | Class-150 brick work with 1:4 cement & c-sand mortar etc…......all comp. As per P.W.D.schedule item.No. 305 |
| 15 | R.C.C. Work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in proportion of 1:1.5:3 for Slab works etc……….all Comp. As per P.W.D.schedule item. No. - 284 (A). |
| 16 | M.S. or iron in plain work such as R.cc i\c bending for proper shape and i\c supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and i\c cost of binding wire.etc………..all Comp. As per P.W.D.schedule item. N0.504 |
| 17 | 12mm thick Plaster with cement & C- sand mortar in 1:5 including supply of all material labor etc…......all comp. As per P.W.D.schedule item. No. 584(i) |
| 18 | P/L in cement, concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As per P.W.D schedule item No. 279(i) |
| 19 | GSt Please Enable Macros to View BoQ information |