| 1 | Excavating in trenches n.exc 1.5m wide and n.exc 1.5m in depth in soft/loose soil for foundation, etc, or for shafts, wells, drain pipes n.exc 10sqm on plan and getting out, complete, all as specified and directed. |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick, complete, all as specified and directed. |
| 3 | Removing surplus soil to a distance n.exc 50m and deposited where directed at a level not exceeding 1.50m above the starting point, complete, all as specified and directed. |
| 4 | Taking up or down galvanised pipe with connected fittings for cleaning,refixing or removing to storeyard complete the bore of 15mm, complete all as specified and directed. |
| 5 | Description all as per ser item No. 4.00 above but 20mm bore. |
| 6 | Description all as per ser item No. 4.00 above but 25mm bore. |
| 7 | Description all as per ser item No. 4.00 above but 40mm bore. |
| 8 | Description all as per ser item No. 4.00 above but 50mm bore. |
| 9 | Taking up or down GI/CI/DI pipe with connected fittings for cleaning,refixing or removing to storeyard complete the bore of 80 mm, complete all as specified and directed. |
| 10 | Description all as per ser item No. 9.00 above but 100mm bore. |
| 11 | Description all as per ser item No. 9.00 above but 150mm bore. |
| 12 | Relaying and fixing galvanised pipe with connected fittings after removal of scalling, cleaning and flushing etc including supply and fixing of new fittings for 15mm bore pipe, complete, all as specified and directed. |
| 13 | Description all as per ser item No. 12.00 above but 20 mm bore. |
| 14 | Description all as per ser item No. 12.00 above but 25 mm bore. |
| 15 | Description all as per ser item No. 12.00 above but 40mm bore. |
| 16 | Description all as per ser item No. 12.00 above but 50mm bore. |
| 17 | Relaying and fixing GI pipe with connected fittings after removal of scalling, cleaning and flushing etc including supply and fixing of new fittings i.e bends, collers,Tees, reduces etc for 80 mm bore pipe, complete, all as specified and directed. Note: GI fittings deemed in the item cost and CI/DI fittings shall be measured separately. |
| 18 | Description all as per ser item No. 17.00 above but 100mm bore. |
| 19 | Description all as per ser item No. 17.00 above but 150mm bore. |
| 20 | Supply and laying/fixing of GI water tubing, medium grade, galvanised (ISI marked as IS-1239), with all fittings including short lengths, fixed to walls, concealed in wall and ceiling or laid in floor trench complete with all fittings (such as bends, elbows, Tee, short pieces, connectors, back nuts, diminishing pieces, caps and plugs, unions etc), complete, all as specified and directed for 15 mm bore. Make -Jindal/Tata/Suryaprakash |
| 21 | Description all as per ser item No. 20.00 above but 20mm bore. |
| 22 | Description all as per ser item No. 20.00 above but 25mm bore. |
| 23 | Description all as per ser item No. 20.00 above but 40mm bore. |
| 24 | Description all as per ser item No. 20.00 above but 50mm bore. |
| 25 | Description all as per ser item No. 20.00 above but 80mm bore. |
| 26 | Description all as per ser item No. 20.00 above but 100mm bore. |
| 27 | Description all as per ser item No. 20.00 above but 150mm bore. |
| 28 | Taking up CI/DI water mains (incl all fittings) with Spigot and socket ends and lead joints incl burning out joints and recovering lead or flanged joints or CI Column pipe and lowering into submersible pump with all fittings complete of 80mm bore. |
| 29 | Taking up CI/DI water mains (incl all fittings) with Spigot and socket ends and lead joints incl burning out joints and recovering lead or flanged joints or CI Column pipe with all fittings complete of 80mm bore. |
| 30 | All as per item No. 29 above but 150mm bore. |
| 31 | Relaying only Cast iron pipes with spigot and socket ends centrifugally cast. Class LA in any length,laid in trenches water mains after removel of scalling, cleaning and flushing complete all as specified and directed for 80mm bore. |
| 32 | Description all as per ser item No. 31.00 above but 100mm bore. |
| 33 | ADescription all as per ser item No. 31.00 above but 150mm bore. |
| 34 | Supply, laying and jointing CI/DI pipe with spigot and socket ends/DI/GI Column pipe for lowering submersible pump with all fittings centrifugally cast, class LA in any length laid in trenches for 80mm bore. |
| 35 | Description all as per ser item No. 34.00 above but 100mm bore. |
| 36 | Description all as per ser item No. 34.00 above but 150mm bore. |
| 37 | M & L CI fittings, bends tapers any type, (straight, bend, increasing, decreasing or double socket etc) Tee pieces single branch, 'Y' junction, double branch, cross (all sockets or socket and spigot) collars, caps and plugs of size up to 150mm bore complete, all as specified and directed. |
| 38 | Supply and fixing in repair Gun metal globe or gate valves, with iron wheel head screwed both ends for iron pipe of 15mm bore and fixed, complete, all as specified and directed. |
| 39 | Description all as per ser item No. 38.00 above but 20mm bore. |
| 40 | Description all as per ser item No. 38.00 above but 25mm bore. |
| 41 | Description all as per ser item No. 38.00 above but 40mm bore. |
| 42 | Description all as per ser item No. 38.00 above but 50mm bore. |
| 43 | Supply and replacement of CI/DI sluice valve of 80mm dia with flanged ends class PN 1 .6 with iron wheel, stainless steel spindle and check nut confirming to IS :14846 incl all jointing materials such as nuts, bolts, washers and gaskets etc complete all as directed. |
| 44 | Description all as per ser item No. 43.00 above but 100mm dia. |
| 45 | Description all as per ser item No. 43.00 above but 150mm dia. |
| 46 | Repair/maint of water leakage from CI/DI pipe joint in ground and open carefully the joint portion of the of the pipe line duly excavated the trench and burning out the defective run lead joint in existing of CI pipe/fitting and provision of new lead joint in site using the retrieved lead as obtaining from burning out of joint and adding of fresh lead if required to make the joint 100% water leak proof including returning, filling and ramming the excavated materials after satisfactory, joint/leak chacking all as directed for following bore of CI pipe line :(a) 150 mm bore pipe line. |
| 47 | (b) 100 mm bore pipe line. |
| 48 | M&L Lagging on pipes of internal dia 20 mm, used in external water supply or plumbing all round with, 40mm thick bonded mineral wool preformed ‘SNAP ON’ pipe sections of density 144 Kg/cum conforming to IS 9842, provided with chicken mesh wire netting 25 gauze 20mm mesh and finally covering with plaster of pairs including taking down old, complete, all as specified and directed. |
| 49 | Description all as per ser item No. 47.00 above but 25 mm bore tubing. |
| 50 | Description all as per ser item No. 47.00 above but 32/40mm bore tubing. |
| 51 | Description all as per ser item No. 47.00 above but 40mm thick bonded and for 50mm bore tubing. |
| 52 | Description all as per ser item No. 47.00 above but GI/CI pipe of 40mm thick bonded D19and for 80mm bore tubing. |
| 53 | Description all as per ser item No. 47.00 above but GI/CI pipe of 40mm thick bonded and for 100mm bore tubing. |
| 54 | Description all as per ser item No. 47.00 above but GI/CI pipe of 40mm thick bonded and for 150mm bore tubing. |
| 55 | Disconnectiong existing defective electric motor of any make 60 HP from electric mains isolating the necked connections, removing from foundation by unscrewing the nuts, bolts etc, discouple from pump, opening of motor for inspection in presence of Engr-in-Charge and carry out minor repairs at site or transporting to workshop and back, reassembling the motor after repair, refixing in position reconnecting same as prior to removing from foundation including replacement of nuts, bolts washers of suitable size, testing and commissioning complete all as specified and directed. Note :- (a) Replacement of defecting parts shall be measured and paid separately as S&F here after. (b) In case of major repairs not possible at site, the motor shall be shifted to Civil workshop, and cost of shifting to wksp and back to site included in the rates. |
| 56 | Taking out old unserviceable/burnt copper winding of motors capacity 60 HP (defective motor taken out in item No.54 above) and material and labour for rewinding of electric motor of capacity 60 HP with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor, slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge, complete all as specified and as directed. |
| 57 | Taking out unserviceable terminal plate with connector and outer cover of elect motor of any make, type 60 HP capacity and supply and connect, testing terminal plate with connector same as per existing complete all as specified and as directed Engr-in-Charge. |
| 58 | Replacement of Ball bearing for the electric motor 60 HP 440 Volt opened in item No 54 here in before including necessary mechenical work complete all as directed. |
| 59 | Replacement of MS Shaft of the Pump of 60 HP cap 440 Volts in repairs complete all as specified and directed. |
| 60 | Replacement of MS Shaft of the electric motor 60 HP 440 Volts in repairs dismantled under item No. 54 here in before, complete all as specified and directed. |
| 61 | Taking out defective pump set of any type, make and capacity by unscrewing the foundation bolts, disconnecting from water connection, and disconnecting from electric motor, opening for inspection in presence of Engr-in-Charge and carry out minor repair at site, in case major repair/replacement of parts not possible at site, the pump shall be shifted to civil work shop at his own cost, and refixing, reconnecting in position, testing and commissioning complete including replacement of nuts bolts washers all as specified and as directed. Note:- Replacement of defective part by new one shall be measured and paid separately under respective items. |
| 62 | Supply and fixing in repair of bronze impellers suitable to existing of 60 HP centrifugal pump set of any make, complete all as specified and as directed. |
| 63 | Replacement of Neck ring for pump set 60 HP capacity, complete all as specified and directed. |
| 64 | Disconnecting electric connections from starter, disconnecting the water connections carefully by unscrewing the nuts, bolts and Lifting of submersible pump set including column pipes, and submersible cable from bore well disconnecting the pump and motor opening the pump and motor to locate the faults and carry out necessary repairs as directed including transporting to workshop, re-assembling the same after repair lowering in well, including column pipe of any dia, 10 ft long upto 20 Nos, and submersible cable, re-connecting all electrical and water connections complete testing and commissioning all as specified and as directed. (Note:- The replacement of parts shall be measured and paid separately) |
| 65 | Taking out old unserviceable/burnt winding from the submersible 3 phase motors 3 HP to 7.5 HP and rewindinig the same with insulated winding wire as per existing gauge as approved by Engr-in Charge and testing after repair, complete all as specified and as directed. |
| 66 | Material & Labour for overhauling of submersible pump sets 3 HP to 7.5 HP capacity up to 08 stages and reassembling the same after replacement of the following unserviceable/defective parts including testing of pump sets, complete all as specified and as directed with the connected items of:(a) Bottom bowl CI with stud, nuts & bolts. (b) stainless steel shaft with shaftKey complete. (c) Gun metal Bush. (d) Impeller Gun metal type. (e) Strainer brass. (f) Stainless steel coupling with key. |
| 67 | Supply, connecting, testing and commissioning submersible cable with copper conductor, stranded of size 6 sqmm 3 core, complete, all as specified and as directed. |
| 68 | Disconnecting, isolating, electrically unserviceable star delta/DOL starter 3 phase 440 volts of any make & type and taking down from wall/panel board of 3 to 60 HP pumps and keeping aside for disposal, complete all as specified and as directed. |
| 69 | Supply and fixing in replacement of DOL/ star delta starter to capacity of 3 HP to 7.5 HP submersible pump 3 Phase 415 volts, as per existing complete all as specified and directed. |
| 70 | Disconnecting unservicable change over switch of any type as per site requirement and supply & fixing and connecting off load change over switch 4 pole 200 Amp 440 volts conforming to relevant IS including all connecting and jointing material complere, complete all as specified and directed. |
| 71 | Earthing complete with GI earth plate 60cmx60cmx6mm thick electrode and 32 x 6 mm GI strip as earthing lead. buried directly in ground ( earth pit not less then 2.25 metres deep below ground level ) with top edge of the plate not less then 1.5 metres below normal ground level. connected to GI strip 32 x 6 mm as earth lead by means of bolts, nuts, check nuts and washers of galvanized iron or steel all as shown in electrical plate No. 3 and incl earth work, PCC pit and RCC cover, atering pipe 20 mm dia light grade, funnel, wire mesh, charcoal dust and salt etc and connected to earthing test point, complete, all as specified and directed. Note:- Item of earthing includes cost of 7.5m long GI earth lead 32x6mm and protection of 40mm bore GI light grade including testing |
| 72 | Supply and fixing in replacement of ammeter 0 to 200 Amps Digital type with selector switches, CTs etc. complete all as specified and directed. |
| 73 | Supply and fixing in replacement of voltmeters 0 to 500 Volts Digital type 415 volts with selector switches etc., complete all as specified and directed. |
| 74 | Supply and fixing in replacement single phase preventor, complete all as specified and directed. |
| 75 | Supply and fix in replacement of CIDFS wing type NRV as per IS-5312 of PN-1.6 type including nuts, bolts and jointing materials complete all as specified and directed. |
| 76 | Replacement of coupling suitable for pump set 60 HP capacity centrifugal pump all as specified and directed as per site requirement. |
| 77 | Supply and fix in replacement foot valve flanged end drilled type including nuts, bolts and jointing materials complete all as specified as per IS -4038. of size150/100 mm dia bore |
| 78 | Material and labour for replacement of fully automatic Star Delta Starter suitable for 60 HP Centrifugal pump Sets 415 volt, 3 Phase, 50 Hz, including single phase Preventer complete. |
| 79 | Cleaning of Overhead reservoir by draining out water below supply level, removing all internal sludge by washing. Cleaning the surface of the reservoir using wire brushes and other scraping tools to remove dirt and scale to make it free from deposits. Washing the reservoir with high pressure compressor nozzle thoroughly and removing dirty water from the tank to make it clean. Disinfecting the sump surface using disinfectent complete all as specified and directed for 50000 gallons capacity (Note:- The work of cleaning and disinfection will be carried out by expert in the field of the work. The work is to be carried out in such a way that the water supply is not disrupted.) |
| 80 | Description all as per ser item No. 78 above but 100000 gallons capacity |
| 81 | Cleaning of underground water sump and water filteratin plant by pumping out water below suction level, removing all internal deposited sludge by non clogging submersible pump, cleaning the surface of the sump using wire brushes and other scraping tools to remove dirt and scales to make it free from all deposits, washing the sump with high pressure compressor nozzle thoroughly and removing dirty water from the pump to make it clean including and removing sand and gravels from sump and repair to the internal surfaces by plastering with cement mortar 1:3,15mm thick and providing fillers at cracks to prevent any seepage of water including disinfecting the sump surfaces, complete, Painting one coat of anti bacteria water proof paint all as specified and directed of 50000 gallons capacity. (Note:- (i) The work of cleaning and disinfection will be carried out by expert in the field of the work. (ii) The filter bed refilling material i.e new sand, gravel is measured and paid separately.) |
| 82 | Supply and fixing GI fittings of following sizes (like band, elbow, reducer, tee, union, socket, nipple etc) for fixing with GI pipe complete all as specified and as directed:- |
| 83 | 15 mm to 25 mm |
| 84 | 40 mm to 100 mm |
| 85 | Diconnection & Reassembling of sumbersible pump & its column CI/GI pipe from borewell for flushing complete all as specified and directed by Engr-in-Charge. Please Enable Macros to View BoQ information |
| 86 | Diconnection & Reassembling of sumbersible pump & its column CI/GI pipe from borewell for flushing complete all as specified and directed by Engr-in-Charge. Please Enable Macros to View BoQ information |