| 1 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Mean....(INo21-06, PgNo 153) (STATE SSR)Item Spec: (Bd.A.2 Page No. 259) |
| 2 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15cm. to 20cm. including watering and compaction etc. complete.....(INo21-37, PgNo 157) (STATE SSR)Item Spec: (Bd.A.11 Page No. 263) |
| 3 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade finely washed etc)....(INo24-04, PgNo 175) (STATE SSR) Item Spec: (Bd.E.2 Page No. 288 and B.7 Page No 38) |
| 4 | Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete.... (INo27-05, PgNo 197) (STATE SSR) Item Spec: (Bd.G.5 Page No. 315) |
| 5 | Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1 kg per cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.....(INo32-11, PgNo 209) (STATE SSR)Item Spec: (Bd.L.7 Page No. 369 |
| 6 | Providing and laying polished hand cut Kotah Stone flooring 25mm to 30mm thick and 45cm to 55cm wide in plain/diamond pattern on a bed of 1:6 C.M. including cemen float, filling joints with neat cement slurry, curing, polishing and cleaning complete.....(INo33-08, PgNo 213) (STATE SSR)Item Spec: (Bd.M.3 Page No.380) |
| 7 | Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for flooring in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. Complete. A) Flooring....(INo33-42, PgNo 217) (STATE SSR)Item Spec: (Bd.M. 12 Page No. 385) |
| 8 | Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to old plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, watering for two days etc. complete.....(INo35-14, PgNo 224) (STATE SSR )Item Spec: (As directed by Engineer- in-charge.) Please Enable Macros to View BoQ information |