| 1 | Transportation of pole from road side to pole pit for a lead of 1.0 Km. |
| 2 | Shifting of materials (other No than pole) to pole pits |
| 3 | Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting with OB stone boulder without cement, sand and stone aggregate etc. as required. |
| 4 | Erection of 9/11/13 mtr long steel tubular poles including excavation of pole pit as per site conditions and grouting by cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) (0.34 cum each pole). |
| 5 | Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle (20 mm X 600 mm), 7/ 4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. |
| 6 | Erection of disc/pin insulator for 11 KV over head lines as required |
| 7 | Supply and erection of 11 KV grade disc insulator (Polymer Type) with galvanized insulator fittings, ball and socket type and complete with galvanised strain clmaps, bolts, nut, washer etc. as required |
| 8 | Supplying and erection of 11 KV Pin Insulator (Polymer Type) complete with G.I Pin, Nuts, washers etc as required |
| 9 | Dismantling of 9/11/13 m pole with bracket etc. |
| 10 | Dismantling of overhead line comprising of ACSR DOG conductor, GI Wire, cross arms, insulators etc as required. |
| 11 | Dismantling of overhead line comprising of ACSR WOLF conductor, GI Wire, cross arms, insulators etc as required. |
| 12 | Dismantling of overhead line comprising of ACSR Rabbit conductor, GI Wire, cross arms, insulators etc as required. (for 1 wire system for running earth) |
| 13 | Erection of pole top/straigh two wire/ V shape two wire, angle iron/ channel iron, cross arm on steel tubular/ rail/PCC/ pole for 11/22/33 KV as required |
| 14 | Erection of double pole 3 wire cross arm for 11KV/ 22Kv/ 33KV over head lines as required. |
| 15 | Stringing of ACSR/AAAC DOG conductor, including un-coiling from drum at stock yard, loading onto departmental vehicle, transporting to site and unloading, laying of conductor along route, stringing and binding on insulators and jumpering. |
| 16 | Stringing of ACSR/AAAC WOLF conductor, including un-coiling from drum at stock yard, loading onto departmental vehicle, transporting to site and unloading, laying of conductor along route, stringing and binding on insulators and jumpering. |
| 17 | Stringing of ACSR/AAAC Rabbit conductor (for earthing purpose single wire system), including un-coiling from drum at stock yard, loading onto departmental vehicle, transporting to site and unloading, laying of conductor along route, stringing and binding on insulators and jumpering. |
| 18 | Supplying and fixing of MS nut bolt of different size as required. |
| 19 | Fabrication of MS Channel/Angle/Flat for bracket or clamp as per requirement. |
| 20 | Erection of cradle guarding, fabrication of the cradle guard and fixing onto guarding channels. |
| 21 | Note: 1). The estimated cost put to tender is excluding the PF and Pension Component. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos. 2). Truck for transportation of material from workshop to road side will be provided by SECL. 3). Poles will be transported from road side to pole pit manually by persons engaged by contractor. 4). Tubular poles and required MS materials for fabrication will be provided by department. 5). ACSR/AAAC DOG/RABBIT conductors will be supplied by department. 6). Gas DA/Oxygen or electric welding machine and welding electrodes etc. will be in the scope of contractor. 7). Other materials such as stay set, insulator disc/pin, MS nut bolts will be provided by the contractor. 8). GI wire for fabrication of Cradle Guard will be provided by the department. 9). All the fabrication job will be done by the contractor. |
| 22 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |