Name of Work:- Clearing of Bushes, Trimming and Removal of the trees in HWP(M) Colony 2026-2028.
Sl. No.
Item Description
1
Clearing the jungle ,vegetation,grass ,bush wood,trees and saplings of girth up to 30cms measured at a height of 1 meter above the ground level to maintain the visibility, disposal of waste material to the burning yard ( Within a week after cutting)and burning the same under controlled fire conditions including tools and tackles etc complete as per specifications and as directed by Engineer-in-charge
2
Pruning of the trees of girth shown below (measured at a height of 1 meter abvoe the ground level) upto a height of 5 mtr or as directed to maintain visiblity including transportation and dispossal of the pruned material to the burning yard within in a week after cutting, burning the same under controlled fire conditions including manpowerm transportation, tools and tackles etc complete as per specifications and as directed by the EIC
3
Beyond 30 cms. girth up to and including 60 cms. Girth
4
Beyond 60 cms. Girth up to and including 120 cms. Girth
5
Beyond 120 cms. Girth up to and 240 cms. Girth
6
Felling of dead, slanting trees of girth measured at a height of 1 mtr. above the ground level including cutting of the trunks and branches, and stacking of serviceable material and disposal of unserviceable material within colony premises etc. complete as per specifications and as directed by the EIC.
7
Beyond 30 cms. girth up to and including 60 cms. Girth
8
Beyond 60 cms. Girth up to and including 120 cms. Girth
9
Beyond 120 cms. Girth up to and including 240 cms. Girth
10
Above 240 cms. Girth
11
Supplying and spraying Weedicide/pestcide on wild bushes/ unwanted plant growth and other areas etc including all materials, manpower, tools and tackles, PPG/safety gadgets etc. complete as per speicifications and as directed by the Engineer .
12
Approved weedicide
13
Nuvaan or equivalent pesticide
14
Clearing of Grass and wild vegetation by deploying Excavation with mechanical equipment (JCB/Poclain) Chain type or tyre mounted as may be required as per site conditions and and as directed by the engineer to required depth including excavtion for sockets, and dressing of sides, including getting out the excavated soil, and then returning the soil as required, and disposing of surpls excavated soil as directed by the EIC an within a lead of 50 m etc. complete as directed by the Engineer. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.