|
| 1 | DoingonecableendterminationonHTXLPEUGcablesofsizesbeyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 3 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 4 | Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplieddepartmentallyasperspecificationafterprovidingpropertraffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 5 | Laying 11 kV 3x300 sq.mm XLPE UG Cable by horizontal directional drilling method along/across roads, supplying and pulling 110 mm HDPE/ GI pipe duct, drawing 11 kV 3x300 sq.mm XLPE UG cable through the duct including surveying the site for collecting information about under ground utility installations and other obstructions using any, pit making, pilot drilling, pre reaming closing of pits with normal soil/filled sand/ crusher sand and consolidation to the satisfaction of the road owner and traffic police as they insist, taking the cable to the open trenches,RMU`s,Transformer yard etc, mounting the cable including clamping after providing loop at 1.2 Mtr depth, putting HDPE(PE 63.4 kg/sqcm) at rising point (0.5 Mtr below ground level and 1.5 Mtr above ground level) making RCC jointing chambers for straight joints if any, testing commissioning,placing route markers at 100 mtr interval, writing identificationname,dateoflaying,dateofcommisssioningetclegiblyon thecablerisingpolyurathanepaintetcasperthedirectionofdepartmental officers, providing with as built laminated cable route drawing, marking theHDDpits,distanceofpitsfromtheboundaryoftheroad,lengthofthe cable bit etc including the cost of all materials, labour and hire charges, loading the cable from KSEB stock yard and transporting the cable using contractor supplied trailer and unloading the same at work site. Complete except the cost of 3 core 300 sq.mm XLPE UG cablesuitablemodernsensingequipments,restoringthedamagesoccurredif |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 7 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 8 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP including conveyance of materials. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 11 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. |
| 12 | Fitting one set AB switch on existing DP, giving connection and drawing sufficientlengthofGIearthingleadstothegroundforearthing,excluding provision of earthing. |
| 13 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 14 | Quoted Amount of BOQ1 in figures |
| 15 | GST Rate in percentage Please Enable Macros to View BoQ information |