| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority :- EXECUTIVE ENGINEER ELECTRICAL DIVISION PWD B&R JALANDHAR NAME OF WORK:- Providing Solar Power Generation System Roof Top Plant at Raizada Hansraj Badminton Stadium, Distt. Jalandhar. Contract No: ELECTRICAL WORKS Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Name Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | A1-Grid Interactive PV System Solar Power Plant in Boys Hostel |
| 3 | Supply, Installation, testing & Commissioing of Grid interactive PV System Solar Power Plant (i.e connected to utility grid) of Minimum capacity including required quantities of SPV modules (High power density Monocrytalline based single module of capacity +400 watt) formed into arrays, their mounting arrangement, Power conditioning units (i.e String Solar Inverter with 2Nos. GI Chemical earthing with suitable size GI strip upto string inverter and AC & DC distribution panel), required DC & AC distribution panels with surge protection units, cabling from terrace to main distribution board through Cable tray, Bi Directional Energy Meter, Provision of Lightening Arrestor & 2 Nos. GI chemical earthing with suitable size GI strip upto Lightning arrestor, Hot dip galvanized MS Mounting Structures (1No. GI Chemical earthing with suitable size GI strip upto mounting structure) should be designed to withstand the speed for the wind Zone of the location (150 Km/hr-170 Km/hr) Complete in all respect with transportaion, fabrication, labour & Civil Work etc.Features:1. Solar PV Module warranty 25 Years & certified under IS/IEC 61730 I & II IS/IEC 61701 & IS/EC 142862. Power Conditioning unit (string solar inverter) & certified under IEC/EN 62109-1, IEC/EN 62109-2, EN 61000-6-2, EN 61000-6-3, IEC 61683, EN 50530, IEC 60068-2-1, 2, 14, 30, EN 605293. Structure 25 Years service life with AMC & certified under IS 2062 20114. Complete Plant insurance for the period of 5 Years (Excluding Theft of the Material)5. Annual Maintenance contract for the period of 10 Years |
| 4 | Conditions:# The Plant will be installed as per MNRE and GOI guidelines and specifications. (Detail ofmaterial as per Annexure-I attached)#The work will got done from approved MNRE (Misitry of New and Renewable Energy)/ PEDA(Punjab Energy Development Agency) contractor/ PWD enlisted contractors, subject to the condition that PWD enlisted contractor will get work done from MNRE/ PEDA approved contractor.#The capacity of solar power plant my increase or decrees as availability of site it can also betotally removed from executive endThe rate are inclusive of all taxes including GSTThe Rate are inclusive of Bi-directional metertesting charges, PSPCL connection charges, unidirectional meter cost and all type of taxes including GST. |
| 5 | XLPE INSULATED UN-ARMOURED CABLES (ON SURFACE): |
| 6 | Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathed Un-armoured and served cable 1100 volts grade as per IS 7098 (Part-1)1988 to be laid (On Surface) as per PWD General Specifications:- |
| 7 | Overall size 16sq.mm (4Core) Un-armoured (On-Surface) |
| 8 | A2-Grid Interactive PV System Solar Power Plant in Badminton Hall, Gym and Girls Hostel. |
| 9 | Supply, Installation, testing & Commissioing of Grid interactive PV System Solar Power Plant (i.e connected to utility grid) of Minimum capacity including required quantities of SPV modules (High power density Monocrytalline based single module of capacity +400 watt) formed into arrays, their mounting arrangement, Power conditioning units (i.e String Solar Inverter with 2Nos. GI Chemical earthing with suitable size GI strip upto string inverter and AC & DC distribution panel), required DC & AC distribution panels with surge protection units, cabling from terrace to main distribution board through Cable tray, Bi Directional Energy Meter, Provision of Lightening Arrestor & 2 Nos. GI chemical earthing with suitable size GI strip upto Lightning arrestor, Hot dip galvanized MS Mounting Structures (1No. GI Chemical earthing with suitable size GI strip upto mounting structure) should be designed to withstand the speed for the wind Zone of the location (150 Km/hr-170 Km/hr) Complete in all respect with transportaion, fabrication, labour & Civil Work etc.Features:1. Solar PV Module warranty 25 Years & certified under IS/IEC 61730 I & II IS/IEC 61701 & IS/EC 142862. Power Conditioning unit (string solar inverter) & certified under IEC/EN 62109-1, IEC/EN 62109-2, EN 61000-6-2, EN 61000-6-3, IEC 61683, EN 50530, IEC 60068-2-1, 2, 14, 30, EN 605293. Structure 25 Years service life with AMC & certified under IS 2062 20114. Complete Plant insurance for the period of 5 Years (Excluding Theft of the Material)5. Annual Maintenance contract for the period of 10 Years |
| 10 | Conditions:# The Plant will be installed as per MNRE and GOI guidelines and specifications. (Detail ofmaterial as per Annexure-I attached)#The work will got done from approved MNRE (Misitry of New and Renewable Energy)/ PEDA(Punjab Energy Development Agency) contractor/ PWD enlisted contractors, subject to the condition that PWD enlisted contractor will get work done from MNRE/ PEDA approved contractor.#The capacity of solar power plant my increase or decrees as availability of site it can also betotally removed from executive endThe rate are inclusive of all taxes including GSTThe Rate are inclusive of Bi-directional metertesting charges, PSPCL connection charges, unidirectional meter cost and all type of taxes including GST. |
| 11 | XLPE INSULATED UN-ARMOURED CABLES (ON SURFACE): |
| 12 | Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathed Un-armoured and served cable 1100 volts grade as per IS 7098 (Part-1)1988 to be laid (On Surface) as per PWD General Specifications:- |
| 13 | Overall size 16sq.mm (4Core) Un-armoured (On-Surface) |
| 14 | A3-Grid Interactive PV System Solar Power Plant in Admin Block |
| 15 | Supply, Installation, testing & Commissioing of Grid interactive PV System Solar Power Plant (i.e connected to utility grid) of Minimum capacity including required quantities of SPV modules (High power density Monocrytalline based single module of capacity +400 watt) formed into arrays, their mounting arrangement, Power conditioning units (i.e String Solar Inverter with 2Nos. GI Chemical earthing with suitable size GI strip upto string inverter and AC & DC distribution panel), required DC & AC distribution panels with surge protection units, cabling from terrace to main distribution board through Cable tray, Bi Directional Energy Meter, Provision of Lightening Arrestor & 2 Nos. GI chemical earthing with suitable size GI strip upto Lightning arrestor, Hot dip galvanized MS Mounting Structures (1No. GI Chemical earthing with suitable size GI strip upto mounting structure) should be designed to withstand the speed for the wind Zone of the location (150 Km/hr-170 Km/hr) Complete in all respect with transportaion, fabrication, labour & Civil Work etc.Features:1. Solar PV Module warranty 25 Years & certified under IS/IEC 61730 I & II IS/IEC 61701 & IS/EC 142862. Power Conditioning unit (string solar inverter) & certified under IEC/EN 62109-1, IEC/EN 62109-2, EN 61000-6-2, EN 61000-6-3, IEC 61683, EN 50530, IEC 60068-2-1, 2, 14, 30, EN 605293. Structure 25 Years service life with AMC & certified under IS 2062 20114. Complete Plant insurance for the period of 5 Years (Excluding Theft of the Material)5. Annual Maintenance contract for the period of 10 Years |
| 16 | Conditions:# The Plant will be installed as per MNRE and GOI guidelines and specifications. (Detail ofmaterial as per Annexure-I attached)#The work will got done from approved MNRE (Misitry of New and Renewable Energy)/ PEDA(Punjab Energy Development Agency) contractor/ PWD enlisted contractors, subject to the condition that PWD enlisted contractor will get work done from MNRE/ PEDA approved contractor.#The capacity of solar power plant my increase or decrees as availability of site it can also betotally removed from executive endThe rate are inclusive of all taxes including GSTThe Rate are inclusive of Bi-directional metertesting charges, PSPCL connection charges, unidirectional meter cost and all type of taxes including GST. |
| 17 | XLPE INSULATED UN-ARMOURED CABLES (ON SURFACE): |
| 18 | Supply, laying and erection of aluminium conductor XLPE insulated PVC sheathed Un-armoured and served cable 1100 volts grade as per IS 7098 (Part-1)1988 to be laid (On Surface) as per PWD General Specifications:- |
| 19 | Overall size 25sq.mm (4Core) Un-armoured (On-Surface) Total in Figures 1251842.0 1251842.0 INR Twelve Lakh Fifty One Thousand Eight Hundred & Forty Two Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |