| 1 | \\"As per Schedule \\"B\\" Comprehensive Annual Maintenance, calibration and testing of Electromagnetic flowmeter |
| 2 | Calibration & testing of 25mm Master flowmeters @ CWPRS Pune /IDEMI Mumbai including transportation from site to CWPRS Pune/IDEMI Mumbai , installation, dismantling, Testing at CWPRS/IDEMI and re transportation to site etc. complete. |
| 3 | Calibration & testing of 80 mm Master flowmeters @ CWPRS Pune/ IDEMI Mumbai including transportation from site to CWPRS Pune/IDEMI Mumbai, installation, dismantling,Testing at CWPRS/IDEMI and re transportation to site etc complete. |
| 4 | Calibration & testing of 200 mm Master flowmeter @ CWPRS Pune/ IDEMI Mumbai including transportation from site to works Pune and to CWPRS Pune / IDEMI C48Mumbai, its installation with required material for testing and dismantling after testing as per government labs condition at CWPRS/IDEMI and re transportation back to works and to site etc complete. |
| 5 | Dismantling of existing 200 mm dia flow meter from 300 mm dia gravity main and reinstallation after testing including all required hardware, nuts bolts , O‘rings neoprene rubber gaskets, tools tacles etc. complete and commissioning of meter for test facility. |
| 6 | Comprehensive annual maintenance of 25 mm Electro-Magnetic flowmeter during first / second / third year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material, labour, necessary spares, travel charges, etc. complete. The rate is for one year. |
| 7 | Comprehensive annual maintenance of 80 mm Electro-Magnetic flowmeter during first / second / third year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material, labour, necessary spares, travel charges, etc. complete. The rate is for one year. |
| 8 | Comprehensive annual maintenance of meter testing facility during first / second / third year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material such as Rubber Gaskets, O‘rings, Nuts bolts and any other required spares, labour, necessary spares, travel charges etc. complete. The rate is for one year. |
| 9 | Comprehensive annual maintenance of meter testing facility during first / second / third year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material such as Rubber Gaskets, O‘rings, Nuts bolts and any other required spares, labour, necessary spares, travel charges etc. complete. The rate is for one year. |
| 10 | Yearly subscription for software portal and continous Software upgradation to latest version of MiFlow CAL calibration Software for 3 years. The rate is for one year. |
| 11 | Supply of MiFlow Electromagnetic flowmeter with Mibel Mical software of size 80mm including testing of meter at CWPRS/IDEMI. |
| 12 | Supply of MiFlow Electromagnetic flowmeter with Mibel Mical software of size 100mm including testing of meter at CWPRS/IDEMI. |
| 13 | Installation of 80 mm & 100 mm dia flowmeter on 80 &100 mm dia pipeline at site with required flanged tail pipes, dismantling joint hardware, nuts bolts, O‘rings neoprene rubber gaskets, tools tacles transportation etc. complete |
| 14 | Calibration and testing of Flow meter @ work site using portable ultrasonic flow meter or any other standard device on yearly basis. at work site in 2nd & 3rd year |
| 15 | Comprehensive annual maintenance of 80 mm Electro-Magnetic flowmeter during year for each quarter, wth quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete(4 Qtrs x20000= 80000). The rate is for one year. |
| 16 | Comprehensive annual maintenance of 100 mm Electro-Magnetic flowmeter during year for each quarter, wth quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete(4 Qtrs x25000= 100000). The rate is for one year. |
| 17 | Providing, double flanged short body pattern type manually operated Butterfly Valve having body, disc and end cover in graded cast iron to IS-210 Gr.CF 200 generally confirming to IS-13095-1991, Synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in teflon bearing including inspection charges, transportation up to departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. excluding C.C. foundation /structural steel support. |
| 18 | 1) 80 mm. |
| 19 | 2) 100 mm. |
| 20 | 4) 150 mm. |
| 21 | 5) 200 mm. |
| 22 | Providing, erecting and commissioning M.S. Dismantling joint as per requirement and Department‘s approved drawing and specifications, including machining and rubber rings and suitable for 16 kg/cm2 working pressure with required flanges of suitable size with nut bolts etc complete. The joint should have through long bolts so that during normal working pressure there should be no sliding movement of sliding flanges. L.O.F. ( length over flange ) should not be less than 75% of dia. |
| 23 | PW 6-1) 100 mm dia Joint |
| 24 | PW 6-2) 150 mm dia Joint |
| 25 | PW 6-3) 200 mm dia Joint Please Enable Macros to View BoQ information |