| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-05-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 28-05-2026 |
| 2 | 11-05-2026 | DATE | Date | 21-05-2026 |
| 3 | 07-05-2026 | BOQ REVISED | BOQ | 21-05-2026 |
| 4 | 07-05-2026 | BOQ REVISED | BOQ | 16-05-2026 |
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: GE Utilities Udhampur Name of Work:Cleaning/Maintenance of sumps, tanks diving pool and captive water filter under GE (Utilities) Udhampur Contract No: GE/U-39/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Ser.No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT TOTAL AMOUNT In Words |
| 2 | Material and labour for mechanized cleaning and disinfection of sedimentation tank/ suction tank capacity of 3.0 lakh gallons with Six (6) stages possess mechanical dewatering, distillery and remove of left Over dirty water sludge, Clean the wall, roof and floor at Tawi Jack Well complete all as specified and directed by Engr-in-Charge. with the following stages :-STAGE - IMechanized Dewatering - Mechanized Dewatering should be done by dewatering pump having , suitable outlet and discharge and control panel. The details of motor cable, seal, material of construction and control panel should be furnished.STAGE – IISludge Removal – Desilting and removal of left over dirty Water sludge with a sludge removal pump.STAGE – IIIHigh Pressure Cleaning – Cleaning of wall , ceiling , and floor by high pressure of 80-180 bars. Cleaning should be done by high pressure cleaner with following specification Fully automatic controlled, auto start –slop, imported high pressure cleaning machined having F-Class insulation protection. The heavy duty machined should be operated by HPC operator, on Continuous duty in variable fully adjustable mode from working presser of 100-180 bars. The machine should have imported twin steel core protection rubber high pressure hose to safety. With stand operating pressure of 250 bar, and Two cleaning lances, one with rotary jet and the second one , a flat jet for effective Drinking Water Tank Operation.Contd to...1.01 & 1.02 |
| 3 | STAGE – IVVacuum Cleaning – Removal of remaining sludge from the floor with the help of industrial vacuum cleaner .(A) Removal of remaining sludge with the help of imported heavy duty industrial vacuum cleaner and sludge sucker having maximum power of 1200 watt, with suitable heavy duty motor.(B) Imported sludge sucker should be a part of the high pressure system which sucks sludge and through the same out of the tank , his must handle solid particles as well.STAGE – VAnti- Bacterial Spry – Spring of non- toxic- biodigrable, ecofriendly anti-bacterial agent to disinfect the tank from all harmful pathogens. The dose utilized should be safe as per WHO guideline.STAGE – VIUV Radiator – Treatment of inside of tank by exposing UV radiator to kill further suspended or floating bacteria if any- Treatment of inside tank be done by exposing UV radiation by imported heavy duty UV radiator. The radiator should be designed in away to ensure 360 degrees of sterilization and should have suitable lamps for effective sterilization for a period of 8000 working hours, the radiator must be totally portable and effective for final sterilization of drinking water tanks for elimination of floating and suspended bacteria….. |
| 4 | NOTES :- i) Contractor must clean and disinfect the water storage tank within 12 hours after giving the site by Engr-in-Charge to avoid the inconvenice for distribution of water supply to the connected area. ii) Contractor should be provide all safety tools to worker, in case of any accident during the work in progress the contractor will be fully responsible to give necessary medical aids and also compensate to worker under compensation act 1923. iii) No extra payment will be made for transportation of any machinaries required for cleaning and disinfecton the storage tank iv) Contractor must write the date of cleaning and capacity of tank at the wall of the storage tank in size of 2 ft x 2 ft base prepared by enamel paint. Base should be in light blue colour and letters should be white colour without extra payment.vi) While execution the work contractor must have all safety equipment and follow all safety parameter at site. |
| 5 | Description all as per serial item No 01 here-in-before but Suction tank/collection tank of 1.0 lakh gallons at Jib water point location alongwith the capacity of the tank, complete all as specified and directed by Engr-in-Charge. |
| 6 | Description all as per serial item No 01 here-in-before but Suction tank/collection tank of 75000 gallons at Tawi Jack Well & Jib water point at defferent size and location alongwith the capacity of the tank, complete all as specified and directed by Engr-in-Charge. |
| 7 | Description all as per serial item No 01 here-in-before but Suction tank/collection tank of 8000 gallons at Jib water point & Old medical complex alongwith the capacity of the tank, complete all as specified and directed by Engr-in-Charge. |
| 8 | Description all as per serial item No 01 here-in-before but Suction tank/collection tank of 50000 gallons at Golf Course alongwith the capacity of the tank, complete all as specified and directed by Engr-in-Charge. |
| 9 | Description all as per serial item No 01 here-in-before but Suction tank/collection tank of 2.0 LG at Tawi filter plant alongwith the capacity of the tank, complete all as specified and directed by Engr-in-Charge. |
| 10 | Material and labour for mechanized cleaning and disinfection of under ground sump cap 5 lakh gallon with Six (6) stages possess mechanical dewatering, distillery and remove of left Over dirty water sludge, Clean the wall, roof and floor at MH Filtration plant area complete all as specified and directed by Engr-in-Charge. with the following stages :-STAGE - IMechanized Dewatering - Mechanized Dewatering should be done by dewatering pump having , suitable outlet and discharge and control panel. The details of motor cable, seal, material of construction and control panel should be furnished.STAGE – IISludge Removal – Desilting and removal of left over dirty Water sludge with a sludge removal pump.STAGE – IIIHigh Pressure Cleaning – Cleaning of wall , ceiling , and floor by high pressure of 80-180 bars. Cleaning should be done by high pressure cleaner with following specification Fully automatic controlled, auto start –slop, imported high pressure cleaning machined having F-Class insulation protection. The heavy duty machined should be operated by HPC operator, on Continuous duty in variable fully adjustable mode from working presser of 100-180 bars. The machine should have imported twin steel core protection rubber high pressure hose to safety. With stand operating pressure of 250 bar, and Two cleaning lances, one with rotary jet and the second one , a flat jet for effective Drinking Water Tank Operation. Contd to...7.01 & 7.02 |
| 11 | STAGE – IVVacuum Cleaning – Removal of remaining sludge from the floor with the help of industrial vacuum cleaner .(A) Removal of remaining sludge with the help of imported heavy duty industrial vacuum cleaner and sludge sucker having maximum power of 1200 watt, with suitable heavy duty motor.(B) Imported sludge sucker should be a part of the high pressure system which sucks sludge and through the same out of the tank , his must handle solid particles as well.STAGE – VAnti- Bacterial Spry – Spring of non- toxic- biodigrable, ecofriendly anti-bacterial agent to disinfect the tank from all harmful pathogens. The dose utilized should be safe as per WHO guideline.STAGE – VIUV Radiator – Treatment of inside of tank by exposing UV radiator to kill further suspended or floating bacteria if any- Treatment of inside tank be done by exposing UV radiation by imported heavy duty UV radiator. The radiator should be designed in away to ensure 360 degrees of sterilization and should have suitable lamps for effective sterilization for a period of 8000 working hours, the radiator must be totally portable and effective for final sterilization of drinking water tanks for elimination of floating and suspended bacteria….. |
| 12 | NOTES :- i) Contractor must clean and disinfect the water storage tank within 12 hours after giving the site by Engr-in-Charge to avoid the inconvenice for distribution of water supply to the connected area. ii) Contractor should be provide all safety tools to worker, in case of any accident during the work in progress the contractor will be fully responsible to give necessary medical aids and also compensate to worker under compensation act 1923. iii) No extra payment will be made for transportation of any machinaries required for cleaning and disinfecton the storage tank iv) Contractor must write the date of cleaning and capacity of tank at the wall of the storage tank in size of 2 ft x 2 ft base prepared by enamel paint. Base should be in light blue colour and letters should be white colour without extra payment.vi) While execution the work contractor must have all safety equipment and follow all safety parameter at site. |
| 13 | Description all as per serial item No 07.00 here-in-before but clear water sump of 2 lakh gallons capacity at MH filttration plant area, complete all as specified and directed by Engr-in-Charge. |
| 14 | Description all as per serial item No 0.70 here-in-before but clear water sump of 1.5 lakh gallons capacity at Tawi filtration plant area, complete all as specified and directed by Engr-in-Charge. |
| 15 | Description all as per serial item No 07.00 here-in-before but clear water sump of 1.5 gallons capacity at MH filtration plant area, complete all as specified and directed by Engr-in-Charge. |
| 16 | Description all as per serial item No 07.00 here-in-before but Rectangular clear water sump of 1 lakh gallons capacity having 2 partitions at Jib filter plant, complete all as specified and directed by Engr-in-Charge. |
| 17 | Description all as per serial item No 07.00 here-in-before but Rectangular clear water sump of 50000 gallons at Jib filter point, complete all as specified and directed by Engr-in-Charge. |
| 18 | Description all as per serial item No 07.00 here-in-before but Semi U/G clear water sump of 1 lakh gallons at Jib filter point, complete all as specified and directed by Engr-in-Charge. |
| 19 | Description all as per serial item No 07.00 here-in-before but Semi U/G clear water sump of 1 lakh gallons capacity at MH Filteration Plant, complete all as specified and directed by Engr-in-Charge. |
| 20 | Description all as per serial item No 07.00 here-in-before but Semi U/G clear water sump of 60000 gallons capacity at Sansar Chand Vihar, complete all as specified and directed by Engr-in-Charge. |
| 21 | Description all as per serial item No 07.00 here-in-before but Circular U/G clear water storage tank of capacity 3.00 lakh gallons at 'B' Res area, complete all as specified and directed by Engr-in-Charge. |
| 22 | Description all as per serial item No 07.00 here-in-before but Circular U/G clear water storage tank of capacity 1.25 lakh gallons at Naubat Ram Vihar, complete all as specified and directed by Engr-in-Charge. |
| 23 | Description all as per serial item No 07.00 here-in-before but Rectangular underground clear water storage tank of capacity 50000 gallons at 'B' Reservior, complete all as specified and directed by Engr-in-Charge. |
| 24 | Description all as per serial item No 07.00 here-in-before but underground sump rectangular clear water storage tank of capatiy 25000 gallons at 15 FAD, complete all as specified and directed by Engr-in-Charge. |
| 25 | Description all as per serial item No 07.00 here-in-before but Circular clear water storage tank of capacity 50000 gallons at 15 FAD, complete all as specified and directed by Engr-in-Charge. |
| 26 | Description all as per serial item No 07.00 here-in-before but of RCC reservoirs of capacity of 50000 gallons underground sump at MPH area, complete all as specified and directed by Engr-in-Charge. |
| 27 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 4625 gallons at NSOI area, complete all as specified and directed by Engr-in-Charge. |
| 28 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 10000 gallons at `A' Mess, MPH area, Taramount Kutir House, Ashok Vihar, Chinar PH (02 Nos), Old medical complex complete all as specified and directed by Engr-in-Charge. |
| 29 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 50000 gallons at NCSR area and AEE, complete all as specified and directed by Engr-in-Charge. |
| 30 | Description all as per serial item No 07.00 here-in-before but Rectangular clear water sump of 50,000 gallons capacity at NCSR & 15 FAD complete all as specified and directed by Engr-in-Charge. |
| 31 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 100000 gallons at Bikram Enclve pump house, complete all as specified and directed by Engr-in-Charge. |
| 32 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 100000 gallons at Ananat Ram Vihar, complete all as specified and directed by Engr-in-Charge. |
| 33 | Description all as per serial item No 07.00 here-in-before but Rectangular clear water sump of 1,00,000 gallons capacity having 2 partitions at Tawi filter, complete all as specified and directed by Engr-in-Charge. |
| 34 | Description all as per serial item No 07.00 here-in-before but of RCC under ground sump of capacity 2.0 gallons at R centre, complete all as specified and directed by Engr-in-Charge. |
| 35 | M&L for painting the outer periphery of underground sump with approved blue colour paint, including surface preparation, cleaning, removal of dust, dirt, grease, and loose particles, applying one coat of primer and two coats of synthetic enamel paint of approved shade, of RCC under ground sump tank of capaicty 5 lakhs gallons including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour complete all as specified and directed by Engr-in-charge. |
| 36 | M&L for painting the outer periphery of underground sump with approved blue colour paint, including surface preparation, cleaning, removal of dust, dirt, grease, and loose particles, applying one coat of primer and two coats of synthetic enamel paint of approved shade, of RCC under ground sump tank of capaicty 2 lakhs gallons including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour complete all as specified and directed by Engr-in-charge. |
| 37 | M&L for painting the outer periphery of underground sump with approved blue colour paint, including surface preparation, cleaning, removal of dust, dirt, grease, and loose particles, applying one coat of primer and two coats of synthetic enamel paint of approved shade, of RCC under ground sump tank of capaicty 1.5 lakhs gallons including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour complete all as specified and directed by Engr-in-charge. |
| 38 | M&L for painting the outer periphery of underground sump with approved blue colour paint, including surface preparation, cleaning, removal of dust, dirt, grease, and loose particles, applying one coat of primer and two coats of synthetic enamel paint of approved shade, of RCC under ground sump tank of capaicty 1 lakhs gallons including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour complete all as specified and directed by Engr-in-charge. |
| 39 | M&L for painting the outer periphery of underground sump with approved blue colour paint, including surface preparation, cleaning, removal of dust, dirt, grease, and loose particles, applying one coat of primer and two coats of synthetic enamel paint of approved shade, of RCC under ground sump tank of capaicty 50000 gallons including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour complete all as specified and directed by Engr-in-charge. |
| 40 | Material and labour for mechanized cleaning and disinfection of OHT 1.5 lakh gallons with Six (6) stages possess mechanical dewatering, distillery and remove of left Over dirty water sludge, Clean the wall, roof and floor 1.5 Lakh gallons capacity upto 45 mtr stagging at `A' Reserviour area/ NCHNC complete all as specified and directed by Engr-in-Charge. with the following stages :-STAGE - IMechanized Dewatering - Mechanized Dewatering should be done by dewatering pump having , suitable outlet and discharge and control panel. The details of motor cable, seal, material of construction and control panel should be furnished.STAGE – IISludge Removal – Desilting and removal of left over dirty Water sludge with a sludge removal pump.STAGE – IIIHigh Pressure Cleaning – Cleaning of wall , ceiling , and floor by high pressure of 80-180 bars. Cleaning should be done by high pressure cleaner with following specification Fully automatic controlled, auto start –slop, imported high pressure cleaning machined having F-Class insulation protection. The heavy duty machined should be operated by HPC operator, on Continuous duty in variable fully adjustable mode from working presser of 100-180 bars. The machine should have imported twin steel core protection rubber high pressure hose to safety. With stand operating pressure of 250 bar, and Two cleaning lances, one with rotary jet and the second one , a flat jet for effective Drinking Water Tank Operation. Contd to...35.01 & 35.02 |
| 41 | STAGE – IVVacuum Cleaning – Removal of remaining sludge from the floor with the help of industrial vacuum cleaner .(A) Removal of remaining sludge with the help of imported heavy duty industrial vacuum cleaner and sludge sucker having maximum power of 1200 watt, with suitable heavy duty motor.(B) Imported sludge sucker should be a part of the high pressure system which sucks sludge and through the same out of the tank , his must handle solid particles as well.STAGE – VAnti- Bacterial Spry – Spring of non- toxic- biodigrable, ecofriendly anti-bacterial agent to disinfect the tank from all harmful pathogens. The dose utilized should be safe as per WHO guideline.STAGE – VIUV Radiator – Treatment of inside of tank by exposing UV radiator to kill further suspended or floating bacteria if any- Treatment of inside tank be done by exposing UV radiation by imported heavy duty UV radiator. The radiator should be designed in away to ensure 360 degrees of sterilization and should have suitable lamps for effective sterilization for a period of 8000 working hours, the radiator must be totally portable and effective for final sterilization of drinking water tanks for elimination of floating and suspended bacteria….. |
| 42 | NOTES :- i) Contractor must clean and disinfect the water storage tank within 12 hours after giving the site by Engr-in-Charge to avoid the inconvenice for distribution of water supply to the connected area. ii) Contractor should be provide all safety tools to worker, in case of any accident during the work in progress the contractor will be fully responsible to give necessary medical aids and also compensate to worker under compensation act 1923. iii) No extra payment will be made for transportation of any machinaries required for cleaning and disinfecton the storage tank iv) Contractor must write the date of cleaning and capacity of tank at the wall of the storage tank in size of 2 ft x 2 ft base prepared by enamel paint. Base should be in light blue colour and letters should be white colour without extra payment.vi) While execution the work contractor must have all safety equipment and follow all safety parameter at site. |
| 43 | Description all as per serial item No 35.00 here-in-before but Over head tank of capacity 600000 gallons at CHNC seperated in three prtion by baffle wall in between complete all as specified and directed by Engr-in-charge.. |
| 44 | Description all as per serial item No 35.00 here-in-before but Over head tank of capacity 50000 gallons at CHNC, complete all as specified and directed by Engr-in-charge. |
| 45 | Description all as per serial item No 35.00 here-in-before but over Head tank of capacity 50000 gallons at following area Key personel Qtrs, 4 Para, Arty, 9 Para, Chibber Enclave(New and old) , 12 DOGRA, complete all as specified and directed by Engr-in-charge. |
| 46 | Description all as per serial item No 35.00 here-in-before but Over head tank of capacity 30000 gallons at 4/3 GR, complete all as specified and directed by Engr-in-charge. |
| 47 | Description all as per serial item No 35.00 here-in-before but Over head tank of capacity 75000 gallons at 203 Engr Regt and Krimchi complex, Ashok Vihar, R Centre, complete all as specified and directed by Engr-in-charge. |
| 48 | Description all as per serial item No 35.00 here-in-before but Overhead tank of capaicty 50000 gallons at 874 'A' Coy, 14 EME, R Centre, complete all as specified and directed by Engr-in-charge. |
| 49 | Description all as per serial item No 35.00 here-in-before but Overhead tank of capacity 25000 gallons at Tawi filter plant, complete all as specified and directed by Engr-in-charge. |
| 50 | Description all as per serial item No 35.00 here-in-before but Overhead tank of capacity 100000 gallons a JNE (5071 ASC Bn), complete all as specified and directed by Engr-in-charge. |
| 51 | Description all as per serial item No 35.00 here-in-before but of RCC reservoirs of capacity 50000 gallons of 12 mtr staging at PBE area, Taramount, CP colony, 'A' Mess, Bikram Enclave, NCSR & Sapper Enclave, complete all as specified and directed by Engr-in-charge. |
| 52 | Description all as per serial item No 35.00 here-in-before but Overhead tank of capacity 40,000 Ltr at MAP accns complete all as specified and directed by Engr-in-charge. |
| 53 | Description all as per serial item No 35.00 here-in-before but Overhead tank of capacity 40,000 Ltr at MAP accns complete all as specified and directed by Engr-in-charge. |
| 54 | Description all as per serial item No 35.00 here-in-before but Overhead tank made up of Steel of capacity 25000 gallons a Jib Filter Plant , complete all as specified and directed by Engr-in-charge. |
| 55 | Description all as per serial item No 35.00 here-in-before but of PVC/RCC tanks of capacity1000 Ltrs to 5000 Ltrs at PBE area, Taramount, CP colony, 'A' Mess, Bikram Enclave Station HQ,Krimachi area,Transit camp, Sapper Enclave, New CHNC, Kuttir House & Ashok Vihar, complete all as specified and directed by Engr-in-charge. |
| 56 | M&L for painting complete outer surrounding of Over head tank of capaicty 100000 gallons in Tiranga Colour including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour on center white colour, complete all as specified and directed by Engr-in-charge. |
| 57 | M&L for painting complete outer surrounding of Over head tank of capaicty 75000 gallons in Tiranga Colour including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour on center white colour , complete all as specified and directed by Engr-in-charge. |
| 58 | M&L for painting complete outer surrounding of Over head tank of capaicty 50000 gallons in Tiranga Colour including writing of \\"SAVE WATER, SAVE LIFE \\" in blue colour on center white colour, complete all as specified and directed by Engr-in-charge. |
| 59 | Description all as per serial item No 35.00 here-in-before but Hopper tank (size 5 x4 x 4.5 metre) capacity of 300000 gallons at Tawi filter plant complete all as specified and directed by Engr-in-charge. |
| 60 | Description all as per serial item No 35.00 here-in-before but Hopper tank (size 5 x4 x 4.5 metre) capacity of 500000 gallon at Tawi filter point complete all as specified and directed by Engr-in-charge. |
| 61 | Description all as per serial item No 35.00 here-in-before but swimming pool (NSOI) of capacity 2.5 gallons complete all as specified and directed by Engr-in-charge. |
| 62 | Description all as per serial item No 35.00 here-in-before but from the clarifloculator tank circular type capacity 500000 gallon of size 16 metre dia and 4.0 metre depth at Tawi filter point,and 2xMH Filtration plant complete all as specified and directed by Engr-in-charge. |
| 63 | Making of temporary bundth using existing material from river bed of length 40 mtrs (approx) width 2.20 meter (approx) of height 1.65 metrs in Tawi river at intake water point area for cleaning of Tawi low lift pump house of suction point to main stream of Tawi river running water flow diversion into suction point by removing all the silt, ballies, boulders and sand collected at suction point of Tawi low lift pump house (new and old) contractor shall provide be necessary sand bag with excavator, and labour, complete all as specified and directed by Engr-in-charge.Note: The rate quoted by contractor for this item includes:-(i) All the dirt/silt/vegetation removed by the contractor while cleaning will be dumped to a distance not exceeding 250 meters and depositing where directed.(ii) Arrangement for the portable pump required for empting the Reservoirs at installation & other places will be made by the contractor. |
| 64 | M&L for dewatering the musical fountain sump, cleaning with cleaning agents & metal wire brush, washing all sides of walls and floor including removing water, mud, silt, slash and foreign materials obtained while cleaning the sump including cleaning the nozzles by opening them and refixing them after cleaning to the entire satisfaction and, complete all as specified and directed by Engr-in-charge. |
| 65 | The following parameter are to be analysed for raw/treated water used for drinking purpose as per IS-TI-01/2010, complete all as specified and directed by Engr-in-Charge.(i). Turbidity,NTU,Max(ii). PH Valve(iii).E Coli,MPN/100 mli. (iv)Total hardness (as CaCO3) MG/L,Max(v). Iron (as Fe), mg/L, Max(vi). Magnesium (as Mg), mg/L, Max(vii). Sulphate (as SO4), mg/L, MaxNote : Testing to be carried out at IIT/ NIT/CSIR/ Any NAPL Approved Lab |
| 66 | S&F in replacement candle/filter media complete set for RO system of capacity 250 LPH, complete all as specified and directed by Engr-in-charge. |
| 67 | S&F in replacement candle/filter media complete set for RO system of capacity 150 LPH, complete all as specified and directed by Engr-in-charge. |
| 68 | S&F in replacement candle/filter media complete set for RO system of capacity 120 LPH, complete all as specified and directed by Engr-in-charge. |
| 69 | S&F in replacement candle/filter media complete set for RO system of capacity 50 LPH, complete all as specified and directed by Engr-in-charge. |
| 70 | S&F in replacement candle/filter media complete set for water purifire of capacity 3.5 LPH, complete all as specified and directed by Engr-in-charge. |
| 71 | S&F in replacement RO membrane complete set of RO system of capacity 250 LPH, complete all as specified and directed by Engr-in-charge. |
| 72 | S&F in replacement RO membrane complete set for RO system of capacity 150 LPH, complete all as specified and directed by Engr-in-charge. |
| 73 | S&F in replacement RO membrane complete set for RO system of capacity 120 LPH, complete all as specified and directed by Engr-in-charge. |
| 74 | S&F in replacement RO membrane complete set for RO system of capacity 50 LPH, complete all as specified and directed by Engr-in-charge. |
| 75 | S&F in replacement RO membrane complete set of water purifier of capacity 3.5 LPH, complete all as specified and directed by Engr-in-charge. |
| 76 | S&F in replacement RO UV complete set for RO system of capacity 250 LPH, complete all as specified and directed by Engr-in-charge. |
| 77 | S&F in replacement RO UV complete set for RO system of capacity 150 LPH, complete all as specified and directed by Engr-in-charge. |
| 78 | S&F in replacement RO UV complete set for RO system of capacity 120 LPH, complete all as specified and directed by Engr-in-charge. |
| 79 | S&F in replacement RO UV complete set for RO system of capacity 50 LPH, complete all as specified and directed by Engr-in-charge. |
| 80 | S&F in replacement RO UV complete set for water purifire of capacity 3.5 LPH, complete all as specified and directed by Engr-in-charge. |
| 81 | S&F in repair/ replacement RO pump for RO system of capacity 120 LPH to 250 LPH including motor winding, pump repair, complete all as specified and directed by Engr-in-charge. |
| 82 | S&F in replacement RO pump for RO system of capacity 50 LPH LPH, complete all as specified and directed by Engr-in-charge. |
| 83 | S&F in replacement RO pump for RO system of capacity 3.5 LPH, complete all as specified and directed by Engr-in-charge. |
| 84 | S&F in replacement SMPS adapter of RO system of capacity 120/150 LPH, complete all as specified and directed by Engr-in-Charge. |
| 85 | S&F in replacement SMPS adapter of RO system of capacity 50 LPH, complete all as specified and directed by Engr-in-Charge. |
| 86 | S&F in replacement SMPS adapter of RO system of capacity 3.5 LPH, complete all as specified and directed by Engr-in-Charge. |
| 87 | S&F in replacement of FRT, solenoid valve, water pipe of existing make & specifications for RO system, complete all as specified and directed by Engr-in-Charge. |
| 88 | S&F in replacement of PVC 'T' junction, fittings of suitable RO of capacity upto 250 LPH of existing make & specifications, complete all as specified and directed by Engr-in-Charge. |
| 89 | Servicing of Aquaguard/RO/water purifier of cap 50 LPH to 250 LPH including washing of filter, taking out scaling etc refixing for reuse, complete all as specified and directed by Engr-in-Charge. |
| 90 | Servicing of Aquaguard/RO/water purifier of cap 3.5 LPH including washing of filter, taking out scaling etc refixing for reuse, complete all as specified and directed by Engr-in-Charge. |
| 91 | Supply only spraying herbicide 1 ltr pack (Round up) on area to remove unwanted vegitation/grass at various locations complete all as specified and directed by Engr-in-Charge. |
| 92 | M&L for mannual agriculture sprayer plastic made of 16-20 ltr tank capacity with back support, sprayer machine includes a handle,3 nozzle sets,lance,clutch,spray pump piston etc complete all as specified and directed by Engr-in-Charge. |
| 93 | M&L for painting of complete setup of pipeline, sluice valve, mushroom type valve,etc of filter bed of cap upto 40000 GPH including surface preparation by scrapping with emery paper and painting with one coat of red oxide primer and two coats of synthetic enamel paint of black colour of approved make to the satisfaction of Engr in Charge |
| 94 | M&L for taking out sludge /foreign material/silt/ vegetation/mud from surface of water channels at Jib water point of size 120-150 mtr long, 3-4 mtr wide & 1-2 mtr depth, suitable T&P/manpower for removing sludge /foreign material/silt/ vegetation/mud from water channel and cleaning the wall with the help of blade /scrapper/wire brush using disinfectant after repairing cracks/ depressions/cavities by filling cement mortar CM1:3 mixed with liquid water proofing admixture/ best quality putty after applying cement slurry @ 3kg/SM mixed with liquid water proffing admixture to entire statisfaction of Engr-in-Charge preparation of old surface and aplying one coat of lime wash on inner surface including removing the sludge/silt/foregin material by using suitable T&P/man power to a distance not exceeding 250 meters and depositing where directed as and when on requirement basis, complete all as specified and directed by Engr-in-Charge.Note: Date of cleaning should be written in white colour on black background after cleaning & rate of this should be included in quoted rate. |
| 95 | Supply, filling and placing of sand bags for formation of temporary bandh/bund in river or nallah, using HDPE/PP woven bags of minimum 600 GSM, size approx. 600 mm × 1000 mm, filled with clean coarse sand 45 KG(free from silt, clay and organic impurities), mouth properly stitched/secured, laid in position in layers including dressing, compacting, and proper interlocking to prevent leakage, complete all as specified and as directed by Engineer-in-Charge, including all labour, materials, loading, unloading, carriage, leads and lifts. |
| 96 | Supply and fix in replacement cast iron sluice valve suitable of size 150 mm (PN 1.6) ISI Marked with iron wheel head both end flanged, non rising type and jointing with the rubber or fibre board gasket complete with and including required nos size of nuts, bolts and washers including taking down the old existing, complete all as specified and directed by Engr-in-Charge.. |
| 97 | Description all as per ser item 89.00 here-in-before but of size 100 mm dia |
| 98 | Description all as per ser item 89.00 here-in-before but of size 80 mm dia |
| 99 | Material & labour for prepration of old MS/DI/CI pipe painted surface and aplying two coat of synthetic enamel paint over a coat of red oxide primer , complete all as specified and directed by Engr-in-Charge. |
| 100 | Supply only lithium base grease AP3 in 20 Kg pack suitable for application to ball bearing with operating temperature 30 to 120 degree celsius drop point 174 degree celsius, colour light fawn complete all as specified and directed by Enr-in-Charge |
| 101 | S&F in replacement of pop-up sprinklers having radius throw 20 meters and flow minimum 1.2 LPS at an operative pressure 4-6 kg/sqcm. The sprinkler shall be impact driven rotary with provision for adjusting at any degree of rotating having 01 inlet 20 mm pop up stoke, self flushing with pop-up sheild made of virgin grade engineering, plastic body, sprinkler shall be non corrodible, heavy duty complete all as specified and directed by Engineer-in-Charge. |
| 102 | M&L for earthing complete with galvanised steel earth plate electrode 60 cm x 60 cm x 6.0mm thick buried directly in ground, (Earth pit not less than 2.25 mtr deep below ground level) with top edge of plate not less than 1.5 mtr below normal ground level, connected to galvanised iron strip 32×6mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanised standard iron or steel all as specified or indicated in electrical plate no 3 of MES Part-I, including testing on completion including the material and labour of the following :-(a) Excavation and earth work for drilling hole for electrode in any type of soil. (b) PCC pit in cement concrete 1:2:4 type B-1.(c) Precast RCC cover with suitable handle 40 mm thick in PCC 1:2:4 type B-1, reinforced with welded steel wire fabric weighing not less than 1.87 Kg/Sqm.(d) Funnel with watering pipe of GI 20 mm nominal bore medium grade and copper lugs etc all as specified. (e) 15 mm nominal bore light grade GI protection pipe 7.5 mtr long for protection of earthing lead from mechanical injury or tempering. (f) Requisite quantity of common salt and charcoal.(g) Testing of earthing.Note : On testing after completion of earthing, if the desired earth resistance is not obtained, the earthing will be re-done by the contractor at his own risk and cost to the entire satisfaction of the Engineer-in-Charge. |
| 103 | M&L prepainted galvanized aluminium zink coating GI based plain steel sheet 0.50mm thick of an colour having tensile strength of 550Mpa as in OHT covering, fixed with self tapping screws complete all as specified and directed by Engr-in-Charge. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail