| 1 | Excavation in trenches not exc.1.5 mtr wide and not exc.1.5 m in depth for laying of pipes as in hard soil and getting out, complete all as specified and directed. |
| 2 | Returning, filling, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm in any type of soil, complete all as specified and directed. |
| 3 | Removal of excavated material to a distance not exc.50 m and depositing where directed at a level not exceeding 1.5 mtr above starting point. |
| 4 | Supply and laying Cast iron pipes with spigot and sockets ends centrifugally, Class LA in 150 mm size laid in trenches & including taking down old one complete all as specified and directed. |
| 5 | Supply and laying Cast iron pipes with spigot and sockets ends centrifugally, Class LA in 100 mm size laid in trenches & including taking down old one complete all as specified and directed. |
| 6 | Supply and laying cast iron pipes with spigot and sockets ends centrifugally, Class LA in 80 mm size laid in trenches & including taking down old one complete all as specified and directed. |
| 7 | Supply & fixing cast iron bends (any Type radius and angle tapers any type (straight, bend, increasing decreasing or double sockets etc) Tee pieces single branch 'Y' Junction, double branch, cross (all sockets or sockets and spigot) collars caps and plugs upto 150mm bore complete all as specified and directed. |
| 8 | M&L for M&L for run joint for CI pipe spigot and socket pipes and fittings of 80 mm bore complete all as specified and directed. |
| 9 | M&L for run joint for CI pipe spigot and socket pipes and fittings of 100 mm bore complete all as specified and directed. |
| 10 | M&L for run joint for CI pipe spigot and socket pipes and fittings of 150 mm bore complete all as specified and directed. |
| 11 | S&F GI water tubing 15mm bore 'medium grade', galvanized, with all fittings like socket, union, elbow, bend, tees etc jointed and laid in trenches including taking down old one complete all as specified and directed. |
| 12 | All as per description of ser item No.11 above but 20mm. |
| 13 | All as per description of ser item No.11 above but 25mm. |
| 14 | All as per description of ser item No.11 above but 40mm. |
| 15 | All as per description of ser item No.11 above but 50mm. |
| 16 | All as per description of ser item No.11 above but 80mm. |
| 17 | S&F gun metal, globe or gate valve with iron wheel head, screwed both ends for iron pipe and fixed of bore of 15mm complete all as specified and directed. |
| 18 | All as per description of ser item No-17 above but 20mm. |
| 19 | All as per description of ser item No-17 above but 25mm. |
| 20 | All as per description of ser item No-17 above but 40mm. |
| 21 | All as per description of ser item No-17 above but 50mm. |
| 22 | Taking down old unserviceable old sluice valve and supply and fixing ball valve having SS ball with both CI end flanged, ISI marked, with nuts, bolts and washer and rubber gasket with stainless steel handle over PVC coating complete all as specified and directed for 80 mm bore pipe complete all as specified and directed. |
| 23 | Taking down old unserviceable old sluice valve and supply and fixing sluice valve cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation, packing rings, jointing materials nuts, bolts washer, gasket and packings material etc all as specified and directed for 100 mm dia complete all as specified and directed. |
| 24 | Taking down old unserviceable old sluice valve and supply and fixing sluice valve cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation, packing rings, jointing materials nuts, bolts washer, gasket and packings material etc all as specified and directed for 150 mm dia complete all as specified and directed. |
| 25 | Taking down old unserviceable old sluice valve and supply and fixing sluice valve cast iron ISI marked with flanged ends drilled with iron wheels head shuts and open direction cast on it class PN 1.6 confirming to IS 14846-2000 including necessary fixing arrangement such as rubber insulation, packing rings, jointing materials nuts, bolts washer, gasket and packings material etc all as specified and directed for 200 mm dia complete all as specified and directed. |
| 26 | Supply and fixing in replacement CI Non return valve of size 100mm bore without bypass arrangement swing type confirming to IS 5312-1 flanged end, pressure rating PN 1.6 complete all as specified and directed. |
| 27 | Supply and fixing in replacement CI Non return valve of size 80mm bore without bypass arrangement swing type confirming to IS 5312 flanged end pressure rating PN 1.6 complete all as specified and directed. |
| 28 | M&L for lagging to pipes used in internal water supply or plumbing all round with, 25min thick bonded mineral wool preformed and covering the mineral wool with POP and ‘SNAP ON’ pipe sections of tin sheet conforming to IS 9842 for 20 mm dia pipe line complete all as specified and directed. |
| 29 | M&L for lagging to pipes used in internal water supply or plumbing all round with, 25min thick bonded mineral wool preformed and covering the mineral wool with POP and ‘SNAP ON’ pipe sections of tin sheet conforming to IS 9842 for 25 mm dia pipeline complete all as specified and directed. |
| 30 | Supply and fix in replacement of 10 Sqmm 3 Core submersible copper conductor flat type for submersible pump complete all as specified and directed. |
| 31 | Dewatering and taking out sludge from tank of size and capacity (10000 to 40000Gln), removing the same to a distance not exceeding 50m with & including, cleaning the sump by wire brushing including, including brooming down complete including white washing internally complete all as specified and directed. |
| 32 | Dewatering of sump by pumping, sedimentation tank capacity 3,20,000 ltrs, and taking out sludge, removing the same to a distance not exceeding 50m with & including, cleaning the sump by wire brushing, including brooming down complete including white washing internally, complete all as directed by the Engr-in-charge. Note :- Sump will be clean 2 times, first clean at the start month of the contract and second will be after 6 month of first cleaning date . |
| 33 | M&L for repair & replacement of Supply, Installation, testing and commissioning of centrifugal pump set with bronze impeller having minimum discharge of 1050 LPM at head 225 mtr coupled with suitable capacity of electric motor 415 volts 3 phase 50Hz having 1440 RPM mono block and having power capacity not less than 60HP/45 KW, fixed on MS channel 100mm duly grouted with suitable size of nuts and bolts in PCC foundation and starter as per manufacturers recommendation including material and labour for making electric connection with including suitable size of three core stranded XLPE copper cable (As per site requirement) through laid in cable duct /trenches/pole from starter to electric motor of pumping set and necessary water supply connection for suction and delivery side of pump set with suitable size of medium grade GI pipe complete upto complete all as specified and directed. |
| 34 | Supply & Fixing (after testing at site) fully automatic star delta starter for 60 HP/45 KW (over load relay range 45 Amps to 65 Amps) Centrifugal pump motor /submersible pump provide with protection degree IP 54, confirming to IS/IEC-60947-4-1, contractor size 50, Extended wide band coil, Starter type Air Break, FRLS internal wiring complete all as specified and directed. |
| 35 | Supply & Fixing (after testing at site) fully automatic star delta starter for 40 HP/32 KW (over load relay range 22 Amps to 32 Amps) Centrifugal pump motor /submersible pump provide with protection degree IP 54, confirming to IS/IEC-60947-4-1, contractor size 32, Extended wide band coil, Starter type Air Break, FRLS internal Wiring complete all as specified and directed. |
| 36 | Supply & Fixing (after testing at site) fully automatic star delta starter for 20 HP/16 KW (over load relay range 15 Amps to 22 Amps) Centrifugal pump motor /submersible pump provide with protection degree IP 54, confirming to IS/IEC-60947-4-1, contractor size 25, Extended wide band coil, Starter type Air Break, FRLS internal Wiring complete all as specified and directed. |
| 37 | Supply & Fixing (after testing at site) fully automatic star delta starter for 15 HP/12 KW (over load relay range 12 Amps to 18 Amps) Centrifugal pump motor /submersible pump (as Per site requirement) provide with protection degree IP 54, confirming to IS/IEC-60947-4-1, contractor size 22, Extended wide band coil, Starter type Air Break, FRLS internal Wiring complete all as specified and directed. |
| 38 | Material and labour for repair of centrifugal motor pump set 60 HP (Rewinding job will be measured separately), including removing the motor pump from the foundation, disconnecting from the motor and transporting to the work shop for repair including replacement of worn out impellers-01 set with bronze impellers, replacing bearing No 6308-02 Nos, replacement of worn out bearing housing, replacement of gland bush, unserviceable nut bolts and washers and bringing back the pump to the pump house and coupling the pump with motor and fixing on foundation and testing, complete all as specified and directed. |
| 39 | Material and labour for repair of centrifugal motor pump set 40 HP (Rewinding job will be measured separately), including removing the motor pump from the foundation, disconnecting from the motor and transporting to the work shop for repair including replacement of worn out impellers-01 set with bronze impellers, replacing bearing No 6312-02 Nos, replacement of worn out bearing housing, replacement of gland bush , unserviceable nut bolts and washers and bringing back the pump to the pump house and coupling the pump with motor and fixing on foundation and testing, complete all as specified and directed. |
| 40 | Material and labour for repair of centrifugal motor pump set 20/ 25 HP (Rewinding job will be measured separately), including removing the motor pump from the foundation, disconnecting from the motor and transporting to the work shop for repair including replacement of worn out impellers-01 set with bronze impellers, replacing bearing No 6307-02 Nos, replacement of worn out bearing housing, replacement of gland bush , unserviceable nut bolts and washers and bringing back the pump to the pump house and coupling the pump with motor and fixing on foundation and testing, complete all as specified and directed. |
| 41 | Material and labour for rewinding of 60HP centrifugal motor by uncoupling the motor from the pump, removing the motor from the foundation and transportation of the motor to the workshop, opening the motor , taking out burnt out winding, preparing the slot for winding and rewinding of motor with super enamelled copper winding wire of appropriate size and gauge as existing to make the same cap of motor, varnishing and heat drying including scrapping of old paint & repainting with one coat of grey tinted synthetic enamel paint after motor is reassembled and testing complete all as specified and directed. |
| 42 | Material and labour for rewinding of 40HP centrifugal motor by uncoupling the motor from the pump, removing the motor from the foundation and transportation of the motor to the workshop, opening the motor , taking out burnt out winding, preparing the slot for winding and rewinding of motor with super enamelled copper winding wire of appropriate size and gauge as existing to make the same cap of motor, varnishing and heat drying including scrapping of old paint & repainting with one coat of grey tinted synthetic enamel paint after motor is reassembled and testing complete all as specified and directed. |
| 43 | Material and labour for rewinding of 20/25HP centrifugal motor by uncoupling the motor from the pump, removing the motor from the foundation and transportation of the motor to the workshop, opening the motor , taking out burnt out winding, preparing the slot for winding and rewinding of motor with super enamelled copper winding wire of appropriate size and gauge as existing to make the same cap of motor, varnishing and heat drying including scrapping of old paint & repainting with one coat of grey tinted synthetic enamel paint after motor is reassembled and testing complete all as specified and directed. |
| 44 | Material and labour for rewinding of 7.5 HP to 10 HP centrifugal motor by uncoupling the motor from the pump, removing the motor from the foundation and transportation of the motor to the workshop, opening the motor , taking out burnt out winding, preparing the slot for winding and rewinding of motor with super enamelled copper winding wire of appropriate size and gauge as existing to make the same cap of motor, varnishing and heat drying including scrapping of old paint & repainting with one coat of grey tinted synthetic enamel paint after motor is reassembled and testing complete all as specified and directed. |
| 45 | Material and labour for taking out the submersible pump set and motor assembly of capacity 5 HP to 25 HP from the borewell, by taking out the column pipes with chain pulley block and tripod stand, complete using skilled and experienced labour and transporting the same to workshop for repair and replacement of worn impellers -01 set , replacement of worn out bushings and bearings and transport back repaired pump set back to site after repair and Lowering the same in the bore well after testing complete all as specified and directed. |
| 46 | Material and labour for rewinding of submersible motor 25 HP by taking out the burnt out winding from the starter with PVC insulated copper winding wire of same gauge and size as per existing, replacement of thrust bearing and bushes and testing complete all as specified and directed. |
| 47 | Material and labour for rewinding of submersible motor 7.5 HP by taking out the burnt out winding from the stator with PVC insulated copper winding wire of same gauge and size as per existing, replacement of thrust bearing and bushes and testing complete all as specified and directed. |
| 48 | M& L for pipe line leakage repairing work of any size or specification after disconnecting the near by joint and replacing the GI fitting, short pieces as required and refixing the same, complete all as specified and directed. Note: required fitting/short pieces will be paid and measured under relevant items as here in after |
| 49 | Supply only GI Union 50 mm dia complete all as specified and directed. |
| 50 | Supply Only GI Union 15 mm dia complete all as specified and directed. |
| 51 | Supply Only GI Union 20 mm dia complete all as specified and directed. |
| 52 | Supply only GI Union 25 mm dia complete all as specified and directed. |
| 53 | Supply only GI Union 40 mm dia complete all as specified and directed. |
| 54 | Supply Only GI Union 80 mm dia complete all as specified and directed. |
| 55 | Supply Only GI Union 100 mm dia complete all as specified and directed. |
| 56 | Supply Only GI socket 15 mm dia complete all as specified and directed. |
| 57 | Supply Only GI socket 20 mm dia complete all as specified and directed. |
| 58 | Supply only GI socket 25 mm dia complete all as specified and directed. |
| 59 | Supply only GI socket 40 mm dia complete all as specified and directed. |
| 60 | Supply Only GI Nipple150mm long, 15 mm dia complete all as specified and directed. |
| 61 | Supply Only GI Nipple150mm long, 20 mm dia complete all as specified and directed. |
| 62 | Supply only GI Nipple150mm long, 25 mm dia complete all as specified and directed. |
| 63 | Supply only GI Nipple150mm long, 40 mm dia complete all as specified and directed. |
| 64 | Supply only GI Tee equal 20mm bore ISI marked complete all as specified and directed. |
| 65 | Supply only GI Tee equal 25mm bore ISI marked complete all as specified and directed. |
| 66 | Supply only GI Tee equal 40mm bore ISI marked complete all as specified and directed. |
| 67 | Supply only GI Tee equal 50mm bore ISI marked complete all as specified and directed. |
| 68 | Supply only GI Elbow 20 mm bore ISI marked complete all as specified and directed. |
| 69 | Supply only GI Elbow 25 mm bore ISI marked complete all as specified and directed. |
| 70 | Supply only GI Elbow 40 mm bore ISI marked complete all as specified and directed. |
| 71 | Supply only GI Elbow 50 mm bore ISI marked complete all as specified and directed. |
| 72 | S&F in replacement gland packing of suitable size for 40/60 HP pump complete all as specified and directed. |
| 73 | S&F in replacement Bearing of suitable size for 40/60 HP pump complete all as specified and directed. |
| 74 | S&F in replacement leather gasket suitable for 80/100 mm dia pipe complete all as specified and directed. |
| 75 | S&F in replacement CI flange for 80/100 mm dia pipe tape all complete all as specified and directed. |
| 76 | S&F in replacement Nut & Bolts 20x50 mm, 20x75mm , 20x100mm complete all as specified and directed. |
| 77 | S&F in replacement Nut & bolts of size 15x50 mm, 15x75mm, 15x100mm complete all as specified and directed. |
| 78 | Supply only Calcium hypochlorite granules (65% to 70%) disinfectant for water treatment, more stable than Chlorine Gas and Stronger than bleaching powder and solidum Hypochlorite) Packing in 45 Kgs in plastic Drums complete all as specified and directed. Please Enable Macros to View BoQ information |