|
| 1 | Clearing Jungle including uprooting rank, vegetation, grass, brush wood, trees and sapling of girth upto to 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m. outside the periphery of the area cleared. |
| 2 | Weed Clearance from Canal |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (A) Dry |
| 4 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (B) Wet |
| 5 | Removal of dead animals and disposal at safe place far from locality as per direction of Engineer in charge |
| 6 | Deployment of JCB machine including POL charges for all sorts of works, not measurable. |
| 7 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kind of Soil |
| 8 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m in all kinds of soil |
| 9 | Supply of labour for all sort of works as per requirement for canal syphons, canal section and drainage structure |
| 10 | Carriage/Disposal of mulba/earth from the peripherry of silt cleared to dumping area lead upto 2.0 kms |
| 11 | Earth work in excavation by manual means including disposal of excavated warth upto 1M |
| 12 | Filling empty cement bags with sand/earth i/c cost of sewing and strings excluding cost of bags and earth/sand. |
| 13 | placing of sand/earth filled bags in dry conditions |
| 14 | Placing of sand/earth filled bag in wet condition/water |
| 15 | Slip clearance from canal inclusive of initial lead and lift of 50M and 1.50M respectively (ordinary soil) |
| 16 | Supply of stones |
| 17 | Providing and laying cement concrete 1:2:4 (1 Cement:2 coarse sand : 4 graded stone agg. 20mm nominal size). excluding the cost of shuttering in foundation plinth |
| 18 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Crushed. |
| 19 | Dumping stone excluding cost of stones in horizontal on level. |
| 20 | Centering and shuttering incl. strutting, propping etc and removal of form work: For a foundations, footings bases of columns etc for mass concrete. |
| 21 | Construction of Muthu Bunds, comprising boulders and wood bushes in alternate layes , including working in water situations. |
| 22 | Carriage of Materials from Source to site of work a) Carriage of Sand and Bajri agg. av. 10 Kms by Mechincal Transport |
| 23 | Carriage of Materials from Source to site of work b) Carriage of Nallah Stone, av. 10 Kms by Mechincal Transport |
| 24 | Pumping water caused by spings tidal or river seepage, broken water main or grains and the like |
| 25 | Painting and Writing of guages on MRC and its disty. |
| 26 | Cost of E.C. Bags |
| 27 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 28 | Provinding and laying of RBM filling including supply and carriage |
| 29 | Tipping stone-filled wire crates in position; including equipment charges. |
| 30 | cost of crate (Size 6mx1.5mx1.5m) |
| 31 | Labour engaged for sweeping of office complex Samba with toilet Please Enable Macros to View BoQ information |