|
| 1 | PART (A)-WORK SPECIFICATION FOR CONSTRUCTION OF NEW 33/11 KV SUBSTATION CHAK BHITHARA,SHAHJAHANPUR(2x5 MVA) |
| 2 | Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site. |
| 3 | 33 KV Lightening Arrestor |
| 4 | 33 KV Line Isolator |
| 5 | 33 KV 400 A Bus Isolator |
| 6 | 33 KV VCB 800A 750 MVA |
| 7 | Control pannel I/C for 33 KV single T/F |
| 8 | Control Panel 33KV for single feeder |
| 9 | 33 kv O/D CT CTR 200/100/1-1-1 A |
| 10 | 33 kv O/D CT CTR 400/200/1-1-1 A |
| 11 | 33 KV PT (outdoor) 33KV/110V |
| 12 | 11 KV VCB I/C CTR 600/300/5A |
| 13 | 11 KV VCB O/G CTR 200/100/5A |
| 14 | 11 KV Bus coupler |
| 15 | 11 KV 3x300 mm2 XLPE Cable |
| 16 | 11 KV 3x185 mm2 XLPE Cable |
| 17 | 11 KV Cable jointing Kit 3x185 mm2 I/D |
| 18 | 11 KV Cable jointing Kit 3x185 mm2 O/D |
| 19 | 11 KV Cable jointing Kit 3x300 mm2 I/D |
| 20 | 11 KV Cable jointing Kit 3x300 mm2 O/D |
| 21 | PCC Pole 8.5m long. |
| 22 | 11 KV Pin Insulator with Pin |
| 23 | 11.4 KV, 63 KVA Transformer |
| 24 | LT PVC Cable 3.5x70/35 Sq.mm |
| 25 | Earthing Complete |
| 26 | Stay set complete 16x1800mm |
| 27 | 11KV Disc Insulator B&S 7000 Kg |
| 28 | 33 KV Disc fitting for Dog conductor |
| 29 | 33 KV Polymeric Pin Insulator |
| 30 | 11 KV disc insulator |
| 31 | 11 KV disc fitting |
| 32 | 10 SWG GI Wire |
| 33 | LT ABC Cable 3x50+1x35+1x16sqmm |
| 34 | ACSR Panther conductor |
| 35 | Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below. |
| 36 | Laying of M.S. Bar of 32mm dia for making the complete earthmat in the trenches in S/s Yard of 750mm depth and 500mm width with their straightening, cutting accordingly and welding with overlap joint of 100mm cross joint, T joint. |
| 37 | Making and driving of 3 Mtr. Long electrodes from 32mm dia M.S. Bar having one end conical 150mm long by heat tempering including cutting upto 750mm depth from ground level and welding with earth mat. |
| 38 | Making of triangular bridge by using M.S. electrodes and M.S. Strip 50x6mm with providing of well type pipe earthing upto 15 Mtr. Depth below G/L including welding etc. by boaring process at LA and two side of 11 KV S/G including cost of GI Pipe of size 40mm dia 15 Mtr Long of ISI mark. |
| 39 | welding & laying of G.S. strip 50x6mm size with structures and all equipments in switchyard and control room, M.S. Bar including cutting, binding and proper fixing etc. complete. The welding and laying of G.S. Strips to L.A. with full length of structures and also the M.S. bridge near L.A. structures. |
| 40 | Supply of following materials for construction of power tf plinth |
| 41 | Supply of 90 LBS Rail pieces for T/F (44.64 KG. PER MTR.) |
| 42 | Supply of bricks as per standard |
| 43 | Supply of cement as per standard |
| 44 | Supply of sand as per standard |
| 45 | Supply of stone ballast 20mm as per standard |
| 46 | Supply of steel rebar 12mm as per standard |
| 47 | Supply of brick bat as per standard |
| 48 | Construction of new transformer plinth of size 4.5x3.5 Mtr. for upto 10 MVA Transfomer having depth 0.5 Mtr. below ground level & 0.5 Mtr. above ground level. The work including excavation of foundation. base & concreting of foundation base of CC 1:6:12 ratio (cement, fine sand & brick ballast) first class brick work of cement morter of ratio 1:4 for masonry & lintring work of transformer plinth of RCC work of ratio 1:2:4 (cement, coarse sand and store grit of 20mm using MS Bars of 10mm dia(tor) for reinforcement of linter including cutting, bending & binding of MS bars of required plinth size & shape. The work also includes laying of 2 Nos. 3.5 Mts. long rail pieces after cutting in proper size & shape & fitting etc. The plinth will be made as per RESSPO/Approved drawing suitable for 10 MVA transformer & shall be plastered of walls of ratio 1:4 (cement & fine sand)/finished on top and sides of the plinth. ( Only erection ) |
| 49 | Fabrication, erection and grouting of the following structures as per RESSPO/ Approved Drawing and its, plinth 30cm above ground level as directed by the Engineer Incharge, Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate with material including all accessories (all decentralised material provided by firm ) |
| 50 | Terminal gantry(1.5x0.6x2)cum |
| 51 | Bus Bar Gentry (0.75x0.75x1.5)cum |
| 52 | Line Isolator Structure(0.3x0.9x1)cum |
| 53 | Bus Isolator Structure(0.3x0.9x1)cum |
| 54 | Post insulator Structure (0.3x0.3x1)cum |
| 55 | 33 KV VCB Structure(1.5x1.5x1)cum |
| 56 | 33 KV CT Structure(0.3x0.3x1)cum |
| 57 | 33 KV PT Structure(0.3x0.3x1)cum |
| 58 | Fuse Set Structure(0.3x0.3x1)cum |
| 59 | Lightening Arrestor Structure(0.3x0.3x1)cum |
| 60 | Mounting and installation, including Mechnical & electrical fixing and adjusting of the following equipments on their respective structures including proper adjustment: |
| 61 | 33 KV Isolator line side |
| 62 | 33 KV Bus Isolator |
| 63 | 33 KV Fuse Set (Provided by firm) |
| 64 | Lightening Arrestor |
| 65 | 33 KV VCB |
| 66 | 33 KV CT |
| 67 | 33 KV PT |
| 68 | 33 KV Post insulator |
| 69 | 24 V Battery set with charger (To be provided by firm I.S.I. mark only of DC System with one float cum boost charger & battery set for 24V. System with 150A.H. Capacity with cabinet). |
| 70 | Complete laying and termination of copper control cable in PVC Pipe 4\\" dia from 5 MVA power T/F and 33 KV VCB in the out door switch yard in the Transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings. |
| 71 | Control Cable 4x2.5 mm2 |
| 72 | Control Cable 2x2.5 mm2 |
| 73 | Stringing of 33 KV Bus bar with ACSR Panther conductor including fixing of Disc insulator, strings and tension fitting complete with sagging of bus bar etc and making vertical/Horizontal jumper connections through PG clamps and connecting all the equipments with each others through connecting clamps, work includes all the jumpering from terminal gantry to bus bar and from bus bar to transformer (2 No. T/F Bay's). (All type of insulator, fitting, PG clamp etc. provided by Firm). |
| 74 | Making of M.S. Angle Ladder type frame of Angle (75x75x6mm) & M.S. Strip (50x6mm) near power transformer for power cable with concreting in 1:4:8 ratio of cement, sand & coarse aggregate and proper clamping (50x6mm) of the same with transformer cable (All grouting material will be provided by The firm). |
| 75 | Making of M.S. Angle frame of (75x75x6mm) in the shape of \\"L\\" to connect T/F Neutral by copper flexible strip with proper clamping including cost of copper strip. Earthing of Power T/F Neutral shall be done separately including welding with M.S. bar Electrode bridge 1 No. after making in triangular shape and proper connection with well type earthing etc. Grouting of structure will be done in 1:4:8 ratio of cement, sand & coarse aggregate (All grouting material will be provided by The firm). |
| 76 | Laying of 11KV cable of different size from power T/F to control room I/C and control room to D/P outside Sub-Station over a pad of river sand . Cable shall be laid 500mm below the ground in the yard by covering three sides with Ist Class brick and Ganga sand (All type laying material will be provided by the Firm except 11 KV cables ). |
| 77 | 11 KV Cable hoisting with GI Pipe 6\\" dia |
| 78 | Erection and grouting of double pole structure of PCC Poles for Sub-Station T/F including mounting of 63/100KVA, 11/0.4 KV T/F and providing 11 KV T.P.M.O. with Fuse set and jumpers etc. complete in all respect as per RESSPO drawing alongwith grouting material (All GI pipe ,fuse set & grouting material provided by the Firm ). |
| 79 | Erection and grouting of double pole structure of PCC Poles including stays for 11KV out door feeders, complete in all respect as per RESSPO drawing along with grouting material about 3 meter 6\\" dia G.I. pipe along with required elbow shall be provided at D/P for power cable including provision of 08 Nos. feeders name plate on D/P. (All type of clamps, GI pipe & grouting material provided by the Firm). |
| 80 | Erection of 11 KV incoming, outgoing and bus coupler panels (with testing & setting of relays) in substation control room including grouting of Anchor bolts of panel and making of pocket for power cable to insert in panel from trench and complete filling of control room's tranches by river sand. |
| 81 | Erection & testing of single T/F Control panel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand. |
| 82 | Erection & testing of 1 No. 33 KV feeder control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand. |
| 83 | Termination of 11 KV Different size XLPE cable by filling 11 KV heat shrinkable type cable boxes including proper connection with LV side of T/F switch gear panels and double poles by providing suitable connectors. |
| 84 | Shifting and dragging of 33/11 KV 5 MVA transformer from road side to its plinth alongwith its erection including fixing of all assessories and top-up of T/F oil. |
| 85 | Work related maintinance of old and used 5 MVA Transformer. |
| 86 | Attending of leakage of power transformer (Replacement of damage gasket kit etc)(all required material will be provided by firm.) |
| 87 | Centrifusing of transformer oil. |
| 88 | Replacement of damage brether and silica jel.(all required material will be provided by firm.) |
| 89 | Replacement of damage WTI and OTI.(all required material will be provided by firm.) |
| 90 | Painting of old transformer.(all required material will be provided by firm.) |
| 91 | Replacement of damage buchholz relay(all required material will be provided by firm.) |
| 92 | Replacement of damaged 33kv, 11kv bushings (all required material will be provided by firm.) |
| 93 | Carriage and top up of transformer oil from any store/workshop of Bareilly Zone 1, Bareilly Zone 2 |
| 94 | Providing and fixing of Distribution Board (600x450x6mm on bakelite sheet) on wall on ms angle frame with 4x16mm2 L.T. cable 50 meter long and other accessories such as 3 Nos 32A 3 Poles switch, 3 Nos bulbs, 3 Nos fuse cut out 32A and etc complete in all respect (All type material provided by the Firm). |
| 95 | Lightning Arrengment for switchyard :- |
| 96 | Erection and grouting of 8.5 Mtr long, 10 Nos. PCC Poles (Single support) with digging of pits. Fixing of all accessories alongwith clamps, street light fittings, concreting work in 1:4:8 with material including all accessories, 06 Nos. ISI Mark . This will also include work of erection and grouting of 4 Nos. stays with stay with stay wire to be given by cotractor (All type of insulators, clamps & grouting material provided by the Firm except PCC pole). |
| 97 | Providing and fitting of 150 W LED flood light fiting with lamp of latest design complete with De-fuser suitable for outdoor installation with IP65 enclosure (Power supply single phase 230 Volt 50 Hz) with clamps, Bend pipe, LT cable, junction box etc. |
| 98 | Stringing of LT ABC Cable 3x50+1x35+1x16sqmm with its proper clamping, sagging and making section points etc. complete in all respect. |
| 99 | Painting of the fabicated structures with one coat of red oxide primer and two coats of synthetic enamel alumm. Paint/green paint of ISI Mark alongwith earthing strip above ground level. |
| 100 | Construction of Toe wall around the outdoor Switchyard of the S/S of size 0.75 Mtr At base and 0.23 Mtr. At top as per RESSPO Norms by Ist class bricks in the ration 1:6 Base concreting of the wall to be done in ratio 1:6:12 and plaster 12mm thick in ratio 1:4. |
| 101 | Fabrication of switchyard fencing with wire mesh 8/10 SWG as per drawing along with Fabrication of one number gate made of MS Angle, MS channel, MS Flat, together with locking arrangement, its installation including the cost of civil material, angle 50x50x6mm, 75x75x6mm etc. |
| 102 | Making of cable trench of size 750 mm deep and 750 mm wide and 9 inch wall by Ist class bricks in the ratio 1:6 Base concreting of the wall to be done in ratio 1:6:12 and plaster 12mm thick in ratio 1:4. with trench cover for laying of control cables and 11 KV cables in ssitchyard as per RESSPO. All material will be supllied by the firm. |
| 103 | Providing of Fire Fighting equipments including 02 Nos. 4.5 Kg. Co2 Fire Extinguisher potable type and 02 Nos. Foam type Fire Extinguisher potable type |
| 104 | Providing of following material of good quality as per specification :- |
| 105 | Rubber matting sheet 8/10mm |
| 106 | Meggar |
| 107 | Steel Table, Office type with drawer |
| 108 | Steel Office chair with arms |
| 109 | Steel Office chair without arms |
| 110 | PART (B)-WORK SPECIFICATION FOR CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION Bartara(Chak Bhitara), Shahjahanpur |
| 111 | Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site. |
| 112 | 33 KV 3X300mm2 XLPE Cable |
| 113 | 33 KV 3X300mm2 XLPE Cable jointing kit O/D |
| 114 | ACSR Dog Conductor |
| 115 | STP 13M |
| 116 | 9.0 M long PCC pole |
| 117 | 33 KV V type cross arm 100x50x6mm M.S. Channel (7.9mtr/ kg) |
| 118 | 33 KV pin insulator Polymer |
| 119 | 33 KV pin with nut |
| 120 | 11 KV Disc Insulator B &S. Type 7000 Kg |
| 121 | Disc Fittings Dog/Racoon 7000 Kg |
| 122 | LT XPLE cable Al 1x400 sq mm |
| 123 | Complete Stay (GI stay rod 20x1800mm, stay wire 7/8 SWG 10 kg, stay clamp, bolt, nut & washer with concerte grouting) |
| 124 | Earthing of pole by MS earthing rod of 20x2500mm. And 6 SWG earthing wire etc. |
| 125 | G.I wire 8 Swg |
| 126 | Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor. |
| 127 | Single Pole structure on PCC 9.0 Mtr for single ckt 33KV line. |
| 128 | Single Pole structure on ST POLE 13M Mtr for single ckt 33KV line. |
| 129 | Double pole for cable riser on 09 mtr PCC |
| 130 | Double Pole structure on PCC 9.0 Mtr for single ckt 33KV line. |
| 131 | End double pole for cable riser on 09 mtr PCC Pole |
| 132 | Four Pole structure on PCC Pole 9M long complete with bracing. |
| 133 | Erection/fixing for stay set with stay wire and clamp as per RESSPO drawing including binding, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and brick ballast and sand before back filling of the pits as per RESSPO schedule all clamps, nuts & bolts, cement, brick, concrete etc would be provided by contractor. |
| 134 | Concreting of supports in 1:4:8 ratio and plinthing of supports upto 300mm above ground level by using cement ,brick ballast and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor. |
| 135 | Laying and sagging of 3 phase ACSR Dog conductor from 33/11 kv s/s badagaon khas to the gentry at 132KV substation Bisalpur including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect. |
| 136 | Earthing of each S.T/PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor. |
| 137 | Fabrication and fixing of guarding angle on Single/double poles, Stringing and sagging of three nos. Earth/GI wire with cardle guarding of above 33 KV line as per RESSPO Norms including provision of all necessary clamps and hooks. Shifting of existing line conductor of 11 KV/LT line to maintain proper clearance in between both lines (all required material will be provided by the contractor except guarding angle and earth/GI wire). |
| 138 | Painting of following supports with one coat of red oxide primer and two coats of aluminum white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete the job. |
| 139 | Single Pole of S.T Pole 13 mtr |
| 140 | Fixing of danger board, number plate and G.I barbed wire on each location including proper clamping and providing anti climbing device by using including supply of the above items. |
| 141 | Laying of single circuit 33 KV 3X300 Sq. mm XLPE cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. Inter axial spacing between the two cable should be in between 0.25 m to 0.40m. (All the material required for laying will be supplied by the contractor except 33 KV XLPE cable) |
| 142 | Cable laying by drill method in single circuit ( All the material required for laying will be supplied by the contractor except 33 KV XLPE cable) |
| 143 | Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI pipe of size 6\\" dia 3 M long including its jumpering complete with clamps, nuts and bolts. |
| 144 | Fixing of 33 KV O/D or S/ Th. |
| 145 | Fixing of cable route marker |
| 146 | Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of Incharge. |
| 147 | PART (C)-WORK SPECIFICATION CONSTRUCTION OF NEW 11 KV LINE FOR 33/11 KV SUBSTATION Bartara(Chak Bhitara), Shahjahanpur |
| 148 | Loading, unloading and safe carriage of the following materials from any Store Centre of Electricity store division bareilly to the site of work including measuring, weighing, loading, unloading at both ends and proper stacking at safe site. |
| 149 | STP 11 Mtr. long |
| 150 | PCC Pole 8.5Mtr. Long |
| 151 | M.S angle lron 65x65x6mm |
| 152 | Top channel 125x65x6mm 3200mm |
| 153 | T- Off Channel 125x65x1300mm |
| 154 | Gaurding angle 65x65x1600 |
| 155 | 11 KV disc insulator |
| 156 | 11 KV disc fitting |
| 157 | 11 KV Pin insulator |
| 158 | ACSR Rabbit conductor |
| 159 | 11 KV 3X185mm2 XLPE Cable |
| 160 | 11 KV 3X185mm2 XLPE Cable jointing kit O/D |
| 161 | 11 KV 3X185mm2 XLPE Cable jointing kit S/through |
| 162 | LT XPLE cable Al 1x400 sq mm |
| 163 | G.I wire 8 Swg |
| 164 | Stay set complete |
| 165 | Earthing complete |
| 166 | Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor. |
| 167 | Single pole STP |
| 168 | Single Pole PCC |
| 169 | Sectional double pole structure with 8.5 Mt. long on PCC |
| 170 | Cable exposer double pole on PCC pole 8.5 Mtr. Long. |
| 171 | End Type double pole structure on PCC Pole 8.5 Metre for 11KV line |
| 172 | Erection/fixing for stay set with stay wire and clamp as per RESSPO drawing including binding, clamping, tightening, and nozzeling etc. complete in all respect including its grouting in ratio 1:4:8 of cement, sand and brick ballast and sand before back filling of the pits as per RESSPO schedule all clamps, nuts & bolts, cement, brick, concrete etc would be provided by contractor. |
| 173 | Concreting of supports in 1:4:8 ratio and plinthing of supports upto 300mm above ground level by using cement ,brick ballast and sand in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing.All matrial would be provided by the contractor. |
| 174 | Laying and sagging of 3 phase ACSR Rabbit conductor including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc. in all respect. |
| 175 | Earthing of each S.T/PCC Poles of the line is to be done by inserting the MS earth rod (1800x16mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor. |
| 176 | Painting of following supports with one coat of red oxide primer and two coats of aluminum white paint of ISI mark and top danger portion of each support must be painted by providing two coat of Post Office Red Paint (1.5mtr upper portion of support.) Paint and material would be given by contractor to complete the job. |
| 177 | Single pole STP |
| 178 | Fixing of danger board on each location and G.I barbed wire including proper clamping and providing anti climbing device by using including supply of the above items. |
| 179 | Laying of single circuit 11 KV 3X185 Sq. mm XLPE cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. Inter axial spacing between the two cable should be in between 0.25 m to 0.40m. (All the material required for laying will be supplied by the contractor except 33 KV XLPE cable) |
| 180 | Cable laying by drill method in single circuit All the material required for laying will be supplied by the contractor except 11 KV XLPE cable) |
| 181 | Single CKT cable laying by drill method in HDPE Pipe including cost of material (All the material required for laying will be supplied by the contractor except 11 KV XLPE cable) |
| 182 | Hoisting of 11 KV 3X185 Sq. mm. XLPE cable on double pole with GI pipe of size 6\\" dia 3 M long including its jumpering complete with clamps, nuts and bolts. |
| 183 | Fixing of 11 KV O/D or I/D/ S/ THROUGH |
| 184 | Fixing of cable route marker |
| 185 | Clearing of the line route by cutting of tree branches during erection of line and also upto the time of energisation completely as per direction of Incharge. Please Enable Macros to View BoQ information |