| 1 | Ground Water Level Monitoring through Battery Opererated Digital Water Level Recorder capable for compliance of the latest guidelines of the Central Ground Water Authority (CGWA), Government of India, with Non Rechargeble Battery (2 Year Battery Back up) , Telemetry System, 4 core dia 7.6 mm shielded cable with vent hose cable length is 60 meter (excluding thread) for first instrument, 150 meter (excluding thread) for second instrument, Annual Calibration, Sim Card with Recharge for 02 years, Online Data Management Service ( Secure storage, Cloud Service, dashboard access, analytics. ), With On-site/off-site repair of DWLR to ensure smooth operation, Replacement with the same instrument incase of Offsite repair of defunct instrument for continuous ground water level monitoring. The same shall be handed over to WCL in proper working condition at the completion of contract. In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the contractor shall have to replace that particular DWLR with similar DWLR at his own cost & during the period non operation of DWLR, contractor shall have to upload the ground water level data of that DWLR exclusively on the server for that duration. Any penalty / environment compensation imposed by CGWA due to non functioning of the DWLR instrument / Telemetry system or non-availability of the data on the cloud portal shall be borne by the bidder. Such penalties will be recovered from the Bills of the bidder. the data of Ground Water Level shall be recorded & submitted to Work incharge as per his instructions. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) | Ground Water Level Monitoring through Battery Opererated Digital Water Level Recorder capable for compliance of the latest guidelines of the Central Ground Water Authority (CGWA), Government of India, with Non Rechargeble Battery (2 Year Battery Back up) , Telemetry System, 4 core dia 7.6 mm shielded cable with vent hose cable length is 60 meter (excluding thread) for first instrument, 150 meter (excluding thread) for second instrument, Annual Calibration, Sim Card with Recharge for 02 years, Online Data Management Service ( Secure storage, Cloud Service, dashboard access, analytics. ), With On-site/off-site repair of DWLR to ensure smooth operation, Replacement with the same instrument incase of Offsite repair of defunct instrument for continuous ground water level monitoring. The same shall be handed over to WCL in proper working condition at the completion of contract. In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the contractor shall have to replace that particular DWLR with similar DWLR at his own cost & during the period non operation of DWLR, contractor shall have to upload the ground water level data of that DWLR exclusively on the server for that duration. Any penalty / environment compensation imposed by CGWA due to non functioning of the DWLR instrument / Telemetry system or non-availability of the data on the cloud portal shall be borne by the bidder. Such penalties will be recovered from the Bills of the bidder. the data of Ground Water Level shall be recorded & submitted to Work incharge as per his instructions. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) |
| 2 | Water Level Sounder / Indicator for measurement of Ground Water Level , Capable of Measurement of Ground Water Level upto 200 meter. Standard Cable Length 200 m (excluding threads) , Insulation Material: Polyethylene, Features required: Shock Proof, Reel Type Spool, Seamless Finish, Accurate Result ,Optimum Performance ,Longlasting Durability ,Reliable , Light Weight, Portable , Battery Powered System with probe and drum mounted cables , Brass electrode is replaceable, Shall be in a proper working condition for the entire period of contract. The same shall be handed over to WCL in proper working condition at the completion of contract. In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. i. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the bidder shall have to replace that particular instruments with another one at his own cost & during the period non operation of instruments. Manual Measurement of Ground Water Level data through this instrument is to be carried out in every shift by the successful bidder & the data shall be recorded in the register & submitted to Work incharge as per his instructions. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) | Water Level Sounder / Indicator for measurement of Ground Water Level , Capable of Measurement of Ground Water Level upto 200 meter. Standard Cable Length 200 m (excluding threads) , Insulation Material: Polyethylene, Features required: Shock Proof, Reel Type Spool, Seamless Finish, Accurate Result ,Optimum Performance ,Longlasting Durability ,Reliable , Light Weight, Portable , Battery Powered System with probe and drum mounted cables , Brass electrode is replaceable, Shall be in a proper working condition for the entire period of contract. The same shall be handed over to WCL in proper working condition at the completion of contract. In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. i. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the bidder shall have to replace that particular instruments with another one at his own cost & during the period non operation of instruments. Manual Measurement of Ground Water Level data through this instrument is to be carried out in every shift by the successful bidder & the data shall be recorded in the register & submitted to Work incharge as per his instructions. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) |
| 3 | Protection, Operation, Maintenance, Monitoring & allied services Charges: The contractor shall be responsible for smooth uninterupted operation, maintanance and protection of all the installations and instruments covered under this tender for entire duration of contract. In addition to that, In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the contractor shall have to replace that particular DWLR or Water Level Sounder with similar DWLR / Water Level Sounder at his own cost & during the period non operation of DWLR, contractor shall have to upload the ground water level data of that DWLR exclusively on the server for that duration. Protection, Operation, Maintenance, Monitoring & allied services charges will be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server. k. Protection, Operation, Maintenance, Monitoring & allied services charges will be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server. Provided that, For any defunct machine, grace period of 30 days will be provided to contractor for repairing / replacement of that defunct machine. This grace period will be counted from date of non updation / erroneous (incorrect) updation of ground water level data on online cloud server. After completion of above grace period of 30 days. The Protection, Operation, Maintenance, Monitoring & allied services charges will only be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server for all the DWLRs covered under this tender. Any penalty / environment compensation imposed by CGWA due to non functioning / non availability of the DWLR instrument / Telemetry system or non-availability of the data on the cloud portal shall be borne by the bidder. Such penalties will be recovered from the Bills of the bidder. Billing & Payment of Protection, Operation, Maintenance, Monitoring & allied services charges in lieu of invoice & duly certified LPC shall be made by Civil In-charge of concerned units on a Quarterly Basis on submission of bill along with Desired documents (i.e. the duly uploaded ground water level monitoring data on online cloud/portal as per CGWA requirement and routine site visit report & and additional emergency / breakdown visit reports, if any) by the successful bidder. The data of Ground Water Level shall be recorded through DWLRs & Water Level sounder & the monitoring reports & Geotagged Photos of Graound Water Level Monitoring through DWLRs & Ground Water Level Sounder shall be submitted to Work incharge as per his instructions. The contractor shall be responsible for Installation & Commissioning of Battery operated DWLRs along with all ancillary items and accessories. The contractor shall be responsible for Hassle free operation & Maintanence of Dedicated Online Web Server and continuous availability of ground water level data on the server throughout the period of contract. The contractor shall be responsible for smooth operation, maintenance, Repairing, Annual Calibration, Routine Maintenance Visits & Breakdown Visits of Service Engineer, Telemetry services(including providing sim card & recharge), Online Data Management Services, Battery services, faulty spare part / instrument replacement services, etc related to the DWLRs for entire period of contract at his own cost & without charging any amout to WCL. The contractor shall deploy 03 unskilled workers per day for all the 03 shits for the above purpose. The contractor shall be responsible to provide all safety instruments to workers as per rules at his own cost. There are mud conditions prevails at the Piezometer site during monsoon season, accordingly contractor has to provide gum boots & other facellities like torch lights, etc to ensure continuous Protection, Operation, Maintenance, Monitoring & alliedservice. As the above work is to be carried out in mine premises. The contractor has to provide training to his employees under VT rule at his own cost. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) | Protection, Operation, Maintenance, Monitoring & allied services Charges: The contractor shall be responsible for smooth uninterupted operation, maintanance and protection of all the installations and instruments covered under this tender for entire duration of contract. In addition to that, In case of theft or damages (of any or all the tendered instruments) arising from manual mishandling, water exposure, fire, or blasting, etc the successful bidder shall be responsible for replacement of the subject instruments with the same instruments within 15 days from the date of such incident. In case, if repair takes more than 120 Hrs (72 Hrs + 48 Hrs), the contractor shall have to replace that particular DWLR or Water Level Sounder with similar DWLR / Water Level Sounder at his own cost & during the period non operation of DWLR, contractor shall have to upload the ground water level data of that DWLR exclusively on the server for that duration. Protection, Operation, Maintenance, Monitoring & allied services charges will be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server. k. Protection, Operation, Maintenance, Monitoring & allied services charges will be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server. Provided that, For any defunct machine, grace period of 30 days will be provided to contractor for repairing / replacement of that defunct machine. This grace period will be counted from date of non updation / erroneous (incorrect) updation of ground water level data on online cloud server. After completion of above grace period of 30 days. The Protection, Operation, Maintenance, Monitoring & allied services charges will only be paid as per the availability of data on the server at a rate of daily Protection, Operation, Maintenance, Monitoring & allied services charges per day x nos. of days for which data is available on the server for all the DWLRs covered under this tender. Any penalty / environment compensation imposed by CGWA due to non functioning / non availability of the DWLR instrument / Telemetry system or non-availability of the data on the cloud portal shall be borne by the bidder. Such penalties will be recovered from the Bills of the bidder. Billing & Payment of Protection, Operation, Maintenance, Monitoring & allied services charges in lieu of invoice & duly certified LPC shall be made by Civil In-charge of concerned units on a Quarterly Basis on submission of bill along with Desired documents (i.e. the duly uploaded ground water level monitoring data on online cloud/portal as per CGWA requirement and routine site visit report & and additional emergency / breakdown visit reports, if any) by the successful bidder. The data of Ground Water Level shall be recorded through DWLRs & Water Level sounder & the monitoring reports & Geotagged Photos of Graound Water Level Monitoring through DWLRs & Ground Water Level Sounder shall be submitted to Work incharge as per his instructions. The contractor shall be responsible for Installation & Commissioning of Battery operated DWLRs along with all ancillary items and accessories. The contractor shall be responsible for Hassle free operation & Maintanence of Dedicated Online Web Server and continuous availability of ground water level data on the server throughout the period of contract. The contractor shall be responsible for smooth operation, maintenance, Repairing, Annual Calibration, Routine Maintenance Visits & Breakdown Visits of Service Engineer, Telemetry services(including providing sim card & recharge), Online Data Management Services, Battery services, faulty spare part / instrument replacement services, etc related to the DWLRs for entire period of contract at his own cost & without charging any amout to WCL. The contractor shall deploy 03 unskilled workers per day for all the 03 shits for the above purpose. The contractor shall be responsible to provide all safety instruments to workers as per rules at his own cost. There are mud conditions prevails at the Piezometer site during monsoon season, accordingly contractor has to provide gum boots & other facellities like torch lights, etc to ensure continuous Protection, Operation, Maintenance, Monitoring & alliedservice. As the above work is to be carried out in mine premises. The contractor has to provide training to his employees under VT rule at his own cost. (Detailed specifications , Terms & conditions enclosed as Annexure of a general Terms & conditions of NIT) |