| 1 | Part A:- Water misting system for Road -Street Light Poles |
| 2 | Providing and laying of stainless steel (SS) pipe of size 15mm dia of make JSW/Tata steel or equivelent as approved by Engineer in charge of grade 304 with minimum thickness of 2.11mm for resisting high pressure up to 80 bar. including all special fittings and suitable accessories (wherever required etc.) for connection between steel pipe and nylon pipe, cutting, welding, testing & commissioning etc. as required. with trenching, refilling and testing of joints complete as per direction of the engineer in charge. |
| 3 | Providing and laying of stainless steel (SS) pipe of size 25mm dia of make JSW/Tata steel or equivelent as approved by Engineer in charge of grade 304 with minimum thickness of 3.38 mm for resisting high pressure up to 80 bar. including all special fittings and suitable accessories (wherever required etc.) for connection between steel pipe and nylon pipe, cutting, welding, testing & commissioning etc. as required. with trenching, refilling and testing of joints complete as per direction of the engineer in charge. |
| 4 | Providing & fixing of 9 mm high-pressure nylon pipe suitable for resisting pressure 80 bar, making it ideal for use in misting systems, industrial automation, and other high-pressure environments. Constructed from durable, lightweight nylon, this pipe offers excellent flexibility, resistance to abrasion, and chemical stability, ensuring long-lasting performance under demanding conditions. Its smooth inner surface minimizes friction losses, promoting efficient fluid flow, while its tough outerlayer with stands environmenta lfactors like UV exposure and impact, Including supplying and fixing of all other suitable accessories (extension, tee & nippleetc. ) for interconnection between nylon pipe misting nozzle, testing & commissioning etc. as required. |
| 5 | Providing & fixing of suitable size stainless steel (SS) bracket (bracketis suitable for fixing of 3/6 nos. stainless steel nozzle holder) on exiting pole upto suitable height with themse based objects with flower bulbs, emmiting mist spray (as per direction Engineer -in charge) Including supplying and fixing of all other suitable size accessories like clamp, stainless steel nozzle holder( for fixing 5 Nos. misting nozzle at each holder), extension & tee etc.testing & commissioning etc. complete as required. |
| 6 | Providing and fixing of Misting Nozzle on existing bracket, capable for throw the water jet up to one meter radius with a discharge rate 2.8 LPH at operating pressure 50 bar, featuring a precision-drilled orifice, integrated filter, and corrosion-resistant finish , Including supplying and fixingof all suitable accessories (extension, tee & nipple etc.) for connection between misting nozzle on bracket , testing & commissioning etc. as required. |
| 7 | Providing, fixing,testing and commissioning of stainless steel Ball Valve of size 15 mm dia Including all suitable accessories required for fixing the valve. |
| 8 | Providing, fixing,testing and commissioning of stainless steel Ball Valve of size 25 mm dia Including all suitable accessories required for fixing the valve. |
| 9 | Supplying ,installation ,testing and commissioning of three phase high- pressure piston pump set (pump and motor) shall have a minimum flow rate of 80 liters per minute (LPM) and be capable of delivering a pressure range between 80 to100 bar.The pump shall have a minimum horse power of 20 HP and operate on a 415V, three-phase power supply. The rotational speed (RPM) of the pump shall be approximately 1450 RPM. It shall be equipped with a heavy-duty direct coupling for optimal performance and durability in continuous operations.The pump housing and all wetted parts must be made of corrosion-resistant materials suitable for high-pressure applications, ensuring long-term reliability and efficiency. Additionally, the pump shall have built-in thermal protection and vibration dampening to minimize wear and ensure safe operation in demanding, including supplying and fixing of all other accessories like NRV and header fittings, suitable size electric cable & wire , suitable size base frame, etc.complete as required etc., connection, Borewell, testing & commissioning etc.completeas required. The rates must include one standby pump without motor as spares.Two sets of pump in combination of 1W+1S mode for each 1 km length. |
| 10 | Fabricating, Supplying,of IP54 floor mounted cubical panel baord minimum 400mm deep made out of 2mm thick CRCA Sheet. (post 9-tank treatment) in approved color mounting on angle iron frame work of size 50mm x 50mm x 6mm thick dust and vermin proof, duly compact with suitable i/c 4 strip aluminium busbar capacity of suitable bus bar size as per incomer duly power coated paint of approved colour and shade providing earth stud at both end, louvers and mesh on both side of panel board for ventilation purpose i/c connection and interconnection, earthing complete etc as reqd. (Drawing of panel shall be got approved from the Deptt. before fabricating after award of work). Incommer- (i) 250A 36KA MCCB ics=100%icu-1 No. (ii) indicating lamp R,Y,B (iii) 3 line multifuntion meter class 1.0 with CT having A,V,f,kwh,pf kva OUTGOING (i) electrical compartment housing 7.5hp starter, with protection against low/high voltage, overcurrent, and dry run, including terminal blocks for remote signal integration (potential-free contacts)-4 set(ii)Front panel with phase indicator lights, motor ON/OFF/TRIP lights,Phase indication lights, Start/Stop push buttons, and an Auto/Manual switch for control mode selection.Emergency stop must be activated before opening. Door switch to operate internal 10W tubelight for visibility during maintenance. All components from CPRI certified products Manufactuers, suitable for field integration and SCADA-ready. (iii) 100A 25KA FP MCCB 1CS=100%ICU- 1 NO. (iv) 63A 25ka FP ics=100%icu- 1 no. (v) 6-32aA C curcve DP MCB-1 NOS. |
| 11 | Providing fixing testing & commissioning of Pump Starter Relay of suitable range for pump set of minimum capacity 20 HP Including supplying and fixing of all suitable accessories like cable ,wire & thimble etc., making connection complete in all respest as per direction and satisfaction of Engineer in charge. |
| 12 | Supplying ,installation ,testing and commissioning of Reverse Osmosis (RO) system shall have a capacity of 2000 liters per hour (LPH) (and output water TDS upto 50 PPM) and be equipped with all necessary components, including high-pressure pumps, membranes, filters, and associated piping for efficient operation. The system will include a high- pressure pump capable of delivering the required pressure for optimal membrane performance, typically around 10-15 bar, with corrosion- resistant materials to handle water conditions. The RO membranes shall be of high quality, TFC (Thin Film Composite) type, with a recovery rate of up to 75%, designed to remove dissolved solids, contaminants, and impurities, ensuringhigh-qualitypermeate water. Thesystem willfeaturea pre-treatment stage withmulti-media and activated carbon filter storemove sediment, chlorine, and organic matter, ensuring the longevity of the membranes. It shall also include an anti-scalant dosing system to prevent membrane fouling. Post-treatment options, such as UV sterilization or ozonation, may be provided for disinfection purposes. The system shall be fully automated with a control panel for real-time monitoring, pressure gauges, flow meters, and safety features like low-pressure and high- pressure switches, ensuring smooth operation and protection of the components. The frame should be made from stainless steel for durability and corrosion resistance, and the entire system must be easy to maintain, energy-efficient, and compliant with international water treatment standards. Including supplying and fixing of all suitable accessories for installation etc. as required. |
| 13 | Prefabricated Room (12 ft x 10 ft x 10 ft) with 40 mm PUF PanelsSupply and installation of a 12 ft × 10 ft × 10 ft prefabricated room using 40 mm thick PUF panels (48 kg/m³ density) with PPGI sheet on both sides. Panels shall be interlocked, insulated, and weatherproof, suitable for housing a 2000 LPH RO plant, pumps, and control panels.Room shall include a metal base frame, chequered floor plate, lockable door, ventilation fan or louver, LED light, and cable entry with gland. Structure must be modular, corrosion-resistant, and suitable for outdoor use. |
| 14 | Construction of Raised Plinth for Prefab Room and Water TanksConstruction of a plinth raised 750 mm above ground level for safe placement of the prefabricated room and water tanks, ensuring protection from waterlogging during monsoon or rain. The plinth shall be built over well-compacted soil, topped with a 150 mm thick PCC slab (1:4:8 mix), reinforced as required. The platform shall be enclosed with brick masonry walls on all sides for edge protection and structural support.The plinth shall be integrated with a drainage system to channel overflow, rainwater, or accidental spillage from tanks or equipment to a designated discharge point, preventing water accumulation and avoiding inconvenience to the public. All works shall be finished with a slope towards the drain and constructed as per standard civil engineering practices includes backfilling, bricak walls and PCC floor with 6 inch depth |
| 15 | HDPE Water Storage Tank – 5 Layer(suitbale for storage of water for running of system 6 Hours )Supply and installation of HDPE water tank with 5-layer construction (UV layer, structural, insulating, anti-microbial, inner hygienic layer). Tank shall be UV-stabilized, food-grade, non-toxic, and suitable for outdoor use.Includes inlet, outlet, overflow, air vent, and manhole. Tank must support 10,000-liter capacity (or as required), withstand pressure, and resist algae growth. Mounted on concrete or steel base with HDPE/SS fittings and isolation valves. ISI-certified or equivalent. |
| 16 | HDPE Piping for Water TransferSupply and installation of UV-resistant, fire-retardant HDPE pipes (65 mm and 40 mm OD) for connecting: Raw water inlet to tank, Tank to RO input, RO output to storage tanks, RO reject to waste tank, Includes all valves, sockets, connectors, reducers, and couplers. Pipes must be pressure-rated, with proper supports and joints. Fittings to be fusion-welded or compression type, ensuring leak-proof, durable installation. |
| 17 | Electrical cables for power and control , earthing and lightining arrestor needed to run the plant - |
| 18 | Part A:- Self Illuminated theme based objects with Water misting system for crossings at various places |
| 19 | SS 304 constructred object of various size and designs Includes supply and installation of supply made from SS tube, suitable for high-pressure use. Each ring shall have 6 ports for nozzles, configurable for 1, 3, or 5 nozzles per port based on site pollution levels.All component to making ring for pole mounted use shall be fully applied with brazing operations, |
| 20 | Operation & Maintenance (O&M) of the installed Automatic Misting Systems for a period of one (1) year, including routine inspection, preventive maintenance, corrective maintenance, replacement of defective components, manpower deployment, consumables, water quality management, system calibration, upkeep of pumps/nozzles/pipelines, and ensuring uninterrupted and efficient functioning of the misting system across all installed locations within Ghaziabad Municipal Area. |
| 21 | Exclusions: Water and Electricity connection Please Enable Macros to View BoQ information |