Tender For Tender For Under The Tajganj Zone Works Undertaken On Fatehabad Road (At The Eidgah Crossing) In Preparation For The Arrival Of The Vice President And Military Commanders From 20 Nations., Agra-Uttar Pradesh
TDR : 55232737
Tender Notice
BOQ
11 Days Left
Agra
Uttar Pradesh
Tender for Tender for Under The Tajganj Zone Works Undertaken On Fatehabad Road (At The Eidgah Crossing) In Preparation For The Arrival Of The Vice President And Military Commanders From 20 Nations.
Name of Work:- rktxat tksu ds vUrxZr mijkVªifr ,oa 20 nskksa ds lsukifr ds vkxeu ij Qrsgkckn jksM+ ij] bZnxkg pkSjkgk] voUrhckbZ pkSjkgk] bUnzk xkW/kh pkSjkgk ,oa txg&txg lh0lh0] fMokbMj dh ejEer o gjk diM+k yxkus dk dk;ZA
Sl. No.
Item Description
1
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1)
2
12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii))
3
Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3)
4
Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
5
Supply and fixing of kurb stone etc. all complete.
6
Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost.
7
Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including with green net and labour component (material will be property of contractor after dismantling).
8
Providing of Fixing Red Stone Jali etc. all complete. (NS)
9
R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3)
10
Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
11
Sub Total (A)
12
Add / Deduction For Estimate Figure Amount Match
13
Grand Total Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.