|
| 1 | Rehabilitation of Old water Treatment Plant (WTP) OF 4.50 MLD Capacity at Parwaripura Filter Mauranipur Jhansi. |
| 2 | Temporary arrangement for cleaning of settling Tank Inclusive all labour & T&P complete by Ball, Bamboo Rassi etc. |
| 3 | Dewatering of Tank for cleaning of settling Tank inclusive deisel pump & operation with all labour T&P all complete works |
| 4 | Cleaning of settling Tank Mud & muddy water with all material, labour T&P complete V=1/2(b1+b2)xHxLx0.7 |
| 5 | Apex painting of all Settling Tank in three coats including supply of all materials, labour T&Ps etc required for proper completion of work |
| 6 | Removal of old Filter Media with all material labour and T&Ps complete |
| 7 | Removal of old Grevel with all material labour and T&Ps complete |
| 8 | Cleaning & Filling of old Grevel with all material labour and T&Ps Direction of Engineer complete |
| 9 | Apex Painting of all Filter bed in three coats including supply pf all material, labour T&Ps etc required for proper completion of work |
| 10 | Cleaning of all water channels with brush anf with all labour and T&Ps complete |
| 11 | Supply & Laying of additional Filter media (sand Effective size 0.45 to 0.70mm & uniformity coefficient 1.3 to 1.7) required for proper thickness fo filter bed as per confirming to relevant I.S 8419-1977 in filter Beds including freight, loading unloading insurence duties all complete. |
| 12 | Painting & Varnishing on iron work in small area with two coat of ready mixed priming paint & two coat of approved superior qualiity ready mixed paint of clear synthetic varnish including supply of all material labour T&P all complete etc PWD 641 |
| 13 | Apex Painting of all Filter House in three coats including supply pf all material, labour T&Ps etc required for proper completion of work |
| 14 | Floor repairing work concrete with 4 cm.(1.5\\") gauge approved stone ballast approved coarse sand and cement in the proporation of 4:2:1 under floors including supply of all materials labour and T&P etc. required for proper completion of work(PWD 279) |
| 15 | 20mm cement concrete topping 1:2(1 cement : 2 stone aggregate of size 4.75mm and below by volume) and monolithic base concrete(PWD 14,67) |
| 16 | Supply & Fixing of iron Gate (size-7.8*5.10 Feet), Window(size-4.11*5.11 Feet-4No.) Window(size-4.8*2.10 feet -3No.), Ventilation (size-1.8*3 feet-5 No) Grill (size-20*2 feet) supply of all materials, labour and T&P etc required for proper completion of work |
| 17 | Supply & Fixing of Electrical wiring with casing (approx 40 mtr 1.5mm wire) with 8 point of LED, 1 Point of 5 Pin Socket, 1 No.8 way PVC Board, 4 way PVC Board, including of all materials labour and T&P etc. required for proper completion of work |
| 18 | Supply & Fitting 50 watt LED wall mounted from Pipe clamp copper wiring and 10 amp main switch for 2 each LED light |
| 19 | Site Clearance & unforseen work Please Enable Macros to View BoQ information |