|
| 1 | Transportation of Rig Machine |
| 2 | Transportation of T&P by truck |
| 3 | Loading & Unloading of T&P 22 jobs |
| 4 | Toeing of Air of Compressor T&P tractor |
| 5 | Transportation of compressor T&P by truck |
| 6 | Loading & Unloading of T&P 12 jobs |
| 7 | Toeing of O.P Unit troll by tractor |
| 8 | Transportation of O.P Unit T&P |
| 9 | Loading & Unloading of T&P |
| 10 | Transportation of Tube well assembly |
| 11 | Loading & Unloading of T.W assembly |
| 12 | 300mm dia M.S ERW housing pipe of 7.1 mm thickness as per IS-3589 |
| 13 | 200mm dia M.S ERW plan pipe of 7.1 mm thickness as per |
| 14 | 33x200 mm dia MS Reducer |
| 15 | 200mm dia M.S ERW Slotted pipe of 7.1 mm thickness as per IS-3589 |
| 16 | 300 mm dia M.Socket/Rings |
| 17 | 200 mm dia M.Socket/Rings |
| 18 | 200mm dia bail plug |
| 19 | 200mm dia center Guide |
| 20 | 300mm dia M.S Housing clamp |
| 21 | 300 mm dia M.S Tube well |
| 22 | 200x100mm dia tube well foundation R.S joint 2.5mt long |
| 23 | Equipage |
| 24 | Drilling of 675m bore from GL to 90m BGL |
| 25 | Drilling of 600m bore from 50m to 90m BGL |
| 26 | Drilling of 600m bore from 90m to 120m BGL |
| 27 | Drilling of 600m bore from 120m to 150m BGL |
| 28 | Drilling of 600m bore from 150m to 180m BGL |
| 29 | Dismentling of Rig machine and T&P after completion of the work |
| 30 | Water Arrangement for construction of T.W |
| 31 | Provision of temporary fancing baricating at T.W site for the protection of children, animals and human being by barbered wire during competion of Tube well and dismentling after completion of work. |
| 32 | Lowering of 300mm dia MS Housing pipe from GL to 40m BGL |
| 33 | Lowering of 200mm dia MS Blind/Slotted from 40m to 90 BGL |
| 34 | Same as above but from 90 to 120m BGL |
| 35 | Same as above but from 120 to 170m BGL |
| 36 | Supply of 1.6mm to 4.8mm size pea gravel LalQuan Quarry |
| 37 | Erection of compressor Unit and cap equipage |
| 38 | Dismentling of above after completion of work |
| 39 | Development of Tube well by 600 PSI capacity air compressor |
| 40 | Erection of O.P Unit and camp equipage |
| 41 | Dismentling of above after completion of work |
| 42 | Development of Tube well by O.P Unit |
| 43 | Yield and verticality test of tube well |
| 44 | Chemical and bacterilogical test of water |
| 45 | Rental charges of Rig machine air commpressor and O.P Unit |
| 46 | Site clearance after campletion of T.W. & cutting, welding of well cap after development and earth filling in water pits |
| 47 | Switch gear material for 30 H.P along with cubical starter, power wiring and earthing material complete in all respect. |
| 48 | Submersible pupm set of 1500 LPM discharges 45 mtr head with 24 mtr columm assembly etc. complete couplet with 30 HP electric motor. |
| 49 | Lifting tackle of tone capacity 4 mtr lift |
| 50 | Pressure and depth gauge with 30 mtr. Airline of 1/4 size hand pupm and fitting etc. complete |
| 51 | Main Piping & Valves of 150mm dia size |
| 52 | Tools and spanners with chain wrenches and clamp 150mm size |
| 53 | Erection of pumping plant and power wiring and earthing and other civil work |
| 54 | Trail testing and commissioning of pumping plant |
| 55 | Watch and ward during the period of installation |
| 56 | Misss. Items i/c transformer iol, of starter civil work for support of delivery line etc. tube well cover |
| 57 | Supply and erection of 14 LPH capacity Electro machanical type chlorinating suitable to inect bleching powder solution up to kg. cm2 pressure complet in all respect Please Enable Macros to View BoQ information |