| 1 | Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wildvegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Technical Specification clause 201.(I) By Manual Means |
| 2 | Flat Brick Soiling Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 3 | Granular Sub-base with Well Graded Material (A) By Mix in Place Method: Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete. |
| 4 | 80 mm thick factory made c.c. interlocking paver block of M-35 Grade:Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method to attain superior smooth finish using PU or equivalent moulds, laid in required grey colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. all complete as per specifications & approval/ direction of the Engineer -in-Charge:(a) 80 mm thick c.c. paver block of M-35 grade with approved colour, design and pattern. |
| 5 | Earth work in excavation for structure.Earth work in excavation for structures as per drawing and MoRD technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & and bottom and back filling in trenches with excavated suitable material.( I ) Ordinary soil( i ) Upto 3m depth |
| 6 | Filling in foundation Trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200 |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).iii) P.C.C grade M 20 ii) Nominal mix 1:2:4 (Hand mixing) |
| 8 | Brick masonry work in cement mortar in substructure complete excepting pointing & plastering, as per drawing & MoRD technical specification Clauses 602, 603, 604, 1202 and 1204. II) In 1:4 cement mortar |
| 9 | Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure as per MoRD technical specification Clauses 613.4 & 1204. |
| 10 | Neat cement punning. |
| 11 | Construction of Embankment with Material Obtained from Borrow PitsConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. |
| 12 | Construction of Subgrade and Earthen ShouldersConstruction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. |
| 13 | (i) Compacting original ground supporting embankment:Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per MoRD Technical Specification Clause 301.4.1. Please Enable Macros to View BoQ information |