| 1 | Stringing of one km 3 PH llkV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 2 | Doing straight joint on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site. |
| 3 | Fitting one set (3No.) llkV LA and giving connections excluding earthing. |
| 4 | Dismantling (without damage) one llkV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking thesame. |
| 5 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 6 | Dismantling of Anchor clamp / dead end clamp for LT AB cable |
| 7 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 8 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 9 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 10 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 11 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 12 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 13 | Additional rate for excavation of Pit for A type pole in Laterite. |
| 14 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 15 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 16 | Fitting and providing one HT Stay for llkV pole, including digging and back filling pit in ordinary soil. |
| 17 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 18 | Fitting one Additional 2.4m/3m Channel cross arm (l00x50x6mm), in existing llkV DP including conveyance of materials. |
| 19 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 20 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and lm below GL). Excavation 0.45x0.45xlm, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 21 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 22 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan ) including getting out anddisposal of excavated earth lead up to 50 m and lift upto1.5 m, as directed by engineer-in-charge .All kinds of soil (Dsr 2018 2.6.1) (Base rate-157.85 X Cost index 1.3559) |
| 23 | Extra for every additional lift 1.5 m or part there of in excavation /banking excavated or stacked materials.All kinds of soil (cost index(c) : 1 included in Rate) |
| 24 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5coarse sand :3 graded stone aggregate 20 mm nominal size |
| 25 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 26 | Steel reinforcement for R.C.C work including straightening, cutting,bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 27 | Stub setting of lattice tower in correct alignment using template in concrete foundation including grouting , anchoring etc. if necessary and removing the template after the expiry of the predetermined time but excluding excavation concreting back filling etc . complete( data taken from latest transmission line data) |
| 28 | centering and shuttering including strutting , propping etc. and removal of form work for foundation ,footing , bases of columns ( DSR 2018 item no 4.3.1(Base Rate 247.29 X Cost index 1.3559) |
| 29 | Erection of tower super structures above ground level including erection of normal and special hill side extension members where ever necessary,providing tower accessories like phase,danger & number plates,bird guards anti climbing device etc complete.(Transmission line data item 18) |
| 30 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 31 | Doing one cable end termination on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplieddepartmentally after making fencing, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 32 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point |
| 33 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 34 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 35 | Fitting and providing one Strut using A type pole,including digging and back filling pit in ordinary soil. |
| 36 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 37 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 38 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 39 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil &backfilling. |
| 40 | Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. Please Enable Macros to View BoQ information |