|
| 1 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 2 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 3 | Renewal of existing damaged/broken old LT stayin existing stay rod |
| 4 | Insertion of one LT PSC polein existing three phase OH .line including digging &back filling pit in ordinary soil, fitting cross arm, insulator, binding etc.excluding transportation ofpoles. |
| 5 | Labour charges for loading LT PSC pole from thestacking place and unloading the same at work site(transportation by any vehicle). |
| 6 | Transporting poles by hired vehicle to a distance upto5km and carrying upto 4 numbers of poles excludingloading& unloading charges. |
| 7 | Fitting one No. Section fuse on LT line with droppingcables, crimping sockets, connecting with bolt & nutetc. |
| 8 | Renewal of existing damaged/old LT PSC/RCC(single phase line) pole with new PSC pole in placeincluding excavation of pole pit, erection of new pole,backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 9 | Providing WP support with PSC pole including digging& back filling pit in ordinary soil. Excluding transportation of poles. |
| 10 | Transporting poles by hired vehicle to a distance beyond5km and carrying upto 4 numbers of poles. (Runningkm) |
| 11 | Providing Strut using LT PSC pole including diggingand back filling pit in ordinary soil. |
| 12 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 13 | Stringing, tensioning, fitting cross arms, insulators andbinding, giving jumper connection etc. using XLPEInsulated ACSR Rabbit or equivalent, for one km LTsingle phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 14 | Erection of Anchor clamp / dead end clamp for 11kVABC of any size |
| 15 | Dismantling (without damage) one km LT threephase 4 wire OH line conductor by dismantlingcross arms, insulators and stacking the conductors inrolls properly. |
| 16 | Dismantling (without damage) one km LTadditional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 17 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 18 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standarddistance away from the pole/structure in ordinary soil & backfilling. |
| 19 | Erection of Anchor clamp / dead end clamp for LT ABCof any size |
| 20 | Installation of Pre-insulated straight through joints for16sqmm cable |
| 21 | Installation of Pre-insulated straight through joints for70sqmm cable |
| 22 | Erection of suspension clamp for LT ABC of any size |
| 23 | Transporting LT ABC by hired vehicle to a distance upto 5 km and carring up to 2 drum including loading andun loading using crane |
| 24 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messengerthrough existing poles |
| 25 | Installing One No. 4 way Satellite Connector of sizeMain :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 26 | Installing One No. Insulation piercing connector of sizeM ain :16 to 95 ,Tap:1.5 to 16Sq.mm |
| 27 | Installation of Insulation piercing connector for mainto service line main :16-95 sqmm, Tap 16-95 sqmm Please Enable Macros to View BoQ information |