| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority :- EXECUTIVE ENGINEER PROVINCIAL DIVISION PWD B&R JALANDHAR Name of Work :- DNIT FOR RESTORATION OF ROAD CUT FROM BHOLATH TO KARTARPUR ROAD IN DISTRICT JALANDHAR. Contract No: Civil Works Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Name Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr |
| 3 | Loosening, leveling and compacting original ground up to a level of 500mm below road crust, mixed with water at OMC, levelled, graded and compacted in layers by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction as per technical clause 305 of MORT&H specifications |
| 4 | Providing & Laying of Fine sand Filling including , loading, unloading, carriage and laying at site, watering & rolling with road roller compacting the bed as per Satisfaction of Engineer in Charge |
| 5 | Construction of granular sub-base by providing material as per grading-III ( Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications |
| 7 | Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications |
| 8 | Providing and applying Tack Coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications |
| 9 | Providing and laying Densegraded Bituminous Macadam 50mm to 75mm thick (Grading II) with Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications |
| 10 | Road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 0.25kg per sqm area as per IRC:35 1997 complete as per technical clause 803 of MORT&H specifications |
| 11 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods |
| 12 | Disposal of Malba |
| 13 | 80% Credit of Earth work (ITEM NO1) |
| 14 | Add extra cost of Cutlural Cess @ 1% on Total cost as items mentioned above Total in Figures 18587530.0 18587530.0 INR One Crore Eighty Five Lakh Eighty Seven Thousand Five Hundred & Thirty Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words Please Enable Macros to View BoQ information |