| 1 | Providing, Laying, Fixing and Jointing of P.V.C. Pipes as per ISI-4985 (ISI mark with the prior approval of Engineer in Charge along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications.specifications for Manually Excavation including speicals (6kgf/ cm2) Pressure |
| 2 | (a) PVC pipe 90mm o/d PVC 6 kg/cm2 |
| 3 | Dismantling of matalled road with Bithminous course 50 ti 75 mm thick with base course and making good the same to its original condition as perDWSS |
| 4 | Dismantling of cement concrete 80mm thick cement concrete 1:2:4 over 100mm thick C.C. 1:8:16 and making good the same to its original condition complete in all respects as per DWSS |
| 5 | Dismentling and restoration of Interlocking Tile 80mm thick cement concrete Interlocking paver block as per DWSS |
| 6 | (a) 90 mm o/d PVC Pipe |
| 7 | Connection with existing PVC pipe including cost of PVC tee and PVC saddle piece and earth work in excavation & back filling complete in all respect |
| 8 | Dismantling end point of distribution pipeline for scowering and super chlorination and jointing using D-Joint including excavation complete. |
| 9 | Bailing out water from the trenches for making new connections in existing pipe lines including cleaning trimming and dressing the trenches to correct alignment and grade as required by the Engineer-in-charge. |
| 10 | (a) Connection with pipe line Upto 300mm i/d |
| 11 | Hand boring Horizontly for crossing of pipe under road or any other obstacle by using Auger/Bocki method.Including excavation stringing and jointing of pipe upto 160mm complete |
| 12 | Supplying and fixing of ISI Marked CI D-joint (complete with nut, bolts & rubber ring) as per IS:8794 for repair of pipe line including cutting , jointing and testing etc. but excluding cost of excavation complete. |
| 13 | (a) 90mm |
| 14 | Providing & Fixing PVC End Cap |
| 15 | Water Connection without Water MeterProviding proposed water connection without multijet water meter to house hold upto wall with providing laying jointing testing G.I. Pipeline 15mm i/d = 2.5 mtr (B-Class) as per CSR 28.36(A), (Above G.L.) Prov and fixing 20mm i/d PP-R pipe with specials = 3.00 mtr (Below GL) including cost of specials such as Tees, Bends., Sockets, Elbow, Peet Valve, Union, Nipple and Hook etc. cutting and threading testing in trenches in the ground and ISI 15mm i/d GM Ferrule as per IS:2692 and 3 inches i/d Clamp with C.I. Bib Cock, 15mm i/d as per IS:210 with Stainless Steel Strainer of approved make as per CSR 30.65(b) |
| 16 | Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze (gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing, testing & cost of Nut, Bolt & insertion sheet, all carriage complete (with the approval of Engineer - in – charge)Class PN-I-as per ISI |
| 17 | (a) 80mm I/d Sluice Valave Flanged |
| 18 | (b) 100mm i/d Sluice Valves flanged |
| 19 | (c) 150mm i/d Sluice Valves flanged |
| 20 | Construction of masonry sluice valve chamber excluding Sluice valve cover as per standard design & drawings of public health department With each of Size 0.6m x 0.6m |
| 21 | Repair of expansion joint including cost of material, Chain Dori, M.S. Nuts and Bolts shuttering etc. complete in all respectExpansion Joint 4\\" |
| 22 | Repair of expansion joint including cost of material, Chain Dori, M.S. Nuts and Bolts shuttering etc. complete in all respectExpansion Joint 6\\" |
| 23 | Construction of Cement Concrete, Foot Path with masonry toe wall & earth filling inside water works as per standard Drawing D-7 & Analysis A-10.Repair of Staff Quarter |
| 24 | Scraping |
| 25 | (a) Cement plaster |
| 26 | 12.5 mm thick cement plaster 1:4 |
| 27 | Terracing consiting of tiles 22.86x11.43x3.83cm laid over 25 mm mud plaster 7.5 cm mud filling on another layer of 25mm mud plaster including two coats of bitumen laid hot at 1.65 Kg. /Sqm top of R.C.C. slab including grouting with cement sandmortar 1:4 and top surface to be left clean after wire brushing |
| 28 | Conglomerate floor 25mm thick cement concretetopping 1:2:4 using mechanical mixer for mixingof material |
| 29 | Distempering with dry distemper of approved manufacture two or more coats over one priming coat to give an even shade |
| 30 | Hollock wood doors shutter windows shutter including hinges, screws, chocks, cheats, stops cords etc. complete fixed in position. Please Enable Macros to View BoQ information |