| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: Executive Engineer, Jal Shakti PHE Mechanical Division Kathua. Name of Work: Fixing of Annual Rate Contract & empanelment of eligible firms for repair / maintenance works of Submersible pump sets and allied works installed at various Tube wells / Dug wells / Pumping stations under the jurisdiction of Jal Shakti PHE Mech. Division Kathua. Contract No: e-NIT 08/JSPHEMK of 2026-27 dated 24-04-2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of work Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rate inclusive of all kind of taxes and rebate is to be adjusted in the quoted rates In Figures To be entered by the Bidder Rs. P Goods & Service Tax Freight Charges (Unloading & Stacking) GST on Freight Rebate On Old Parts in terms of percentage of Column No. 13 In Rs% IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT TOTAL AMOUNT In Words |
| 2 | Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes and submersible cable by hoisting chain pulley block/Manual labour at Tube well/Bore Wells. The job also includes stacking of column pipes at suitable place. |
| 3 | Lowering of standby/repaired submersible pump sets along with column pipes and submersible cable by hoisting chain pulley block/Manual labour . The complete job includes the cost of labour, nut bolts, rubber joint, insulation material etc at site of work. |
| 4 | Loading of damaged submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. Dismantling of Submersible Pump Set at Workshop and checking for its repair. |
| 5 | Repairing to Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
| 6 | Providing and fitting of new Pump Shaft. |
| 7 | Providing and fitting of new impeller. |
| 8 | Repairing of impeller. |
| 9 | Providing and fitting of new Neck Ring. |
| 10 | Providing and fitting of Shaft Sleeve. |
| 11 | Providing and fitting of Coupling with key. |
| 12 | Providing and fitting of Bearing Bush. |
| 13 | Providing and fitting of Bowl |
| 14 | Providing and fitting of Diffuser. |
| 15 | Repairing of Diffuser. |
| 16 | Fitting of pump after repair. |
| 17 | Providing and fitting Submersible pump NRV |
| 18 | Repairing of rotor shaft by way of welding to ends, turning and polishing to the required size. |
| 19 | Providing and fitting of thrust bearing set |
| 20 | Providing and fitting of bearing bush for motor bowl |
| 21 | Providing and fitting of motor bowl upper/ lower |
| 22 | Fitting of motor after repair and rewinding |
| 23 | Assembling of Pump with motor with proper alignment. Testing in test pit at workshop. Loading in Mechanical transport and carriage back to site of work and unloading at site |
| 24 | Fabrication and fitting of Tie Road and Adaptor Nipple having flange at one end and Threads at another ends. |
| 25 | Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Submersible Pump Set complete along with column pipes and submersible cable by hoisting chain pulley block/Manual labour at Tube well/Bore Wells. The job also includes stacking of column pipes at sutiable place. |
| 26 | Lowering of standby/repaired submersible pump sets along with column pipes and submersible cable by hoisting chain pulley block/Manual labour . The complete job includes the cost of labour, nut bolts, rubber joint, insulation material etc at site of work. |
| 27 | Loading of damaged submersible Pump Set in Mechanical transport, carriage to the Workshop and unloading. Dismantling of Submersible Pump Set at Workshop and checking for its repair. |
| 28 | Repairing to Pump Shaft by way of welding, turning and polishing to the actual size, making of key way. |
| 29 | Providing and fitting of new Pump Shaft. |
| 30 | Providing and fitting of new impeller. |
| 31 | Repairing of impeller. |
| 32 | Providing and fitting of new Neck Ring. |
| 33 | Providing and fitting of Shaft Sleeve. |
| 34 | Providing and fitting of Coupling with key. |
| 35 | Providing and fitting of Bearing Bush. |
| 36 | Providing and fitting of Bowl |
| 37 | Providing and fitting of Diffuser. |
| 38 | Repairing of Diffuser. |
| 39 | Fitting of pump after repair. |
| 40 | Providing and fitting Submersible pump NRV |
| 41 | Repairing of rotor shaft by way of welding to ends, turning and polishing to the required size. |
| 42 | Providing and fitting of thrust bearing set |
| 43 | Providing and fitting of bearing bush for motor bowl |
| 44 | Providing and fitting of motor bowl upper/ lower |
| 45 | Fitting of motor after repair and rewinding |
| 46 | Assembling of Pump with motor with proper alignment. Testing in test pit at workshop. Loading in Mechanical transport and carriage back to site of work and unloading at site |
| 47 | Fabrication and fitting of Tie Road and Adaptor Nipple having flange at one end and Threads at another ends. |
| 48 | Disconnecting of Power connections from starter panel, disengaging from delivery bend and extracting out Mono submersible/Submersible Pump Set complete along with column pipes from Dug wells and lowering of standby/repaired mono submersible/submersible pump sets. The complete job includes the cost of labour, nut bolts, rubber joint, insulation material etc at site of work. |
| 49 | Providing and fitting of 3.0 core multistrand flate Cu Submersible cable |
| 50 | 2.5 sqmm |
| 51 | 04 sq mm |
| 52 | 06 sq mm |
| 53 | 10 sq mm |
| 54 | 16 sq mm |
| 55 | Fabrication and fitting of Wash out Tee |
| 56 | 65 mm dia |
| 57 | 80 mm dia |
| 58 | 100 mm dia |
| 59 | Fabrication and fitting of Resting clamp set |
| 60 | Providing and fitting of G.I column pipes of 3 mtr length having flanges at both ends |
| 61 | a) 50 mm dia |
| 62 | b) 65 mm dia |
| 63 | c). 80mm dia |
| 64 | d). 100 mm dia |
| 65 | Fabrication and fitting of M.S flange to G.I/ M.S column pipes of following ID |
| 66 | a) 50 mm dia |
| 67 | b) 65 mm dia |
| 68 | c). 80mm dia |
| 69 | d). 100 mm dia Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words Please Enable Macros to View BoQ information |