Name of Work:- Construction of drain around the MIT Mens Hostel no.7 ( Marjing )
Sl. No.
Item Description
1
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2
All kinds of soil.
3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -
4
All work upto plinth level:
5
1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -
7
-All work upto plinth level:
8
1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
9
Brick work with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in:
10
Cement mortar 1:4 (1 cement : 4 coarse sand)
11
12 mm cement plaster of mix
12
1:4 (1 cement : 4 coarse sand) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.