| 1 | Dagbelling 5 to 7.5 cm deep |
| 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect |
| 4 | Hard soil mixed with Kankar / boulders, Morrum (BSR WRD 2022 Item No. 1c Chapter V) |
| 5 | Soft/ Disintegrated Rock (BSR WRD 2022 Item No. 2a Chapter V) |
| 6 | Hard rock without blasting (BSR WRD 2022 Item No. 2b Chapter V) |
| 7 | Providing and Laying of Cement concrete nominal mix (1:3:6) in position including curing, compaction and finishing well graded crusher broken stone aggregate of maximum size upto 20 mm for Anicut (BSR RDPR 2023 Item No. 170 b) |
| 8 | cement mortar for apron 1;6, 23cm thickness for kharanja (BSR RDPR 2023 Item No.148 b) |
| 9 | R.R. Stone masonary in cement mortar(1:6) (BSR RDPR 2023 Item No.166 a) |
| 10 | Providing and Laying of Cement concrete nominal mix (1:2:4) in position including curing, compaction with well graded crusher broken stone aggregate of maximum size upto 12mm (BSR RDPR 2023 Item no.16) |
| 11 | Cement plaster in cement sand mortar 1:4, 25mm thick with curing. (BSR RDPR 2023 Item No.76 a) |
| 12 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift upto1.5m including dressing of excavated area and dewatering wherever required complete in all respect hard/ dense soil (for black cotton/ clay soil for corewall) (BSR WRD 2022 Item No. 1b Chapter V) |
| 13 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc.in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering including cost of water,loading and un-loading wherever required with cost of dewatering wherever required. (BSR WRD 2022 Item No.13 Chapter V) |
| 14 | Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench ((BSR RDPR 2023 Item No. 185 e ) |
| 15 | Earthwork excavation by JCB Machine / Tractor attached with scraper for embankment in hard soi including breaking of clods, sorting of grass, pebbles etc. and dressing in requried profile with initial lead of 250m and lift up to 3m including loading and un-loading wherever required complete in all respect. (BSR RDPR 2023 Item no. 196 b) |
| 16 | Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone (BSR RDPR 2023 Item No. 167) |
| 17 | Dismelting old cement plaster, skirtin raking out joints and cleaning the surface. (BSR RDPR 2025 Item No.115) |
| 18 | Providing and fixing reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wier) all complete. (BSR RDPR 2025 Item No.61) |
| 19 | Providing of centering & shuttering with steel sheets in RCC for roof, slab, chajja, linten etc. lift upto 4.5m and removing of framework etc. (BSR RDPR 2025 Item No.93 b) |
| 20 | नीव, खाई, परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना (2b) |
| 21 | सीमेन्ट कांक्रिट नींव या फर्श में 40 मि.मी. नामीय माप की पत्थर गिट्टी(crusher broken)/ईट मिटटी , सीमेन्ट- रेत मसाला में 1 सिमेन्ट : 4 रेत : 8 गिट्टी अनुपात में डालना तथा कुटाई करना , तराई समेत । (10 a) |
| 22 | ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। (63) |
| 23 | इनामिल पेन्ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना। (82 a) Please Enable Macros to View BoQ information |