| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 4 | Providing and laying factory made chamfered edge Cement Concrete paver blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer's specifications & direction of Engineer in-Charge., 80mm thick Cement concrete paver block of M-30 grade with approved colour, design & pattern. |
| 5 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 6 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 7 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand) |
| 8 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 9 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 10 | Fine dressing of the ground. |
| 11 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). |
| 12 | Supplying and stacking of good earth at site including royalty and carriage upto 20 km lead and lifts (earth measured in stacks will be reduced by 20% for payment). |
| 13 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 14 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 15 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. |
| 16 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately)., In rows 5 cm apart in both directions |
| 17 | Providing and stacking of Clerodendrum inerme of ht. 20 cm to 30 cm multi branched in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. |
| 18 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water), Hedge Plant /Ground cover |
| 19 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing,weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge. (1Mali for 1.00Acre) |
| 20 | Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc.(excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. |
| 21 | 'Supply & fixing of MS benches including cost of benches (shape & size attached with estime) fixing the wave slide including excavation PCC 1:4:8 cement coarse sand & 40 mm nominal grit with CC 1:2:4 cement coarse sand & 20 mm gauge stone grit including all material & labour required fixing and orienting etc all complete under the direction of the E'/I. Sanction Rate |
| 22 | Supplying and Fixing of Four Seater Swing with sparrow outdoor playing equipment including necessary fittings, T&P etc all complete in direction of engineer in charge. (Model No. FPSW 10, Make Fun Play/ Kompain/ Arihant) |
| 23 | Supplying and Fixing of 7' Ht. FRP Wave Slide Outdoor Playing Equipment Including Necessary Fittings, T&P etc all Complete in Direction of Engineer in Charge. (Model No. FPSD51, Make Fun Play/Kompain/ Arihant) Rate 71960.00 |
| 24 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. |
| 25 | Arrangement of Tractor Trolly including loading unloading of stacked kuda & malwa, removel of Garden wastage including all complete of work. |
| 26 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). |
| 27 | Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth. |
| 28 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor graded on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401. for grading I material (GSB-1) (Sanction rate) |
| 29 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Please Enable Macros to View BoQ information |