| 1 | Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & Iead upto 30m Including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Including Royalty). si no 251 |
| 2 | Concrete with 4cm(1½\\"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 12:6:1 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work. SI NO 273 |
| 3 | First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SI NO 305 |
| 4 | 12 mm thick plaster with cement and coarse sand Mortar in 1:5 over brick work minimum thickness not to be less than 3/8\\" (10 mm) thick including supply of all materials, labour and T&P etc. required for proper completion of the work. Si no 584 (1) |
| 5 | Cement concrete with 2 cm. gauge approved stone, Grit, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI NO 279 (1) |
| 6 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\\") gauge approved stone grit for slabs in the proportion of 1:1½:3 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. SI NO 284A |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SI NO 504 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. SI NO NEW ITEM 1 ROAD WORK |
| 9 | Construction of unreinforced, dowel jointed at expension and construction joint only, plain cement concrete pavement thickness as design, over a prepare subbase, 43 grade cement for any other type as per clause 1501.2.2 M30 (grade), coarse and fine aggregates confirming to IS383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less then 0.2cum capacity and appropriate weight batcher using approved mix desing, laid in approved fixed side from work (steel channel, laying and fixing of 125micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels rakes, compacted using needle, screed and plate vibrator and finished in continous opreation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, dowel bars, near approches to bridge,/culvert and construction joints, admixtures as approved curing of concrete slabs for 14 days curing compound (where specified) and water finishing to line and grade as per drawing and techenical specification clause 1501 |