Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority : GE 881 EWS C/O 56 APO NAME OF WORK:Repair of furniture wooden/steel furniture for units in AOR of Stn KG under GE 881 EWS. Contract No: GE/PNH-15/2026-27 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Rates only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sch. itemNo. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Rs. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Almirah Large Steel FD-351 |
| 3 | Removing unsv shelves of almirah large steel, S&F of new shelves made out of 1 mm thick MS sheet with suitable clips/brackets/gas welding (any one) as per all specified and directed by Engr-in-charge. |
| 4 | Removing unsv foot rest of almirah large steel, S&F of new foot rest made out of 1.6mm thick MS sheet with continuous gas welding all as specified and directed by Engr-in -charge. |
| 5 | Removing unsv lock of almirah large steel, S&F of new lock of six lever with duplicate key with suitable nuts and bolts all as specified and directed by Engr-in-charge Make Godrej/Harrison. |
| 6 | Removing of unserviceable handle of almirah large steel, S&F of new steel handle 150mm long with suitable steel nuts and bolts all as specified and directed by Engineer-in-charge. |
| 7 | Removing of nuserviceable locking device of almirah large steel, S&F of new three way locking device (Chakra/locking rod and locking cover) made out of MS bar round 10mm dia all as specified and directed by Engineer-in-charge. |
| 8 | Removing of unserviceable key plate of almirah large steel, S&F of new key plate all as specified and shown on drg. |
| 9 | Welding as required wherever necessary, all as specified and directed by Engineer-in-charge. |
| 10 | M & L for applying two coats of synthetic enamel OG paint of apporoved quality with spray machine after properly smoothening the surface Including denting and painting of almirah steel large throughout inside, outside complete all as directed by Engineer-in-charge. |
| 11 | Almirah Med Steel (FD- 1032) |
| 12 | Removing unsv shelves of almirah med steel, S&F of new shelves made out of 1 mm thick MS sheet with suitable clips/ brackets all as specified and directed by Engr-in-charge. |
| 13 | Removing unsv foot rest of almirah med steel, S&F of new foot rest made out 1.6mm thick MS sheet with continuos gas welding all as spcified and directed by Engr-in-charge. |
| 14 | Removing unsv lock of almirah med steel, S&F of new lock of six lever with duplicate key with suitable nuts and bolts all as specified and directed by Engr-in-charge Make - Godrej/Harrison |
| 15 | Removing of unserviceable handle of almirah med steel, S&F of new steel handle 150mm long with suitable steel nuts and bolts all as specified and directed by Engineer-in-charge. |
| 16 | Removing of unserviceable locking device of almirah Med steel, S&F of new three way locking device (Chakra/locking rod and locking cover) made out of MS bar round 10mm dia all as specified and directed by Engineer-in- Charge. |
| 17 | Removing of unservicable key plate of almirah med steel, S&F of new key plate all as specified and shown on drg. |
| 18 | Welding as required wherever necessary, all as specified and directed by Engineer-in-Charge. |
| 19 | M & L for applying two coats of synthetic enamel OG paint of apporoved quality with spray machine after properly smoothening the surface Including denting and painting of almirah steel medium throughout inside, outside complete all as directed by Engineer-in-charge. |
| 20 | Locker Bed Side Steel (FD-1029) |
| 21 | Removing of old unsv hasp and staples of locker bed side steel, S&F of new MS hasp and staples as spceified in Drg and approved by the Engr- in- Charge. |
| 22 | Removing of old unsv conduit pipe of locker bed side steel, S&F of new CP steel 16mm dia 22 guage conduit hanging pipe all as specified and directed by Engineer-in- Charge. |
| 23 | Removing of old unsv handle of locker bed side steel, S&F of new CP steel handle 150 mm long as approved by Engineer-in- Charge. |
| 24 | Removing of old unsv hinges of locker bed side steel, S&F of new MS hinges 75mm long as approved by Engineer-in- Charge. |
| 25 | Removing of old unsv foot rest of locker bed side steel, S&F new foot rest made out 1.6 mm thick MS sheet with continuous gas welding all as specified and directed by Engr-in-charge. |
| 26 | Welding as required wherever necessary, all as specified and directed by Engineer-in-Charge. |
| 27 | M & L for applying two coats of synthetic enamel OG paint of apporoved quality with spray machine after properly smoothening the surface Including denting and painting of locker bed side throughout inside, outside complete all as directed by Engineer-in-charge. |
| 28 | Table office clerk steel (FD-1003) |
| 29 | S&F of new locks 4 levers with duplicate keys, the locks shall be of approved quality incl removal of old unserviceable locks complete all as specified and directed by Engineer-in-charge. |
| 30 | Supply and fixing of top with BWR 18/19 mm prelaminated particle board exterior grade natural teak shade on one side and ivory on another side confirming to IS-3097 & IS-12823 with suitable colour PVC edging all round inclding removal of old UNSV Existing Top complete all as specified and directed. |
| 31 | S&F new best quality rubber shoes to four legs of each table, including removal of old broken shoes complete all as specified and directed by Engineer-in-charge. |
| 32 | Welding to broken legs/stiffner complete all as specified and directed by Engineer-in-charge. |
| 33 | Denting and painting of table clerk throughout inside and outside with one coat of synthetic enamel OG paint of approved quality after proper smoothening surfacing denting and repairing be carried out to drawer for fixing and smooth functioning of drawers complete all as specified and directed by Engineer-in-charge. |
| 34 | Rack Steel Adjustable 3 Tier (FD-106(M) |
| 35 | Removing of broken corroded shelf of rack after dismantling it from four angles of rack, S&F new shelf made out of 1mm thick MS sheet as per size mentioned in drg. |
| 36 | Welding as required wherever necessary, all as specified and directed by Engineer-in-charge. |
| 37 | Materials and labour of one coat of synthetic enamel OG colour Paint including denting and painting of surface of rack steel, complete all as specified and directed by Engineer-in-charge. |
| 38 | CHAIR DINING FD-1105 |
| 39 | Dismantling of old unsv /worn out front legs from the chair without damaging the adjacent parts , Materials and labour for fixing the new front legs made out of first class sheesham wood, made to shape, fixed with bamboo pins and fevicol making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 40 | Dismantling of old unsv /worn out rear legs from the chair without damaging the adjacent parts, Materials and labour for fixing the new rear legs made out of first class sheesham wood, made to shape fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 41 | Dismantling of old unsv /worn out rails from the chair without damaging the adjacent parts, Materials and labour for fixing the new sides/back/front rails, made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 42 | Dismantling of old unsv /worn out back stiffener from the chair without damaging the adjacent parts, Materials and labour for fixing the new stiffener of back, made out of 1st class sheesham wood made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 43 | Dismantling of old unsv /worn out stiffeners legs (short/long), from the chair without damaging the adjacent parts, Materials and labour for fixing the new stiffeners legs (short/long), made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 44 | Polishing to chairs with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 45 | CHAIR EASY FD- 1108 |
| 46 | Dismantling of old unsv /worn out front legs from the chair without damaging the adjacent parts, Materials and labour for fixing the new front legs made out of first class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 47 | Dismantling of old unsv /worn out rear legs from the chair without damaging the adjacent part, Materials and labour for fixing the new rear legs made out of first class sheesham wood, made to shape fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 48 | Dismantling of old unsv /worn out sides/back/front seat railss from the chair without damaging the adjacent parts, Materials and labour for fixing the new sides/back/front seat rails, made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 49 | Dismantling of old unsv /worn out back stiffener from the chair without damaging the adjacent partsMaterials and labour for fixing the new short stiffener of back, made out of 1st class sheesham wood made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 50 | Dismantling of old unsv /worn out arms from the chair without damaging the adjacent parts, Materials and labour for fixing the new arms made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 51 | Polishing to chairs with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 52 | CHAIR WRITING/CHAIR WRITING WITH CUSHION FD-1107 |
| 53 | Dismantling of old unsv /worn out front legs from the chair without damaging the adjacent partsMaterials and labour for fixing the new front legs made out of first class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and removing of UNSV cushion foam of chair writing with cushion and supply and fixing new cushion to chair writing cushion 32 mm density cool foam of size 560mmx530x100mm duly covered with best quality rexxine cloth not less than RS 120 per meters as approved duly stretched att as specified and as shown in drg duly wrought on all sides directed by Engineer-in-charge. |
| 54 | Dismantling of old unsv /worn out rear legs from the chair without damaging the adjacent parts , Materials and labour for fixing the new rear legs made out of first class sheesham wood, made to shape fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 55 | Dismantling of old unsv /worn out sides/back/front seat railss from the chair without damaging the adjacent parts, Materials and labour for fixing the new sides/back/front seat rails, made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 56 | Dismantling of old unsv /worn out back stiffener from the chair without damaging the adjacent parts. Materials and labour for fixing the new short stiffener of back, made out of 1st class sheesham wood made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 57 | Dismantling of old unsv /worn out arms from the chair without damaging the adjacent parts, Materials and labour for fixing the new arms made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 58 | Removing old seat from chair ,S&F new seat shall be made 12mm thickhot pressed plywoodupholstered with acrylic fabric 9costing Rs 350/- per RM with 48\\" width) as specified and as shown in drg. |
| 59 | Remove old unsv back of chair S&F new back seat shall be made 12mm thickhot pressed plywoodupholstered with acrylic fabric 9costing Rs 350/- per RM with 48\\" width) as specified and as shown in drg. |
| 60 | Dismantling of old unsv /worn out bottom stiffeners from the chair without damaging the adjacent parts, Materials and labour for fixing the new bottoms stiffeners, made out of 1st class sheesham wood, made to shape, fixed wih bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 61 | Polishing to chairs with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna/burnt seina (as per requirement) and make the surface again smooth with sand/emery paper to the entire satisfaction of Engineer-in-Charge. |
| 62 | CHAIR WB FD-285 |
| 63 | Dismantling of old unsv /worn out front legs from the chair without damaging the adjacent partsMaterials and labour for fixing the front legs made out of first class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/ groove joints as specified and as shown in drg duly wrought on all sides. |
| 64 | Dismantling of old unsv /worn out rear legs from the chair without damaging the adjacent parts , Materials and labour for fixing the new rear legs made out of first class sheesham wood, made to shape fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides |
| 65 | Dismantling of old unsv /worn out sides/back/front seat railss from the chair without damaging the adjacent parts, Materials and labour for fixing the new sides/back/front seat rails, made out of 1st class sheesham wood, made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 66 | Dismantling of old unsv /worn out back stiffener from the chair without damaging the adjacent partsMaterials and labour for fixing the new short stiffener of back, made out of 1st class sheesham wood made to shape, fixed with bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 67 | Removing old seat from chair ,S&F new seat shall be made 6 mm thick as specified and as shown in drg. |
| 68 | Dismantling of old unsv /worn out bottom stiffeners from the chair without damaging the adjacent parts, Materials and labour for fixing the new bottoms stiffeners, made out of 1st class sheesham wood, made to shape, fixed wih bamboo pins and fevicol by making tenon/groove joints as specified and as shown in drg duly wrought on all sides. |
| 69 | Polishing to chairs with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna/burnt seina (as per requirement) and make the surface again smooth with sand/emery paper to the entire satisfaction of Engineer-in-Charge. |
| 70 | SOFA SET 4/5 SEATER (FD-281) |
| 71 | Removing of UNSV cushion foam of sofa set and supply and fixing new cushion to sofa set 32 density, cool foam of size 560mm x 530x100mm duly covered with best quality velvet cloth of cost not less than Rs 180 per metre as approved duly stretched all as specified and directed . |
| 72 | Removing unserviceable broken legs of sofa set carefully without damaging the adjacent parts and fixing new leg of teak wood of size 70 mm x 35 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 73 | Removing unserviceable broken arms of sofa set carefully without damaging the adjacent parts and supply and fixing new arm of teak wood of size 35mm x 70 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 74 | Removing unserviceable broken wooden battens of seat of sofa set carefully without damaging the adjacent parts and S&F new batten of teak wood of size 50 mm x20 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 75 | Removing unserviceable broken wooden bearer from the bottom of wooden tension seat of sofa set carefully without damaging the adjacent parts and supply and fixing the bearer of teak wood of size 40 mmx 40mm in section made to shape as shown on drawing complete all as specified and directed. |
| 76 | Polishing to Sofa Set 4/ 5 seater with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 77 | TABLE 900X600MM WITHOUT DRAWER FD-283 |
| 78 | Removing of old/broken top from existing table with out drawer and providing new table top of 18/19 mm thick prelaminated particle exterior grade natural teak shade on one side and ivory on another side confirming to IS-3097 & IS-12823 with suitable colour PVC edging all round as directed by Engineer-in-charge and shown on drawing. |
| 79 | Removing of Old/broken leg from existing table 3'x2' with out drawer and providing new leg to table as directed by Engineer-in-charge and shown on drawing. |
| 80 | Removing of old/broken short rail from existing table 3'x2' with out drawer and providing new sides rail to table as directed by Engineer-in-charge and shown on drawing |
| 81 | Removing of old/broken long rail from existing table 3'x2' with out drawer and providing new front/rear rail to table as directed by Engineer-in-charge and shown on drawing. |
| 82 | Removing of old/broken side stiffener from existing table 3'x2' with out drawer and providing new side stiffener to table as directed by Engineer-in-charge and shown on drawing. |
| 83 | Removing of old/broken centre stiffener from existing table with out drawer and providing new centre stiffener to table as directed by Engineer-in-charge. |
| 84 | Polishing to Table 3'x2' with out drawer with french polish after cleaning / smoothening the surfaces (old or new) with sand/ emery paper, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 85 | CHAIR MOULDED PLASTIC WITH CUSHION:- (TP) |
| 86 | Remove old unsv seats of Chair and Supply and Fix new seats of 2\\" foam cushion of 32 density and covered with best quality tapastory cloth of cost not less than Rs 180/- per meter all as specified and directed by Engineer-in-charge. |
| 87 | Remove old unsv back of chair and Supply and Fix new back of chair as specified and directed by Engineer-in-charge. |
| 88 | REACANNING OF WOODEN /STEEL FURNITURE :- Material and labour for re-canning of all types of wooden /steel chairs with 2 mm wide half round white plastic cane and border with 3 mm wide half round white plastic cane as per godrej Pattern all as shown and specified in drg and all as directed ' |
| 89 | Chair CB Steel with Arms (FD-77) |
| 90 | Removing of unsv seat frame of chair CB Steel with arms including old screws, S&F new seat frame of well seasoned 1st class sheesham wood duly caned with 2 mm wide plastic cane half round in Godrej pattern fixed to frame with four numbers 75mm machine screws, all as specified and shown on drg. |
| 91 | Removing of unsv back frame of chair CB Steel with arms including old screws, S&F new back frame of well seasoned 1st class sheesham wood duly caned with 2 mm wide plastic cane half round in Godrej pattern fixed to frame with four numbers 75mm machine screws, all as specified and shown on drg. |
| 92 | Removing of unserviceable arms rest of chair CB Steel with arms, S&F of well seasoned 1st class sheesham wood duly painted one coat of synthetic enamelled black paint/ teak shade polished complete all as specified and shown on drg. |
| 93 | Removing of unserviceable rubber cap of chair CB steel with arms, supply and fix of new rubber cap of best quality, complete all as specified and directed by Engineer-in-charge. |
| 94 | Removing of unserviceable rubber shoes of chair CB steel with arms, supply and fix new hard rubber shoes of best quality complete all as specified directed. |
| 95 | Spot welding to broken joints/parts wherever necessary as specified and directedby Engineer-in-charge. |
| 96 | Painting of steel frames with two coat of synthic enamel OG paint of approved quality after preparation of surfaces all as specified and directed by Engineer-in-charge. |
| 97 | Removing of unserviceable flat rion strip from the bottom of seat and back of chair, supply and fix new flat iron strip of size 50mm x 20mm x 3mm two at bottom and two at back to provide support with welding the both ends of strip with conduit of chair, complete all as specified and directed by Engineer-in-charge. |
| 98 | Table 900x600x700mm without drawer (Drg N0 FD-1007) :- |
| 99 | Removing of old/broken top from existing table without drawer and providing new table top of 18/19 mm thick prelaminated particle exterior grade natural teak shade on one side and ivory on another side confirming to IS-3097 & IS-12823 with suitable colour PVC edging all round as directed by Engineer-in-charge and shown on drawing. |
| 100 | S&F new best quality rubber shoes to four legs of each table, including removal of old broken shoes complete all as specified and directed by Engineer-in-charge. |
| 101 | Welding to broken legs/stiffner complete all as specified and directed |
| 102 | Denting and painting of table clerk throughout inside and outside with one coat of synthetic enamel OG paint of approved quality after proper smoothening surfacing denting and repairing be carried out to drawer for fixing and smooth functioning of drawers complete all as specified and directed by Engineer-in-charge. |
| 103 | Rack steel Adjustable 6 tier (FD-106 (M) |
| 104 | Removing of broken corroded shelf of rack after dismantling it from four angles of rack, S&F new shelf made out of 1mm thick MS sheet as per size mentioned in drg. |
| 105 | Welding as required wherever necessary, all as specified and directed by Engineer-in-charge. |
| 106 | Materials and labour of one coat of synthetic enamel olive green colour including denting and painting of surface of rack steel, complete all as specified and directed by Engineer-in-charge. |
| 107 | TABLE DINING 6 PERSONS (FD- 273) Removing of old broken parts of table carefully without damaging adjacent parts, supply and fixing of new parts made of well seasoned sheesham/teak wood, made to shape as per drawing, joints to be strengthened by using adhesive and bamboo pins complete and shown on drawing for the following parts of items :- |
| 108 | Supply and fixing top to the table made out of 18/19 mm thick prelaminated particle board exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood. |
| 109 | Removing of old/ broken legs from existing table dining 6person, providing new legs made out of first class Teak/sheesham wood as directed by Engineer-in-charge and shown on drawing. |
| 110 | Removing of old/broken long rail from existing table dining 6 person, providing new front /rear rail to table as directed by Engineer-in-charge and shown on drawing. |
| 111 | Removing of old/broken short rail from existing table dining 6 person, providing new side rail to table as directed by Engineer-in-charge and shown on drawing. |
| 112 | L-Shape corner of flat iron as per drawing between legs and rail fixed with screws. |
| 113 | Scratching the entire wooden pallets of table, filling putty to the bore holes making surface smooth by scratching it with sand emery paper, the table shall be polished with french polish after properly cleaned and smoothened the surface complete, all as specified and directed. |
| 114 | TEAPOY |
| 115 | Removing of old/broken top from existing teapoy and of providing new top to teapoy of 18 mm thick prelaminated particle board exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood as directed by Engineer-in-charge and shown on drawing. |
| 116 | Removing of Old/broken leg from existing teapoy and providing new leg to teapoy of teak wood as directed by Engineer-in-charge and shown on drawing. |
| 117 | Removing of old/Broken long rail from existing teapoy and providing new side rail teak wood to teapoy as directed by Engineer-in-charge. |
| 118 | Removing of old/broken short rail from existing teapoy and providing new front/rear rail of teak wood to teapoy as directed by Engineer-in-charge and shown on drawing. |
| 119 | Removing of old/broken side stiffener from existing teapoy and providing new side stiffener to teapoy as directed by Engineer-in-Charge and shown on drawing. |
| 120 | Polishing to teapoy with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery paper, refilling the bore holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paper to the entire satisfaction of Engineer-in-Charge. |
| 121 | PEG TABLE FD-25(M) |
| 122 | Removing old broken top from existing table peg and providing new top to table peg of 18 mm thick prelaminated particle board exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood as directed by Engineer-in-charge and shown on drawing. |
| 123 | Removing of old/broken leg from existing table peg and providing new leg of teak wood to table peg as directed by Engineer-in-Charge and shown on drawing. |
| 124 | Removing of old/ broken side rail form existing table peg and providing new side rail of teak wood to table peg as directed by Engineer-in-Charge and shown on drawing. |
| 125 | Removing of old/brokn front/rear rail from existing table peg and providing newfront/rear rail of teak wood to table peg as directed by Engineer-in-charge and as shown on drawing. |
| 126 | Polishing to Peg Table with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paper to the entire satisfaction of Engineer-in-Charge. |
| 127 | BED PLY WOOD TOP FD-246 Removing old broken parts of bed carefully without damaging adjacent parts, supply and fixing of new parts made of well seasoned sheesham/ teak wood, made to shape as per drgs, joints to be strengthened by using adhesive and bamboo pins complete all as specified and directed by Engineer-in-charge and shown on drawing for the following parts of items:- |
| 128 | Removing old broken / decayed head rest and Supply and fixing in position head rest including legs made out of well seasoned 1st class teak wood frame, supply and fixing 4mm thick plywood one side teak faced on the frame all as specified and directed. |
| 129 | Removing old broken/cracked rail and supply and fixing long rail of bed of size 75mmx50mmx1980mm made out of 1st class teak wood duly wrought and ends slightly rounded off, made to shape as shown on drawing and all as directed. |
| 130 | Removing of old broken/ decayed foot rest and supply and fixing in position foot rest including legs made out of well seasoned 1st class teak wood frame, supply & fix 4mm thick plywood one side teak faced on side of the frame all as specified and as directed. |
| 131 | Removal of unserviceable plywood,supply & fix new plywood top 12 mm thick (7 ply) BWR, type BB, commercial quality complete all as specified and directed by the Engineer-in-charge. |
| 132 | French polishing of bed after cleaning the surfaces (old or new) with sand/emery paper, refilling the borer holes/cracks with puttty (whenever required,) applying the raw sienna/ burnt sienna as per requirement, make the surface smooth again with sand/emery paper to the entire satisfaction of Engineer-in-charge. |
| 133 | Trestle Store room Steel FD-1043 |
| 134 | Materials and labour of one coat of synthetic enamel silver colour Paint including denting and painting of surface of Trestle store room steel, complete all as specified and directed by Engineer-in-charge. |
| 135 | Welding as required whenevernecessary all as specified. |
| 136 | TABLE DINNNING 8 PERS (FD-259)Removing of old broken parts of table carefully without damaging adjacent parts, supply and fixing of new parts made of well seasoned sheesham/teak wood, made to shape as per drawing, joints to be strengthened by using adhesive and bamboo pins complete and shown on drawing for the following parts of items :- |
| 137 | Supply and fixing top to the table made out of 18/19 mm thick prelaminated particle board exterior grade, natural teak color, edges duly covered with 4mm thick edging of teak wood. |
| 138 | Removing of old/ broken legs from existing table dining 8person, providing new legs made out of first class Teak/sheesham wood as directed by Enginner-in-charge and shown on drawing |
| 139 | Removing of old/broken long rail from existing table dining 8 person, providing new front /rear rail to table as directed by Engineer-in-charge and shown on drawing. |
| 140 | Removing of old/broken short rail from existing table dining 8 person, providing new side rail to table as directed by Engineer-in-charge and shown on drawing |
| 141 | L-Shape corner of flat iron as per drawing between legs and rail fixed with screws. |
| 142 | Scratching the entire wooden pallets of table, filling putty to the bore holes making surface smooth by scratching it with sand emery paper, the table shall be polished with french polish after properly cleaned and smoothened the surface complete, all as specified and directed. |
| 143 | Chair Dining Officers FD/MAP-11/04 |
| 144 | Polishing to chairs with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 145 | Charpoy GI Pipe with Plytop FD-230 |
| 146 | Taking down old unserviceable plywood form GI charpoy (FD-220) and S & F of 12mm thick ply wood (7 Nos of ply) of size 1980mmx900mm BWR grade or as per ground requirment. Fixing of ply wood on the top of GI charpoy with flat headed bolt. Nut and washers of size 60-65mmx6mm dia shall be done all as specified and directed by Engr-in-Charge in the way as under :- (a) Two Nos of stiffeners made out of flat iron of size 50mm wide and 6mm thick of length as width of charpoy for support of plywood shall be provided Both the ends of GI stiffeners shall be bent into shape as directed and a hole of 6mm dia shall be made at the both ends with drill machine so as to fix it with long rail of GI charpoy with sutiable size of flat headed bolts, nut and double washer having full support to ply wood. GI stiffeners shall have one additional hole of 6mm dia at the centre for fixing ply wood with nut, bolt and washers. Stiffeners shall be panted with two coats of enamelled black paint over a coat of red oxide primer. (b) Drilling of three holes on long rails and two holes on short rails of 6mm dia for fixing plywood. |
| 147 | Taking down old broken/unserviceable long rail of GI charpoy and S&F new long rails made out of GI tubing 32mm bore medium grade ISI marked with both ends threaded as shown on drg and all as directed By Engr-In-Charge. |
| 148 | Cutting existing Unserviceable long rails retrived from item 24.02 above and converting into short rails as per existing pattern/design duly threaded at both end and fixing the same including taking out old unserviceable short rails all as per drg. |
| 149 | Cutting existing unserviceable short rails retrived from item 25.03 above and converting into legs all as per existing pattern/design duly threaded 32mm at one end and fixing the same after taking out old unserviceable legs complete all as per drg. |
| 150 | Taking down old unserviceable three way GI elbow from GI charpoys by unscrewing and provision of new GI elbows 32mm ISI maked and fixing as per existing pattern/design complete all as specified and as directed by Engr-in-Charge. |
| 151 | Taking down old broken/unserviceable check nuts from GI charpoys by unscrewing and provision of new GI check nut 8mm wide, 32mm dia ISI marked and fixing as per existing pattern/design complete all as specified and shown on drg. |
| 152 | REPAIR OF TABLE DRESSING LADIES;- Repair of following parts of table dressing ladies as per existing shape and size duly planned and finished as shown on drg complete all as specified and directed :-FD-378 |
| 153 | Removal old U/S looking Glass and fixing new glass of 5mm thick as per existing shape and size. |
| 154 | Removal old U/S back ply of glass and fixing 6mm thick Commercial plywood ( 5 nos of ply)of existing shape & size. |
| 155 | Removal of old U/S sliding glass and fixing new glass of 3mm thick as per existing. |
| 156 | Removal of old U/S Pre-laminated particle board top of table and fixing new 18mm th pre-laminated particle board exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood as per existing shape & size. |
| 157 | Removal of old U/S leg of table and fixing new legs of ist class hard wood (teak) |
| 158 | Removal of old U/S Drawer and fixing new Drawer of 6 mm thick ply wood commercial ( 5 nos of ply) with front 18mm pre-laminated particle board exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood as per existing shape and size |
| 159 | REPAIR TO SIDE BOARD: S&F in repair to the following parts of side board as per existing shape and size duly planned complete all as specified and directed. FD-241 /1112 |
| 160 | Bottom |
| 161 | Shelves |
| 162 | Drawer shall be made of 6mm thick commercial plywood (5 nos of ply) with 18mm thick pre-laminated particle board front exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood. |
| 163 | Shutter with 40mm size knob |
| 164 | Back shall be made of 6mm thick commercial plywood BWR grade ply with 5 nos of ply. |
| 165 | Bottom frame with 4 Nos of legs shall be made of Ist class hard wood (teak) |
| 166 | M&L for polishing of side board with high class French polish on all exposed surfaces except topand bottom incl after preparation of surfaces complete all as specified and directed |
| 167 | REPAIR OF TABLE BED SIDE S&F in repair of the following parts of Table Bed Side with 18mm th pre-laminated particle board exterior grade conforming to IS, natural teak colour, as per existing shape and size as shown on drawing complete all as specified and directed; FD-1114 /276 |
| 168 | Shelf |
| 169 | Bottom |
| 170 | Back shall be made of 6mm thick ply wood commercial with 5 nos of ply as per existing shape and size and shown in drgs and directed |
| 171 | Ist class hard wood (teak) 6mm thick beading at front on 18 th pre-laminated particle exposed portion of table bed side |
| 172 | Ist class hard wood (teak) frame with 4 nos of legs duly french polish. |
| 173 | REPAIR TO TABLE 900mm x 900mm:- S&F in repair following parts of the table 900x900mm with Ist class hard wood (teak) as per existing shape and size duly Planned as shown on drawing complete all as specified and directed ;- FD-1009 |
| 174 | Short rail |
| 175 | Table top of 18/19MM thick pre-laminated particle board one side teak wood face and other side white balancing incl 6mm thick teak wood edging all round complete as shown in drg and directed. |
| 176 | S&F new best quality rubber shoes to four legs of each table, including removal of old broken shoes complete all as specified and directed. |
| 177 | M&L for polishing of table 900x900mm with high class French polish on all exposed surfaces except top & Bottom incl matching new components with old one after preparation of surfacecomplete all as specified and directed. |
| 178 | REPAIR TO CHAIR WRITING MAP (FD/E6/MAP/12) |
| 179 | Removal of old U/S tapestry of seat frame and S&F new tapestry of seat frame approved by Engr-in-charge with PVC liping all round complete all as specified and directed by Engr -in charge Note- Cost of tapestry not less than Rs 150/- per meter. |
| 180 | All as per item No 29.01 her-in-before but back frame |
| 181 | Removal od old u/s hand rest of chair writing MAP and S&F new hand rest one piece made of black integral skin,reinforced with MS insert it. Hand rest have slope towards front, complete all as specified and directed by Engr -in charge. |
| 182 | Removal of old U/S leg frame and S&F new leg frame of cantilever type MS tubular frame of size 25mm x 10mm complete all as specified and directed by Engr -in charge. |
| 183 | Removal of old U/s foam cushioned from seat & back and S&F new moulded foam cushioned 40mm density as shape and size and fixed over 12mm thick hot pressed plywood with PVC liping all round, complete all as specified and directed by Engr -in charge. |
| 184 | Taking down old U/S Rubber stopper and S&F new Rubber stopper at the bottom of leg. |
| 185 | M&L for painting to iron surface of chair writing MAP with one coat of synthetic enamel paint including preparation of old painted steel surfaces complete all as specified and directed by Engr -in charge. |
| 186 | SOFA SET SINGLE SEATER 1113 |
| 187 | Removing of UNSV cushion foam of sofa set and supply and fixing new cushion to sofa set 32 density, cool foam of size 560mm x 530x100mm duly covered with best quality velvet cloth not less than Rs 180 per metre as approved duly stretched all as specified and directed :Make Kurlon, or equivalant as approved by GE. |
| 188 | Removing unserviceable broken legs of sofa set carefully without damaging the adjacent parts and fixing new leg of teak wood of size 70 mm x 35 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 189 | Removing unserviceable broken arms of sofa set carefully without damaging the adjacent parts and supply and fixing new arm of teak wood of size 35mm x 70 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 190 | Removing unserviceable broken wooden battens of seat of sofa set carefully without damaging the adjacent parts and S&F new batten of teak wood of size 50 mm x20 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 191 | Removing unserviceable broken wooden bearer from the bottom of wooden tension seat of sofa set carefully without damaging the adjacent parts and supply and fixing the bearer of teak wood of size 40 mmx 40mm in section made to shape as shown on drawing complete all as specified and directed. |
| 192 | Polishing to Sofa Set single seater with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 193 | SOFA SET 2 SEATER FD-281 |
| 194 | Removing of UNSV cushion foam of sofa set and supply and fixing new cushion to sofa set 32 density, cool foam of size 560mm x 530x100mm duly covered with best quality velvet cloth not less than Rs 180 per metre as approved duly stretched all as specified and directed :Make Kurlon, or equivalant as approved by GE. |
| 195 | Removing unserviceable broken legs of sofa set carefully without damaging the adjacent parts and fixing new leg of teak wood of size 70 mm x 35 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 196 | Removing unserviceable broken arms of sofa set carefully without damaging the adjacent parts and supply and fixing new arm of teak wood of size 35mm x 70 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 197 | Removing unserviceable broken wooden battens of seat of sofa set carefully without damaging the adjacent parts and S&F new batten of teak wood of size 50 mm x20 mm in section made to shape as shown on drawings complete all as specified and directed. |
| 198 | Removing unserviceable broken wooden bearer from the bottom of wooden tension seat of sofa set carefully without damaging the adjacent parts and supply and fixing the bearer of teak wood of size 40 mmx 40mm in section made to shape as shown on drawing complete all as specified and directed. |
| 199 | Polishing to Sofa Set single seater with french polish after cleaning/smoothening the surfaces (old or new) with sand/ emery pape, refilling the borer holes/cracks with putty (wherever required) applying the raw sienna (as per requirement) and make the surface again smooth with sand/emery paperto the entire satisfaction of Engineer-in-Charge. |
| 200 | REPAIR TO CHAIR CB STEEL WITHOUT ARMS (FD-75(M) |
| 201 | Removal of old U/S seat frame and S&F new seat frame of 1st class hard shisham wood duly planned and finished smooth duly polished with high class black polish including weaving with 2 mm wide plastic cane half round with Godrej pattern & border with 3 mm wide plastic cane superior quality & frame shall be fixed with machine screws of required size complete all as specified and directed. |
| 202 | All as per item No 32.01 her-in-before but back frame |
| 203 | M&L for painting to chair CB steel without arms with one coat of synthetic enamel paint including preparation of old painted steel surfaces complete all as specified and directed. |
| 204 | CHARPOY DOUBLE BUNK |
| 205 | Taking down old unserviceable ply 12mm thick from the frame of Chaproy S & F 12mm thick BWR Plywood ( 7 nos of ply) of approved make and brand Complete all as specified and directed by Engineer-in-Charge. (i) Four Nos of stiffeners made out of flat iron of size 50mm wide and 6mm thick of length as width of charpoy for support of plywood shall be provided Both the ends of GI stiffeners shall be bent into shape as directed and a hole of 6mm dia shall be made at the both ends with drill machine so as to fix it with long rail of GI charpoy with sutiable size of flat headed bolts, nut and double washer having full support to ply wood. (ii) Stiffeners shall have one additional hole of 6mm dia at the centre for fixing ply wood with nut, bolt and washers. Stiffeners shall be panted with two coats of enamelled black paint over a coat of red oxide primer |
| 206 | Taking out existing unserviceable nut and bolts from charpoy double bunk as per existing size 50 mm long , S&Fnew nut and bolt complete all as specified and directed by Engr-in-charge. |
| 207 | Materials and labour of one coat of synthetic enamel silver colour paint to steel portion of double bunk charpoy, rest all as specified and directed by Engineer-in-charge. |
| 208 | REPAIR TO TABLE CENTRE:-S&F in repair of the following parts of table centre with Ist class wood (teak)As per existing shape and size duly planned as shown on drawing completed all as specified and directed;- FD-274/1114. |
| 209 | Long rail |
| 210 | Short rail |
| 211 | Side stiffener |
| 212 | Taking out old u/s top and S&F new top of made of 18/19mm thick prelaminated particle board one side teak face and other side white balancing exterior grade with incl 6mm thick wood beading all round the top complete all as specified and directed |
| 213 | M&L for polishing of Table Centre with high class French polish on all exposed surface except top &bottom incl after preparation of surface complete all as specified and directed. |
| 214 | Table Office Officer Steel FD-1003 |
| 215 | Welding to broken legs/stiffner complete all as specified and directed. |
| 216 | S&F of new locks 4 levers with duplicate keys. The locks shall be of approved quality incl removal of old unserviceable locks complete all as specified and directed. |
| 217 | Supply and fixing of top with BWR 18/19 mm prelaminated particle board exterior grade natural teak shade on one side and ivory exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood. inclding removal of old UNSV Existing Top as directed. |
| 218 | S&F new best quality rubber shoes to four legs of each table, including removal of old broken shoes complete all as specified and directed. |
| 219 | Denting and painting of table clerk throughout inside and outside with one coat of synthetic enamel OG paint of approved quality after proper smoothening surfacing denting and repairing be carried out to drawer for fixing and smooth functioning of drawers complete all as specified and directed. |
| 220 | Charpoy steel hard top JCOs/ORs |
| 221 | Taking down old unserviceable Plywood Top form charpoy Steel Hard Top (FD/CWE/05/2014) and S & F of 12mm thick ply wood (7 Nos of ply) of size 1980mmx900mm BWR grade or as per ground requirment. Fixing of ply wood on the top of charpoy Steel Hard Top with flat headed bolt. Nut and washers of size 60-65mmx6mm dia shall be done all as specified and directed by Engr-in-Charge. |
| 222 | Taking down old broken/unserviceable long rail of charpoy Steel Hard Top and S&F new long rails made out of 16 Gauge MS Tube of size 1980 mm long, 25mm Width & 65 mm Height all as specified and directed by Engr-in-Charge. |
| 223 | Cutting existing unserviceable Long rails retrived from item 36.02 above and converting into Short Rails & fixing the same as specified and directed by Engr-in-Charge. |
| 224 | Taking down old broken/unserviceable legs of charpoy Steel Hard Top and S&F new legs made out of 16 Gauge MS Tube of size 550 mm long, 32mm Width & 32 mm Height shall be done all as specified and directed by Engr-in-Charge. |
| 225 | Taking down old broken/unserviceable MS Tube Cleat of charpoy Steel Hard Top and S&F of new Cleat made out of MS Tube of size 25x60x6 mm shall be welded with frame to support plywood. |
| 226 | Taking down old broken/unserviceable 19 mm thick pre-laminated partical head board of charpoy Steel Hard Top and S&F new 19 mm thick pre-laminated partical head board of Size 850x230mm exterior grade conforming to IS, natural teak colour, edges duly covered with 4mm thick edging of teak wood.shall be done all as specified and directed by Engr-in-Charge. |
| 227 | Taking down old broken/unserviceable Rubber Shoes for legs foot of charpoy Steel Hard Top and S&F new Rubber Shoes for legs foot of Size 32x32x32mm shall be done all as specified and directed by Engr-in-Charge. |
| 228 | Taking down old broken/unserviceable MS Tube in between Long rails to support plywood of charpoy Steel Hard Top and S&F of new MS Tube of size 900mm long, 25mm width and 25 mm height shall be welded with frame to support plywood. |
| 229 | Taking out existing unserviceable nuts & bolts from Charpoy Steel Hard Top as per existing size 60 mm long, S&F new nut and bolt complete all as specified and directed by Engr-in-Charge. |
| 230 | Welding of charpoy Steel Hard Top where as required complete all as specified and directed by Engr-in-Charge. |
| 231 | Materials and labour of two coat of synthetic enamel black colour paint by Spray gun on all steel protion of charpoy Steel Hard Top. Complete all as specified and directed by Engineer-in-charge. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail