| 1 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of pipes in trenches and getting out, complete all as specified & directed. |
| 2 | Excavation in trenches in hard/dence soil not exceeding 1.5 metre deep and not exceeding 1.5 metre wide for laying of pipes in trenches and getting out, complete all as specified & directed. |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick each, after laying of pipeline complete all as specified & directed. |
| 4 | Removing excavated surplus material to a distance not exceeding 50 metres and depositing where directed, at a level not exceeding 1.5 metre above the starting point, complete all as specified & directed. |
| 5 | Taking up Ductile iron water mains (including all fittings) for the sizes of bore 150 mm with spigot and socket ends and titan joints complete. |
| 6 | All as per item No 5 .but dia 100 mm bore. |
| 7 | S&F Ductile iron (K-9) size of bore 150 mm with all special, fittings, titan joints complete all as directed. |
| 8 | All as per item No 7 .but dia 100 mm bore. |
| 9 | Supply only GI fittings of any size, any type such as bends, tee, nipple, union, elbow , plugs etc complete all as directed. |
| 10 | Taking out old MS/ERW (heavy duty) pipe 150 mm bore, laid in trenches, under the roads or fixed on walls, with and including all old fittings and connections, complete all as directed. |
| 11 | All as per item No 10 here-in-before but for pipe of size100 mm bore. |
| 12 | All as per item No 10 here-in-before but for pipe of size 80 mm bore. |
| 13 | M&L for laying the MS ERW pipe 150 mm bore heavy duty with all fitting i.e. including tee, elbow, reducer, union, nipple, socket etc. in new or old position, floors, walls, ceiling complete all as specified & directed. |
| 14 | All as per item No 13 here-in-before but for pipe of size 100mm bore. |
| 15 | All as per item No 13 here-in-before but for pipe of size 80mm bore. |
| 16 | Taking out GI Tubing 150 mm bore, laid in trenches/, under the roads or fixed on roof and wall with and including all old fittings and connections, complete all as directed. |
| 17 | All as per item No 16 here-in-before but for pipe of size 100 mm bore. |
| 18 | All as per item No 16 here-in-before but for pipe of size 80 mm bore. |
| 19 | All as per item No 16 here-in-before but for pipe of size 50 mm bore. |
| 20 | All as per item No 16 here-in-before but for pipe of size 40 mm bore. |
| 21 | All as per item No 16 here-in-before but for pipe of size 25 mm bore. |
| 22 | All as per item No 16 here-in-before but for pipe of size 20 mm bore. |
| 23 | All as per item No 16 here-in-before but for pipe of size 15 mm bore. |
| 24 | M&L GI tubing 150 mm bore, medium grade, ISI marked with and including all fittings i.e. tee, elbow, reducer, union, nipple, socket etc. in new or old position laid in trenches/walls/roof complete all as directed. |
| 25 | All as per item No 24 here-in-before but for pipe of size 100 mm bore. |
| 26 | All as per item No 24 here-in-before but for pipe of size 80 mm bore. |
| 27 | All as per item No 24 here-in-before but for pipe of size 50 mm bore. |
| 28 | All as per item No 24 here-in-before but for pipe of size 40 mm bore. |
| 29 | All as per item No 24 here-in-before but for pipe of size 25 mm bore. |
| 30 | All as per item No 24 here-in-before but for pipe of size 20 mm bore. Please Enable Macros to View BoQ information |
| 31 | All as per item No 24 here-in-before but for pipe of size 20 mm bore. Please Enable Macros to View BoQ information |