|
| 1 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve danger lighting, guarding etc. complete as per the operations, traffic management, providing barricading, direction of engineer incharge. A) Repairs to PVC Pipeline,Outer dia in mm, I) 63mm |
| 2 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve danger lighting, guarding etc. complete as per theoperations, traffic management, providing barricading, direction of engineer incharge. A) Repairs to PVC pipeline, Outer dia. in mm, III)90mm |
| 3 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve danger lighting, guarding etc. complete as per theoperations, traffic management, providing barricading, direction of engineer incharge. A) Repairs to PVC pipeline,Outer dia. in mm, IV)110mm |
| 4 | Repairs to pipeline network (leakage /breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.160mm |
| 5 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. B. Repairs to A.C pipeline Nominal Dia in mm I. 80mm |
| 6 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.- Repairs to A.C pipeline (Nominal Dia in mm)-100mm |
| 7 | Repairs to pipeline network (leakage /breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.- Repairs to A.C pipeline (Nominal Dia in mm)- 150mm |
| 8 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.- Repairs to A.C pipeline (Nominal Dia in mm)-300mm |
| 9 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportaion, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. Repairs to D.I / C.I pipelinenominal dia 200mm |
| 10 | Hiring of electrical / diesel breaker for cutting bituminous roads, concrete and hard surface including operator for breaker, electrical wire etc. complete with all safety measures as directed by engineer in charge. |
| 11 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 12 | Providing and laying in position cement concrete 1: 2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level Please Enable Macros to View BoQ information |