| 1 | [10.30.2]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 2. Medium shade pigment using 50% white cement 50% Grey cement [Through Rate] |
| 2 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate] |
| 3 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] |
| 4 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 5 | [11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) [Through Rate] |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 7 | [17.8.1]Compaction 1. Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling [Through Rate] |
| 8 | [2.B0155] B0155. Common burnt clay modular bricks class designation 7.5 [Rate] 1000 NOS |
| 9 | [2.RM079] RM079. Earth Cost or compensation for earth taken from private land [Rate] |
| 10 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] |
| 11 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [Beyond 10km up to 20km per KM] |
| 12 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [Beyond 5km up to 10km per KM] |
| 13 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 14 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] |
| 15 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 16 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate] |
| 17 | [6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] |
| 18 | [6.8.2]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 2. 40mm thick [Through Rate] |
| 19 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] |
| 20 | providing and fixing of wicket gates with brick and RCC pillars having minimum weight of gate 65 kg including painting two coats, distempering of pillars complete in all respect and to the entire satisfaction of Engineer in Charge as per design and drawing |
| 21 | Providing and fixing of main gate with Brick and RCC piller Please Enable Macros to View BoQ information |