| 1 | 1152.00 mtr 2 lane BT Road |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per the Direction of Engineer in charge. |
| 3 | Earth work excavation in hard soil within 50m. initial lead and 1.5m. extra lift over initial lift including rough dressing and breaking clods to maximum 5cm. to 7cm. and laying in layer. |
| 4 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as per direction of Engineer in charge. |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 7 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 8 | Providing and laying dense graded bituminous macadam with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, l;aying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, olling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 507 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 9 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 10 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 11 | Providing compacted granular materials in shoulder by using moorum having required P.I. value spreading in uniform layers not exceeding 100 mm in depth and compating with smooth wheeled roller to achieve the density, as per approved drawing & technical specifications and as per clause - 407 of mort&h specifications for road & Bridge works (5th Revision) including cost, conveyence, royality & other taxes of materials, cost of labours, machinery, T&P etc complete and as per the direction of Engineer in charge. |
| 12 | Providing and applying Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (DATA BOOK, P-295, Item-8.13) including cost of all materials, labour, T&P, taxes, royalty etc complete in all respect and as per the direction of Engineer in charge. |
| 13 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying |
| 14 | Supplying bending binding the MS reinforcements including tying the grills and placing in position etc. complete. |
| 15 | Providing and fixing of road stud 100x100 mm, die cast in aluminium. Resistant to corrosive effect of salt and grit, filted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4 :1973. |
| 16 | 04 nos Cantilever Sign Board |
| 17 | Earthwork in hard soil or gravelly soil within 50m initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm including all cost. |
| 18 | Filling foundation and plinth with sand well waterred & rammed etc complete including all cost. |
| 19 | Cement concrete (1:3;6) by using 4cm size HG metal including all cost etc complete. |
| 20 | RCC work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips including all cost. |
| 21 | Supplying, fitting and placing uncoated HYSD bar reinforceemnt complete as per drawing etc complete. |
| 22 | 6mm thick cement plaster with cement mortar (1:4) over RCC surface including deep chiping including all cost. |
| 23 | Providing and erection of over head signage as per clause 802.7 and 802.3 over a design support system of MS square pipe as trusses as per structural design requirement and approved plans placing in position including all cost. |
| 24 | Providing and fixing of 3mm thick corrossion resistant A.C.P as over head signage body including all cost etc complete. |
| 25 | Providing, fitting and fixing of HIP retro signage over ACP as per approved design including all cost etc complete. |
| 26 | Providing painting two coats to MS sqr pipe with any approved paint over a caot of primer including all cost etc complete. |
| 27 | GST as applicable will be paid extra. Please Enable Macros to View BoQ information |