| 1 | SITC of ACSR 0.2 conductor |
| 2 | SITC of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm with fitting |
| 3 | SITC of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm |
| 4 | SITC of 13 mtr long ST pole ( ST-410 SP56) |
| 5 | SITC of 11 Mtr ling ST Poles |
| 6 | Almonium Paint |
| 7 | Red oxide paint |
| 8 | SITC of G I Nuts and bolts |
| 9 | SITC of GI Chanel iron/ Angle iron / flat iron . |
| 10 | SITC of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm |
| 11 | Supply of Al. telescopic Leader folding each picec 20' long |
| 12 | SITC of ACSR 0.1 conductor |
| 13 | SITC of Anti climbing Device |
| 14 | SITC of Danger Plates |
| 15 | Supply of PP Rope |
| 16 | Supply of 0.2/0.1 ACSR Wire cutter (1 Each) |
| 17 | Cement bottming of 13 Mtr long ST Poles as per REC stnd 0.78 Cums/Pole |
| 18 | Cement bottming of 11 Mtr long ST Poles as per REC stnd 0.66 Cums/Pole |
| 19 | Cutting of big trees coming in close Vicinity of the line near Gofbal, Qaimoh and Zeyarat Sharif |
| 20 | Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth (To be paid as per actual at site during execution) |
| 21 | Extra for every addl lift of 1.5M All kinds of soil: |
| 22 | Filling of Available Earth |
| 23 | Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical) Thermo-MechanicallyT reated bars of grade Fe-500D or more. |
| 24 | Providing and laying in position cement concrete of specified grade including curing but excluding th cost of centring and shuttering.All workupto plinth level with: 1:3:6 (1cement:3coarse sand:6 graded stone aggregate 40mm nominal size) |
| 25 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks uptoplinthlevel (M25) |
| 26 | Centering and shuttering including strutting, propping etc.and removal of form work for: Foundations,footings,bases for columns |
| 27 | Providing and fixing of earthing including earth resistivity including counterpoise whereever required. |
| 28 | Carriage of material by Mechanical transport Aggegate 20mm (Av. Lead=20Km) |
| 29 | Carriage of material by Mechanical transport Aggegate 40mm (Av. Lead=20Km) |
| 30 | Carriage of material by Mechanical transport Sand (Av Lead=20Km) |
| 31 | Carriage of material by Mechanical transport Steel ( Av Lead 10 Km ) Please Enable Macros to View BoQ information |