|
| 1 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 2 | 200 SCMH MRS:Single Stream, Service Regulating Module Skid, Inlet Pressure - 1.5 to 5 bar (g), Outlet Pressure - 0.5 to 2 bar (g), Meter Size - G65 RPD. |
| 3 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 4 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 5 | 300 SCMH MRS:Single Stream, Service Regulating Module Skid, Inlet Pressure - 1.5 to 5 bar (g), Outlet Pressure - 0.5 to 2 bar (g), Meter Size - G100 RPD. |
| 6 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 7 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 8 | 500 SCMH MRS:Single Stream, Service Regulating Module Skid, Inlet Pressure - 1.5 to 5 bar (g), Outlet Pressure - 0.5 to 2 bar (g), Meter Size - G160 RPD. |
| 9 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 10 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 11 | 750 SCMH MRS:Twin Stream, Meter & Regulating Skid, Inlet Pressure - 1.5 to 5 bar (g), Outlet Pressure - 0.5 to 2 bar (g), Meter Size - G250 RPD. |
| 12 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 13 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 14 | 1250 SCMH MRS:Twin Stream, Meter & Regulating Skid, Inlet Pressure - 1.5 to 5 bar (g), Outlet Pressure - 0.5 to 2 bar (g), Meter Size - G400 RPD. |
| 15 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 16 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 17 | 3000 (300#) SCMH MRS:Twin Stream, Meter & Regulating Skid, Inlet Pressure - 10 to 32 bar (g), Outlet Pressure - 2 to 4 bar (g), Meter Size - G400 RPD. |
| 18 | Supervision during the installation, testing and commissioning of the above MRS at the site. |
| 19 | Design, Engineering, Fabrication, manufacturing/ packaging, Integration, Shop Testing, Supply, supervision during installation and commissioning of following Gas Custody transfer MRS as specified in bid document including packing, forwarding, insurance, handling, transportation and unloading at MNGL Stores / Site as per MR specifications and Special Instructions of MNGL. |
| 20 | 300 SCMH MRS:Single Stream, Meter & Regulating Skid, Inlet Pressure - 19 bar (g), Outlet Pressure - 10 bar (g), Meter Size - G25 RPD. |
| 21 | Supervision during the installation, testing and commissioning of the above MRS at the site. Please Enable Macros to View BoQ information |