| 1 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 2 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 3 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 4 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 5 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25+ 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 6 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 7 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 8 | Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 9 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 10 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 11 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 12 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. |
| 13 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 14 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 15 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 16 | Erection of suspension clamp for LT ABC of any size |
| 17 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 18 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 19 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 20 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. Please Enable Macros to View BoQ information |