|
| 1 | Cartage of Pantoon by Truck/Tailor from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site including loading unloading with the help of crane, labour, T&P etc complete. as per direction of E/I excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 2 | Cartage of Railing post from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 3 | Cartage of R.S. Joist 5.20 mtr long from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 4 | Cartage of manhole cover from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 5 | Cartage of chequerred plate from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 6 | Cartage of iron anchor from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 7 | Cartage of sal sliper / Sal edging from Prayagraj (Allahabad) ghat site to Mudiyari Chaura ghat site (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes |
| 8 | Local shifting of Pantoon within 500m with the help of crain excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 9 | Dragging the Pantoon pair from dry bed to the river water and making pair and anchoring them in the down stream side of Pantoon bridge excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes . |
| 10 | During carring the pantoon pair from place of anchoring (D/s side bridge) in water and to cross the dry bed/ shailow water on the way up to the aling ment disconnecting the pantoon pair and rolling the pantoon and fixing the alingment after excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 11 | Carrying of Pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other Pantoon pair and refixing the same in bridge alignment. excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 12 | Sinking of Pantoons to obtain the proper gradient as laid in dry bed /shallow water in the alignment of Pantoon bridge as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 13 | Shifting of Pantoon by Tailor from unlaoding place to Prayagraj (Allahabad) ghat site to Chaura ghat site including disconnecting the pantoon lying in dry bed / shallow water, rolling and haulage up to river bank with the help of crane labour T&P etc complete. as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 14 | Carriage and laying of spliced R.S. joist (5.25m long) including loading, unloading and cost of carriage from store to baluigada ghat ghat as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 15 | Carriage,laying and relaying of chequared plate including loading, unloading and cost of carriage from store tobaluigada store as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 16 | Fixing of railing wire through hole of railing post and hole of vertical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (labour only) excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 17 | cartege fixing of Railing post excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 18 | Cartage of man hole cover and fitting on Pantoon excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 19 | Two coat painting of railing post including paint and labour etc.excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 20 | Carriage and laying of sal sleeper including loading, unloading and cost of carriage from store to baluigada store as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 21 | Carriage and laying of sal edging including loading, unloading and cost of carriage from store to Dhuwaha ghat as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 22 | carrying and spreading of kansa poola 5 cm thick carrige road way before filling of 7.50 cm thick kapsa soil including carrige of kapsa soil from distance of 1 km on the side of bridge spreading ramming and dressing the surface as per direction of E/I excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 23 | Maintenance of Pantoon bridge excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 24 | Maintenance of two row chequerred plate road excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 25 | Supply of materialsSupply of Nylone rope of Garware brand of 28mm dia including cost of material cartage up to site and also including all taxes (as per s/o No 417 dt. 13.10.08 as approved by S.E. Gorakhpur circle) excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 26 | Supply of ordinary Nylone rope of Garware brand of 32mm dia including cost of material cartage up to site and also including all taxes (as per s/o No 420 dt. 13.10.08 as approved by S.E. Gorakhpur circle) excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 27 | Supply of plastic empty cement bags of good quality excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 28 | In empty cement bags of good condition (plastic) filed with local sand including filling stitching, stacking at site of work excluding G.S.T.excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 29 | Supply of Narial Rope excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 30 | Supply of Calcutta Sutli excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 31 | Supply of begai badh excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 32 | Supply of M.S. Washer of 30 mm x 20 mm excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 33 | Supply of Nat Bolt 30 x 300 mm size excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 34 | Supply of Nat Bolt 30 x 150 mm size excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 35 | Supply of Nat Bolt 16 x 300 mm size excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 36 | Supply of U-clamp with nut cartage & all local taxes included excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 37 | Supply of Mallahi Nail of 15 cm to 30 cm long excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 38 | Supply of eucliptus balli 150 mm dia excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 39 | Supply of eucliptus balli 100 mm dia excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 40 | Supply of eucliptus balli 120 mm dia excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 41 | Supply and fixing of wooden crate (With sand filled bag) of wooden crate of equiliptus ballies 2.80 x 1.80 x 1.80 m size made of 8 cum ballie including cost of labour, T & P and material excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 42 | Supply of 12mm dia wire rope including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 43 | Supply of 20mm dia wire rope including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 44 | Supply of large bamboo of 7.50 cm dia including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 45 | Supply of large bamboo of 5.00 cm dia including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 46 | Supply of railing wire clamp including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 47 | Supply of wire nail including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 48 | Supply of sign board of size 4' x 3' including cartage and all local taxes etc. complete excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 49 | Lettering and painting of sign board of size 4' x 3' excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 50 | Making bariar on both side of Pantoon bridge with ballies (labour only) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 51 | Bundaling with the help of 10cm horizontal ballies and 15cm vertical ballies @ 50cm C/C ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bag up to 30cm above excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 52 | S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & Weaving Packing avarage 90 Sand Filled cement bag & also Including anchoring with PP rope (1.5 inch dia) all matrial labour T&P etc. required for (u/s) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 53 | supply and Clamping of chequred with U-clamps excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 54 | Cartage of wooden anchor from store to bridge head including loading, unloading and cost of carriage from store and placing on the as per direction of E/I excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 55 | Making stay on both side of Pantoon bridge with the help of 20mm /10mm wire rope (labour only) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 56 | Hire charges of boat with mallah with large boat excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 57 | Watch and ward of materials at Dhuwaha ghat (Chaukaidar) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 58 | Earth work in embankment by carted earth (Loam,Clay or sand) excavation to be in the form of pit not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers, including the ramming & dressing the surface to required levels and slops and also including 1.50 meter lift and 30meter lead. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as direction by the E/I excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 59 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of brick filling joibts with local earth spreading a blinding coat of 1cm. (3/8\\") depth of local earth of P.I.5 to 7 or sand over the entire surface & including labour, T & P etc. required for proper completion of the work.as per S.I. no. 762B excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 60 | Painting with two coats loccolite black paint of M/s British Paint on old iron work including sand papering, rubbing and cleaning the surface and supply of labour and tools and plants required for the proper completion of the work. as per S.I. No. 641+642 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 61 | Supply and laying of local sand including cost of material, loading, unloading and its cartage up to site of work excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 62 | Fixing of Khunta etc. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 63 | Dismantling of Pantoon bridgeCartege of pantoon by truck/trailor after dismantalling from bridge site to store including disconnecting the pantoon laying in dry bed /shallow water rolling and haulage up to river bank. Loading unloading with the help of crane labour etc. excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 64 | Opening of 'U' clamps from chequered plate excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 65 | Extraction of hard steel railing wire of 10mm dia (as per Allahabad Schedule no 4/6d) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 66 | Taking out of Euclipts ballies from approach (as per Allahabad Schedule no 4/6d) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 67 | Dismantling and carriage of sal edges (as per Allahabad Schedule no 6/6d) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 68 | Dismantling and carriage of sal sleepers (as per Allahabad Schedule no 7/6d excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 69 | Dismantling and carriage of Railing post (as per Allahabad Schedule no 5/6d) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 70 | Dismantling and carriage of R.S. Joist (as per Allahabad Schedule no 8/6d excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 71 | Carriage of different material like nails, ropes, nuts and bolts etc from bridge head to store include loading, unloading and carriage as per direction of E/I excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 72 | Carriage of Pantoon from bridge from bridge alignment to the place of anchoring in D/S side of Bridge including dismantling the same in to pairs (as per Allahabad Schedule no 3/6) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 73 | Anchoring of Pantoon pairs at Dhuwaha ghat side in D/S dide of river (as per Allahabad Schedule no 3/6) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 74 | Dismantling and carriage of chequered plates from bridge deck and approach road (as per Allahabad Schedule no 2/6d) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 75 | Opening out man hole covers including loading, unloading cartage and duly stacked in store excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 76 | Construction of Collection RoomExcavation of Foundation in ordinary soil (Ioam clay or sand) including lift upto 1.50 meter and lead up 30meter and including filling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches.as per S.I. No. 251 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 77 | Concrete with 4.0 cm gauge brick ballast, fine sand of 1.25FM and cement in the proportion of 12:6:1 in fuondation and under floors including supply of all materials, labour and tools and plants etc. required for the proper completion of the work .as per S.I. No. 273 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 78 | Class 150 Sub class 'A' brick work in 1:6 cement and fine sand of 1:25 finencess modulous mortae in foundation and plinth, including supply of all materials labour and T & P etc. required for the proper completion of the work. as per S.I. No. 303 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 79 | 2.0cm. Thick damp proof course with cement and approced coarse sand Mortar in the proportion of 1:2 with and including water proofing materials as ordered by the Engineer incharge and in the proportion as specified by the manufacturers including supply of all materials labour and tools and plants etc. required for the proper completion of work and also including proper curing and shuttering as necessary.SI No. 360 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 80 | Same as in item (30 to 308) above but in super structure and including necessary cutting and moulding of brick as required and including honey comb brick work in cluding supply and errection of necessary scaffolds etc.and thickness of walls not less than 1.50 brickss (add to item 302 to 308 above). as per S.I. No. 309 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 81 | Mild steel or iron work of heavy sizes such as trusses built up gates, door frames record racks, roof work, gates etc. wrought to required from including drilling holes. Revetting and / or welding where necessary and also including supply of steel bolts and nuts, wastate etc. and their fixing and all labours Toola and plants required for proper completion of the work.as per S.I. NO. 503(b) excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 82 | M 15 class R.C.C. work with cement, approved coarse sand 2.0cm gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows etc and bed plates, excluding the supply of reinforcement and its bending but including its bending the same with 24 BWG, GI bending wire and including wire as also including providing and fixing necessary centering and shuttering and its removal after completion of work & supply of all other materials labour and tools and plants etc. required for the proper completion of the work. (Labour rate including cost of centering & shuttering) As per s.i. no. 283 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 83 | Laying reinforcde brick slabs with and including supply of first class brick (class 150 A brick) laid in cement mortar consisting for one part of cement and three part of approved coarse sand excluding supply of reinfor cement and its bending but including its fixing in position and binding the same with 24 BWG, GI binding wire and including the necessary centering and shuttering required and curing etc. and supply of all materials labour and tools and plants etc. required for proper completion of the work.as per SI no. 535 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 84 | Mild steel or iorn work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all ratea) wrought to required shapes as necessary and bending for the proper coppletion of the work and including supply of steel and its wastage etc. and all labour and tools and plants required for proper completion of work Note: the steel shall be bent cold and bends hooks and authorised over lapping shall be measured. as per S.I. NO. 504 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 85 | Supply & fixing Fan hooks made of M.S. bar 16mm dia and at least 450mm. Long of U shape with the legs having 10cm. clear distance and supply of all steel labour and tools & plants etc. required for proper completion of the work as directed by the Engineer in charge. as per NSI no. 8 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 86 | Sand filling in plinth including supply of neccessary quantity of sand including watering and supply of all labour T&P etc. required for proper completion of work. as per SI No- 255 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 87 | Brick on edge floor with class 150sub class A bricks laid dry and joints filled with local sand and including the preparation of base to proper slope and its ramming including supply of all materials labours and tools and plant required for the proper completion of the work. as per S.I. No. 615 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 88 | 12mm thick plaster with cement and approved coarse sand mortar 1:3 on brick work (minimum thickness not less then10mm) including raking the joints washing and cleaning and supply of all material labour and tools and plants etc. required for the proper completion of the work. as per S.I. No. 583 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 89 | 12mm thick plaster with cement and approved coarse sand mortar 1:3 with neat cement coat and with water profing compoud on top of roof (minimum thickness not less then10mm) including raking the joints washing and cleaning and supply of all material labour and tools and plants etc. required for the proper completion of the work. as per S.I. No. 583a+599 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 90 | Supply and fixing 45mm. Thick country wood door and window, shutters braced and batth including fixing and adjustment of all cleats and stops and including fixing and adjustmentof all hinges bolts, locks, handles,springs and/or other fittings but excluding their supply and painting with two coats of black JAPAN on all iron fittings if necessary and supply of all materials labour and tools & plants etc. required for the proper completion of the work. as per S.I. No. 461 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 91 | Aproximate cost of iron fitting with iron hinges as per S.I. No. 472a excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 92 | Planting or Varnishing new iron work in small areas or new wood work with two coat of ready mixed primming paint and one coat of approved superior quality read mixed enamel paint or Varnish including sand papering, rubbing and cleaning the surface and supply of all materials labour and tools and plants required for the proper completion of the work. ( The paint to be used should confirn to I.S.I. 103-1950). as per S.I. No. 641a+642b excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. |
| 93 | colour washing 3coat on new surface as per S.I. 674+675 excluding G.S.T. but includes all taxes, lavies, labour cess T&P etc and other taxes. Please Enable Macros to View BoQ information |