| 1 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 |
| 2 | P/L PCC 1:6:12 cement, Fine Sand and brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 |
| 3 | First class 150 brick work in 1:4 cement:C.sand mortar in foundation including supply of all materials labour T&P etc required for proper completion of the work... all compt. As per SI no. 305(b) |
| 4 | RCC 1:1.5:3 in cement, C. Sand and 20mm stone grit in RCC Slab. All complete as per SI no. 284 B |
| 5 | First class 150 brick work in 1:4 cement:C.sand mortar all compt. As per SI no. 305(b) boundry wall |
| 6 | M.S. iron in plain work such as reinforced concrete or reinforced brick work worought to required shape as necessary including bendin for proper completion of work including supply of all steel and over laping and hook all compt. As per SI no. 504 |
| 7 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 |
| 8 | Providing and applying whice cement based putty of avrage thickness 1 mm of approved brand and manufature over the plastered wall surface toperage the surface even and smooth complet. As per SI no. DSR 13.8 |
| 9 | Finishing wall with primium acrylic smooth exterior paint with silicone addilives of required shade new work (two or more coats applied all compt. As per DSR 13.47.1 |
| 10 | M.S. or iron work in heavy sizes such as trusses builts up gates boor frames roof work etc including drilling holes rivitting or welding where necessary … all complete as per SI no. 503 for main gate. |
| 11 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 |
| 12 | P/L PCC 1:6:12 cement, Fine Sand and brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 |
| 13 | First class 150 brick work in 1:4 cement:C.sand mortar in foundation including supply of all materials labour T&P etc required for proper completion of the work... all compt. As per SI no. 305(b) |
| 14 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 |
| 15 | Construction of Granular sub base by provinding well grades material, spreading inuniform layers with morter grader on prepared surface, mixing by mix in place method with rotavator at OMC.. All compt. As per Clause 401. |
| 16 | P/L rubbermoulded reflective Zig-Zag 80mm providing and laying of interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504 SI no. 6.7 |
| 17 | P/L CC 1:2:4 in cement, C. Sand and 20mm stone grit and including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 279(b) |
| 18 | P/L of rectified ceramic floor tiles of size 600x600 mm laid over cement mortar 20 mm thick .. All complete as per DSR 11.41.2 (fursh) |
| 19 | P/L of rectified ceramic wall tiles in skirting rises of steps and dados, over 12 mm thick bed of cement mortar 1:3 in Cement, C.sand ... All complete as per DSR 8.31 |
| 20 | P/F of SS 304 railling made of hallow tube channels plates etc including welding grinding etc all complete as per DSR no. 10.28 |
| 21 | Supply and fixing of sign board at site. Please Enable Macros to View BoQ information |