| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 6 | Erection of suspension clamp/dead end clamp for 11 kV ABC of any size |
| 7 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 8 | Erection of Anchor clamp for 11 kV ABC of any size |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 11 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing |
| 12 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 13 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the grounf for earthing excluding provision for earthing |
| 14 | Drilling hole of various sizes on existing Channel/Cross arm |
| 15 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 16 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 17 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 18 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 19 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 20 | Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 21 | Steel work for purlin/single section with GI pipes including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer including welding and bolted with special shaped washers etc complete |
| 22 | Painting 'A' pole structure with one coatSynchromate primer and two coat greyenamel paint/aluminium paint including cost of paint. |
| 23 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of LT pole |
| 24 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 25 | Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators,binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 26 | Dismantling (without damage) one km LTthree phase 4 wire OH line conductor bydismantling cross arms, insulators andstacking the conductors in rolls properly |
| 27 | Fitting one MVT on existing cross arm excluding termination work (for one phase) of any rating for 11 kV AB Cable |
| 28 | Dismantling one section fuse from distribution box and bringing back to section store. |
| 29 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 30 | Dismantling (without damage) one km LTadditional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 31 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc and stacking the same |
| 32 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 33 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store |
| 34 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store |
| 35 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed .Pole numbers shall be painted in circular/rectangular background using approved quality anti algal yellow paint in two coat after scrapping and cleaning the surface at a height of 2.5 metre above ground level.The number and letters should be in black synthetic enamel.The size of the number should be atleast 2 cm in height x 1.5 cm in width incl cost of paint |
| 36 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 37 | Stringing of 11 kV aerial bunched cable of size 3 x 150 +1 x 120 sqmm with bare/insulated messenger through existing poles |
| 38 | Stringing ,shackling,fitting cross arms,insulators and binding,giving jumper connection etc using ACSR Rabbit for phase and ACSR weasel for Neutral & Street main for one km LT 3 ph 5 wire line including cutting and removing tree branches whereever necessary and conveyance of all materials (except poles) from stacking place |
| 39 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers |
| 40 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all othersafety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 41 | Fitting one set (3No.) 11kV LA and givingconnections excluding earthing |
| 42 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work siteand laying it carefully using cable rollers,taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top withbricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling |
| 43 | Stringing of one km 11kV line with ACSRRaccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works |
| 44 | Fitting one additional Fuse unit and givingconnection from Transformer to fuse andDistribution box to LT OH line. Please Enable Macros to View BoQ information |