| 1 | Transporting transformers by hired vehicle to a distance upto 5 km and carrying upto 2 numbers of 63/100/160/250 kVA Transformers/Ring Main Units excluding loading and unloading charges |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia 2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m)at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Drilling holes of various sizes on existing Channel/cross arm |
| 6 | Fitting 6 channel cross arms, AB switch,DO fuse,Station class LA,HT & LT connections upto OH lines etc on existing DP structure,Fixing distribution box/provision for one set (3 No) of LT fuses,drawing sufficient lemgth of GI earthing leadsto the groubd for earthing excluding provision for earthing and mounting of transformer on poles |
| 7 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 8 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 9 | Fitting and erecting one HT Double Pole structure using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to ground for earthing (excluding provision of earthing) |
| 10 | Fitting one additional V cross arm in existing single pole including conveyance of materials |
| 11 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 12 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 13 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 14 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision of earthing |
| 15 | Stringing of one km 11 kV line with ACSR Racoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works |
| 16 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 17 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 18 | Providing transformer fencing using steel work using 40 mm Dia GI pipes for verticals & outer frame of gate,providing gate with locking arrangements with two horizondal bracings using 40 x 6 mm MS flat & grills with MS rods 8 mm Dia @ 10 cm c/c for verticals for the gate providing danger board & name board,fixing in position ,concreting the base with 1:2:4 CC ,applying one coat of zinc chromate primer and two coats of aluminium paint for fencing post and gate frame ,providing fencing with 4mm GI chain linkfixed to GI post,as per detailed specifications including all charges |
| 19 | Cleaning and levelling of transformer yard /RMU spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick6 mm broken stone after constructing a curb wall of height 20 cm above groung and 10 cm below level including the cost of all materials and chargesfor coveying , spreading, consolidating etc |
| 20 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding etc complete |
| 21 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding etc complete |
| 22 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 23 | Fitting and erecting one HT PSC single pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 24 | Fitting and erecting one HT A type single pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision for earthing) |
| 25 | Erecting one 100 kVA Transformer to existing DP and giving connections including loading from TMR/SRS/other atacking places & unloading at site excluding cost of transformer |
| 26 | Object marking (traffic signal painting) in one HT,LT,HT/LT pole for a height of 1.5m from groundlevel using approved quality primer one coat and two coats anti algal black and fluroscent white paint in alternate rings of 25 cm width including cost of paints |
| 27 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed .Pole numbers shall be painted in circular/rectangular background using approved quality anti algal yellow paint in two coat after scrapping and cleaning the surface at a height of 2.5m above ground level.The number and letters should be in black synthetic enamel paint.The size of the number should be atleast 2 cm in height x 1.5 cm in width including cost of paint |
| 28 | Fitting one No Section fuse with dropping cables ,crimping sockets,connecting with bolt & nut etc |
| 29 | Fitting one additional fuse unit and giving connection from transformer to fuse and Distribution box to LT OH line Please Enable Macros to View BoQ information |