| 1 | PAVER ROAD |
| 2 | Earth work in excavation in Road cutting filling & leveling of surface |
| 3 | Providing and laying factory made chamfered edge Cement Concretepaver blocks in footpath, parks, lawns, drive ways or light trafficparking etc, of required strength, thickness & size/ shape, made bytable vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sandbedding layer through vibratory compaction by using plate vibrator,filling the joints with sand and cutting of paver blocks as per requiredsize and pattern, finishing and sweeping extra sand. complete all asper direction of Engineer-in-Charge. Providing and laying factory made chamfered edge Cement Concretepaver blocks 80 mm thick in footpath, parks, lawns, drive ways or light trafficparking etc, of required strength, thickness & size/ shape, made bytable vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sandbedding layer through vibratory compaction by using plate vibrator,filling the joints with sand and cutting of paver blocks as per requiredsize and pattern, finishing and sweeping extra sand. complete all asper direction of Engineer-in-Charge. |
| 4 | Earth work in excavation in foundation in kankar and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge into a distance pickaxes, subbals etc. |
| 5 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. |
| 6 | Concrete with 4cm(1½\\") gauge stone ballast, coarse sand of 1.25 Fineness modulous and cement in propotion of 8:4:1 in foundations and under floors, including supply of all materials, labour and T&P etc. Required for proper completion |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 8 | 1:2:4 (1 cement : 2 coarse sand (zone-ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | 12 mm cement plaster finished with a floating coat of neat cement of mix : |
| 10 | Supply and filling cartage of STONE DUST in Blanket coat 10 cm thick making sub base including ramming watering etc. |
| 11 | Providing and Laying WBM G-3 at site including loading unloading cartage etc as per Direction of Er. Incharge |
| 12 | Providing and filling moorum to making surface level |
| 13 | Providing and fixing Sign Board and photography of work detail Please Enable Macros to View BoQ information |