| 1 | Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect |
| 2 | Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect |
| 3 | Cement concrete mix (1:4:8) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm |
| 4 | R.R. stone Masonry (using R. R. stones where stones to be not less than 15 cm in size in any direction) for foundation including all leads of all construction materials including curing etc. complete in 1: 6 Cement Mortar |
| 5 | 50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20mm, |
| 6 | 25 mm thick cement plaster on wall with 1:4 ratio with joint scraping and regular leveling for 14 days(BHANIYANA BSR RD&PR 2023-24) |
| 7 | Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio. |
| 8 | P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span |
| 9 | Leveling the excavated soil, in the Catchment area and pouring water and ramming with a rammer. |
| 10 | Unpolished rough kota stone/jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped. |
| 11 | लोहे की जाली (ग्रेटिंग) 125 मिमी व्यास की आपूर्ति करना तथा लगाना। |
| 12 | Supply and laying of HDPE Geomembrane 500 micron,excluding GST (Horticulture letter 4065-4144 Date 05.01.2022) |
| 13 | Laying, welding & testing of 1mm HDPE Liner (WRD BSR CH-V ITEM NO 45) |
| 14 | Supply and fixing of 150cm height angle iron posts 35*35*5 mm placed in every 3meter a part 30cm in ground embedded in CC 1:3:6. Corner and every tenth post to be strutted with angle iron provided and fixed and fitted with posts including earth work in excavation etc. with 4 line of barbed wire staple with GI wire. |
| 15 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. |
| 16 | Dakkan GI SHEET |
| 17 | PVC Pipe |
| 18 | Sign Board Granite |
| 19 | Gate and Yojna Disply Board of work details Please Enable Macros to View BoQ information |