| 1 | STP (SEWAGE TREATMENT PLANT): 3.00 MLD: Design, construction, erection, testing and commissioning of 3.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) including Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS and other works contingent thereto including 3 months successful trial-run and thereafter 6 Years Defect Liability-cum-Maintenance Period as per detail and specifications mentioned in DNIT along with following provisions1.1 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories, cable, wire etc complete in all respect. 1.2 Supply and fixing of 1 No. 3.65 m wide SS 304 main Gate along with1.25 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge. (Total weight not less than 500 kg).1.3 CC TV CAMERAS: Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Camera at MPS-1) within 96 hours of signing the agreement along with 120 days recording (DVR), 48 inch LED Screen, 16 Channel DVR at STP and MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at MPS and STP shall be synchronized at STP site complete in all respect.PTZ speed dome 360 degree 50X zoom camera, CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode, IR range up to 150 m. CCTV Cameras should be installed and commissioned before starting of the work.Make: Sony / Canon / Panasonic / Samsung1.4 EWQMS (Effluent water quality monitoring system): Supply, Installation, Testing, Commissioning, Operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 3.00 MLD capacity STP for online (continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data to CPCB, HSPCB and PHED, TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents.1.4.1 Multi-parameter measuring converter, for connecting up to 18 intelligent sensors Scope including 8 analog inputs / outputs (4 inputs and 4 outputs) (0/4-20Ma), wide- range power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the outlet / effluent of 3.00 MLD capacity STP with integrated with automatic cleaning complete in all respect.1.4.2 Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum) complete in all respect.1.4.3 Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to the intelligent Sensor Net system. Cable length 100 meter (minimum) complete in all respect.1.4.4 Data transfer to CPCB, HSPCB and PHED servers complete in all respect.1.4.5 Providing GSM 3G, 4G modem with mobile network connectivity including network including complete in all respect.`1.5 Providing and installation of online flow measurement at inlet , outlet and byepass including suitable size flow meter complete in all respect`1.6 Conveyance of treated effluent from cholorine contact tank to effluent collection tank through suitable size DI K9 pipe along with cost of pipe, sluice valves, specials, material and labour complete in all respect. |
| 2 | ANNEXE BUILDING: Construction of HT / LT Panel room, PLC room, Blower room and Lab cum Office building, Toilet block including doors, windows,finishing, electric, and sanitary fittings complete in all respect as per drawings approved by SE. The building will be built up with RCC frame structure and brick work as per specifications mentioned in attached additional documents including maintenance during 6 years Defect liability-cum-maintenance period after successful completion of trial run period of 3 months. |
| 3 | Supply and Pushing of MS casing pipe of specified thickness by trenchless method adopting micro-tunnelling or any suitable mechanical technology or technology approved by Railway below ground at all depth under running traffic condition as per railway standard including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water and sanitary lines and resistivity test for finding the soil strata using necessary equipment’s for completion of works, mobilizing of machineries and specialized crew at the job site complete in all respect, including excavation of driven pit and exit pit (upto 3 metre depth) with proper protection at three sites with shoring sheets and ISMB`s. Providing MS cutting edges for front shield and Constructing thrust bed at designated level. Necessary de-watering and providing concrete foundation at the base of the driven pit, PVC/Rubber saddle as per the requirement of Railway Authority, crane for handing of pipe and any other machinery, tools, and tackles required, construction of temporary works as per requirement and as per approved by railway authorities, specification and the direction of the Engineer. (Protective coating/ lining if done that will be paid extra) Note- 1. Manual Pipe jacking is not permitted for workmen safety reasons. 2. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable700 mm dia 12 mm thick casing pipe (As per SOR (RUIDP) item no. 17.87.1.2) |
| 4 | `HT Metering Panel: Supply Indoor Type 11KV VCB Control Cubical Panel with vertical Isolation Type Breaker as per Relevant IS as amended up to Date and Additional Specifications, having Capacities as Mentioned Below, Single break trip free mechanism, manually charged and Auto/Manually closing breaker suitable for use on 11kv, 3 phase 50hz AC, Supply with short circuit fault level of 500 Amps Capacity, breaker featured with local ON/OFF indicator with hand trip device, spring release coil, shunt trip coil and auxiliary switch of 2NO plus 2NC and equipped with following switchgears and accessories including making suitable structure arrangement for installation, control wiring and connections etc. as reqd. (1 IC plus 2 OG)a). VCB, 11KV, 630Amp, 50KA.b). 1ph 11KV/110 Volts PT (indoor type) Class 0.2 Accuracy and 100 VA burden -3 no’s.c). 33KV indoor dead type dual core dual ratio 3CTs of ratio 200-100/5-5 A of 15 VA burden, PS 5 P10 and accuracy class 0.2.d). Control panel- Cubicle type control panel suitable for floor mounting made out of 1.63 mm CR sheet duly powder coated and with following relays.e). Microprocessor based numerical relay for O/L, E/F and SC Protection suitable for above.f). Master trip relay -2 no’s.g). Indicator type Annunciator panel with buzzer.h). Digital Volt Meter- 0-11 KV.i). Digital Amp Meter- 0-100 Amp.j). RYB/ Trip/Closing/Spring charged indicator lamp.k). Fault Annunciator panel for O/L, WTI, OTI and Buchhloz Relay Alarm And Trip Auxiliary relay.l). TNC Switch for Operation.m). Multifunction Meter EM6400NG.n). TCS Relay for Safe` |
| 5 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site. 400 mm nominal diameter |
| 6 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site. 250 mm nominal diameter |
| 7 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make: Indian Cables Ltd./ Finolex / Havells / Polycab / RR Cables. (50 Sqmm size) |
| 8 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make: Indian Cables Ltd./ Finolex / Havells / Polycab / RR Cables. (95 Sqmm size) |
| 9 | Providing and laying Double Flanged (Screwed/ Welded) Centrifugally (Spun) cast Iron, class B (IS 1536) complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion etc up to the site of work.350 mm nominal diameter |
| 10 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site. 300 mm nominal diameter |
| 11 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site. 350 mm nominal diameter |
| 12 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site. 600 mm nominal diameter |
| 13 | `NON CLOG SEWAGE PUMP: Supplying, erection, testing and commissioning of Submersible motor pumping set non clog for sewerage having head below mentioned as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked.` 9900 LPM x 20 Mtr. Head |
| 14 | Design, Supply, installation and testing of VFD along with distribution panel in enclosure for non clog sewage submersible pump motor rating of 40 HP Compatible to work with cable length of 100 meters. Enclosure shall be IP54. The panel shall be equipped with MCCB TP with suitable rating, Spreader link TP, Extended rotary handle, Volt meter digital, Volt selector switch, Amp meter, Amp selector switch, C.T with suitable rating, Control MCB SP with suitable rating, PLA Relay, Pushbutton red plus green with element, Indicator ON/Off, Aluminium Bus bar/suitable rating power and Control wiring labour and margin, Fabrication with minimum Sheet thickness of 2 mm for load bearing and non-load bearing side. VFD should be capable of protecting motor from high and low voltage and earth fault as well. VFD should restrict harmonics up to 35% VFD should be capable of providing starting torque up to 200% while starting motor. It should have class 3C3 (Avg)conformal coating so that components are safe from dust and moisture. Communication -Built-in RS485 Modbus RTU, Ambient Temperature -Heavy Duty: -10 ~ 50 deg C Normal Duty: -10 ~ 40 deg C, PCB Protection Conformal Coating complying to IEC 60721-3-3 class 3C3, Application Humidity Below relative humidity 95% RH (no condensation) Altitude 0 to 1,000 m Without deration 1,001 to 4,000 m With deration of 1% per rise in 100 m, Vibration Up to 9.8 m/sec2 (1.0 G), Global Compliance CE, UL, RoHS, Control Method V/F Control, Sensorless Vector Control, Slip Compensation, Closed Loop Vector Control. Starting Torque 200% at 0.5Hz in Sensorless Vector Control and 150% at 3Hz in V/F, Frequency Control Range 0 to 400Hz in V/F, 0 to 300Hz in Sensorless 1, 0 to 120Hz in Sensorless 2 / Vector, Frequency Precision Setting- Digital: 0.01Hz, Analog: 0.03Hz (60Hz Base). complete with all other accessories as required. |
| 15 | Design, Supply, installation and testing of VFD along with distribution panel in enclosure for non clog sewage submersible pump motor rating of 75 HP Compatible to work with cable length of 100 meters. Enclosure shall be IP54. The panel shall be equipped with MCCB TP with suitable rating, Spreader link TP, Extended rotary handle, Volt meter digital, Volt selector switch, Amp meter, Amp selector switch, C.T with suitable rating, Control MCB SP with suitable rating, PLA Relay, Pushbutton red plus green with element, Indicator ON/Off, Aluminium Bus bar/suitable rating power and Control wiring labour and margin, Fabrication with minimum Sheet thickness of 2 mm for load bearing and non-load bearing side. VFD should be capable of protecting motor from high and low voltage and earth fault as well. VFD should restrict harmonics up to 35% VFD should be capable of providing starting torque up to 200% while starting motor. It should have class 3C3 (Avg)conformal coating so that components are safe from dust and moisture. Communication -Built-in RS485 Modbus RTU, Ambient Temperature -Heavy Duty: -10 ~ 50 deg C Normal Duty: -10 ~ 40 deg C, PCB Protection Conformal Coating complying to IEC 60721-3-3 class 3C3, Application Humidity Below relative humidity 95% RH (no condensation) Altitude 0 to 1,000 m Without deration 1,001 to 4,000 m With deration of 1% per rise in 100 m, Vibration Up to 9.8 m/sec2 (1.0 G), Global Compliance CE, UL, RoHS, Control Method V/F Control, Sensorless Vector Control, Slip Compensation, Closed Loop Vector Control. Starting Torque 200% at 0.5Hz in Sensorless Vector Control and 150% at 3Hz in V/F, Frequency Control Range 0 to 400Hz in V/F, 0 to 300Hz in Sensorless 1, 0 to 120Hz in Sensorless 2 / Vector, Frequency Precision Setting- Digital: 0.01Hz, Analog: 0.03Hz (60Hz Base). complete with all other accessories as required. |
| 16 | Supply and Pushing of MS casing pipe of specified thickness by trenchless method adopting micro-tunnelling or any suitable mechanical technology or technology approved by Railway below ground at all depth under running traffic condition as per railway standard including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water and sanitary lines and resistivity test for finding the soil strata using necessary equipment’s for completion of works, mobilizing of machineries and specialized crew at the job site complete in all respect, including excavation of driven pit and exit pit (upto 3 metre depth) with proper protection at three sites with shoring sheets and ISMB`s. Providing MS cutting edges for front shield and Constructing thrust bed at designated level. Necessary de-watering and providing concrete foundation at the base of the driven pit, PVC/Rubber saddle as per the requirement of Railway Authority, crane for handing of pipe and any other machinery, tools, and tackles required, construction of temporary works as per requirement and as per approved by railway authorities, specification and the direction of the Engineer. (Protective coating/ lining if done that will be paid extra) Note- 1. Manual Pipe jacking is not permitted for workmen safety reasons. 2. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.1000 mm dia 14 mm thick casing pipe (As per SOR (RUIDP) item no. 17.87.1.5) |
| 17 | MPS (MAIN PUMPING STATION): Design, construction and commissioning of MPS for 3.00 MLD average flow with peak factor 3 including RCC Inlet chamber, screening chamber, wet well sump complete in all respect other works contingent thereto including 3 months successful trial-run and thereafter 6 Years Defect Liability-cum-Maintenance Period as per detail and specifications mentioned in DNIT along with following provisions1.1 Providing, fixing and commissioning of 5 non clog sewage submersible pumping sets as per IS marked ie. 1 of 4200, 2 of 1400 and 2 of 700 LPM having minimum head of 15 m along with making all arrangement including sluice valves, Non return valves, specials, flanged individual and common delivery pipes, suitable size LT panel boards and suitable size cable from LT panel to pumps, all safety devices, automatic capacitor bank, complete in all respect as per specification mentioned in attached additional documents. 1.2 Suitable size (as per design) K9 DI pipe at MPS for interconnecting the structures including welding and screwing of flanges, ISI marked D.I. fittings, sluice valves, non returning valves as per requirements even for bye-pass arrangements complete in all respect 1.3 Suitable size (as per design and requirement) Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) for screens and partition of tank as per design.1.4 Supply and installation of 1 mechanical and 1 manual coarse screen (SS 304) suitable for 3.00 MLD average flow with peak factor of 3.0 complete in all respect.1.5 Conveyance of raw sewage from MPS to inlet chamber of STP through suitable size (as per design) DI pipe along with cost of DI pipe, sluice valves, specials, material and labour complete in all respect.1.6 All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility.1.7 Raw sewage will be available near boundary wall within the premises of proposed MPS but the conveyance of sewage from this terminal point to the inlet chamber of MPS through DI K9 pipe of suitable diameter as per design is included in the Turnkey contract. The Level of the MPS / STP will be as per bed level of existing incoming sewer at MPS. |
| 18 | Providing and Laying of Sewer and Storm Water Line in Bishan Swaroop Colony including restoration of damaged Streets/Roads and construction of 3.00 MLD Sewerage Treatment Plant (CM Announcement Code No. 27802 dated 07.07.2024) “Design, construction, testing and commissioning of 3.00 MLD Sewage Treatment Plant and MPS on SBR Technology and all other works contingent thereto including 3 months successful trial-run and thereafter 6 Years Defect Liability-cum-Maintenance Period. Laying the Sewage and storm water pipe line network and all other works contingent thereto including 3 months trial-run and thereafter 3 Years Defect Liability Period. Laying the water supply pipe line and all other works contingent thereto including 3 months successful trial-run and 1 Years Defect Liability Period.” Please Enable Macros to View BoQ information |