|
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Fazilka Canal & ground water Division, WRD Punjab, Ferozepur. Name of Work: Estimate for Raising of Main Branch from RD 0-18700 for Supplying reverse flow from Balewala Head to Luther Head i/c Raising of Mechanical Structure to increase Opening of Gates at Luther Head Contract No: 01632 292604 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SRNo. Item Description Item Code / Make Aprox. Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Clearance of weed, jalla, deela etc manually from inner section of unlined channel Heavy Type discharge exceeding 2.83 cumecs (CSR item no. 25.1 -c/iv) |
| 3 | Jungle clearance on running canals and branches, and drains with discharge more than 9 cum/s. Heavy Type (CSR item no. 26.25) |
| 4 | Filling cement bags with sand sewing and laying in position within 30 meters in dry including cost of E.C bags and strings. (CSR item no. 23.26) |
| 5 | Excavation of Soil using hydraulic excavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankment location with all lifts and leads excluding royalty (CSR item no. 19.38) |
| 6 | Excavation of Soil using hydraulic excavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankment location with lead upto 450 mtrs (CSR item no. 19.38) |
| 7 | Extra for compensation of ordinary earth taken from private land. |
| 8 | Supply, Providing and fixing of Galvanized Bolts & nuts (for seals of all types) with washer of all sizes and length required as per sample / drawing / direction of Engineer-In charge complete in all respects. |
| 9 | Overhauling of gate mechanism of all types including dismantling, greasing, oiling and re-installation of mechanism complete in all aspects more than 10 feet upto 30 feet width of gate |
| 10 | Commisioning & testing of Gates at site complete in all respects and to entire satisfaction of Engineer In charge. |
| 11 | Painting of gate leaf with primer coat and two coats with Anti corrosive Bitumastic paint to give an even shade with special quality paint. |
| 12 | Supply of multi purpose Synthetic hetiv grease |
| 13 | Supply of Mobil Oil |
| 14 | Drilling/Boring hole including complete in all respects and to entire satisfaction of engineer in charge |
| 15 | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level. |
| 16 | 12.5 mm thick cement plaster 1:4 |
| 17 | Providing and fixing horizontal and verical stiffner , hook plate , stiffner angle , gate wheel cover plate , square bar on gates and deck structure |
| 18 | Fillet welding with high strength steel rods complete in all respects and to entire satisfaction of engineer in charge (6mm) |
| 19 | Any Other Item Total in Figures 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |