| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering , preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259)Lift 0 to 1.5 M (MJP SSR 2023-24 Item No.1 P.N.37) |
| 2 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreadingas directed by Engineer-in-charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete. (Bd-A-2/259) Lift 0 to 1.5 M (MJP SSR 2023-24 Item No.2 P.N.37) |
| 3 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed forfoundation and excluding backfilling, etc.complete. (Bd-A-3/259) Lift 0 to 1.5 M (MJP SSR 2023-24 Item No.3 P.N.37) |
| 4 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means.(Bd-A-6/259)Lift 0 to 1.5 M (MJP SSR 2023-24 Item No.7 P.N.38) |
| 5 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete..(MJP SSR 2023-24 Item No.15 P.N.40) |
| 6 | Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work infoundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work,compaction, finishing and curing, etc.complete. (By weigh batching and mix design for M250 and M-300 only. Use ofL&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement)In RCC M-300(MJP SSR 2023-24 Item No.2-D P.N.47) |
| 7 | Supplying & erecting Minimum three & above star rated Centrifugal water pump (Monoblock), 230V, Single phase 50 cycles A.C. supply of 1.125 kW/1.5HP with discharge 198/50 Litres per Minute (LPM)) for head of15/37.5 m & 40 mm suction/ 32 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP (PWD Electrical CSR 2022-23 Item No. 12-1-3 P.N.195) |
| 8 | Supplying & erecting Minimum three & above star rated Centrifugal water pump (Monoblock), 230V, Single phase 50 cycles A.C. supply of 1.5 kW/2 HP with discharge 600/140 Litres per Minute (LPM) for head of 8/22 m & 50 mm suction/ 50 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP(PWD Electrical CSR 2022-23 Item No. 12-1-4 P.N.195) |
| 9 | Supplying & erecting Minimum three & above star rated Centrifugal water pump (Monoblock), 415V, three phase 50 cycles A.C. supply of 1.5 KW/2 HP with discharge 600/140 Litres per Minute (LPM) for head of 8/22 m and 50 mm suction/ 40 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP(PWD Electrical CSR 2022-23 Item No. 12-1-5 P.N.195) |
| 10 | Supplying & erecting Minimum three & above star rated Centrifugal water pump (Monoblock), 415V, three phase 50 cycles A.C. supply of 2.25 KW/ 3 HP with discharge 720/165 Litres per Minute (LPM) for head of 12/26 m and 65 mm suction/ 50 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP (PWD Electrical CSR 2022-23 Item No. 12-1-6 P.N.195) |
| 11 | Supplying and erecting minimum Three & above star rated 1 phase, 230 V, 50Hz, submersible pump set of 1.5 KW/2HP suitable for erection on open well, pump having delivery head from 29 to 7 m and discharge from 30 to 600 litres. . per minute & pipe of Suction 50 mm/Delivery 50 mm diameter erected with necessary H type clamps as per specification No. WP-OSP (PWD Electrical CSR 2022-23 Item No. 12-3-6 P.N.203) |
| 12 | Supplying and erecting minimum Three & above star rated submersiblepump set of 2.25 KW/3 HP with 415 V, 50 c/s AC supply suitable for 150 mmdia. borewell suitable for 120 to 390 LPM discharge at 55 to 11 m head &discharge & delivery Pipe of Size-50mm diameter with a necessary H type clamps as per specification No. WP-SMP (PWD Electrical CSR 2022-23 Item No. 12-2-1 P.N.196) |
| 13 | Supplying and erecting minimum Three & above star rated submersiblepump set of 1.5 KW/2 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 30 to 300 LPM discharge at 50 to 20 m head &discharge & delivery pipe of Size-50 mm diameter with a necessary H type clamps as per specification No. WP-SMP (PWD Electrical CSR 2022-23 Item No. 12-2-31 P.N.199) |
| 14 | Supplying and erecting minimum Three & above star rated submersible pump set of 1.5 KW/2 HP with 230 V, 50 c/s AC supply suitable for 100 mm dia. borewell suitable for 30 to 150 LPM discharge at 61 to 31 m head &discharge & delivery pipe of Size-50 mm diameter with a necessary H type clamps as per specification No. WP-SMP (PWD Electrical CSR 2022-23 Item No. 12-2-32 P.N.199) |
| 15 | Supplying and erecting minimum Three & above star rated submersible pump set of 0.75 KW/1 HP with 230 V, 50 c/s AC supply suitable for 100 mmdia. borewell suitable for 10 to 60 LPM discharge at 88 to 33 m head & discharge & delivery pipe of Size-32 mm diameter with a necessary H type clamps as per specification No. WP-SMP (PWD Electrical CSR 2022-23 Item No. 12-2-33 P.N.200) |
| 16 | Supplying & erecting flat flexible 3 core 2.5 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete (PWD Electrical CSR 2022-23 Item No. 12-4-8 P.N.204) |
| 17 | Supplying & erecting D.O.L Starter suitable for 250 V, Single phase 50 cycles with overload element with necessary materials and connected to supply up to 3 H.P (PWD Electrical CSR 2022-23 Item No. 12-4-1 P.N.203) |
| 18 | Supplying & erecting automatic control panel for 1 Ph, 230 volt, A.C.Submersible/centrifugal pump set up to 3 HP consisting of DOL starter Of suitable relay range S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. (PWD Electrical CSR 2022-23 Item No. 12-4-20 P.N.205) |
| 19 | Supplying & erecting automatic control panel for 3 Phase , 415 volt, A.C,Submersible/centrifugal pump set up to 7.5 HP consisting of DOL starter having relay range 9-14 AMP,S.P.P., Combined ammeter/ voltmeter, phaseindicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. Control Panel should offer single phasing, phase reversal, phase imbalance etc .(PWD Electrical CSR 2022-23 Item No. 12-4-17 P.N.204) |
| 20 | Supplying and erecting 525 V 3 phase, 50 Hz., MPP type capacitor having minimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In and minimum life 150000 hours kVAr bank of metalised polypropylene condensers (MPP) with the standard capacities of 2, 3, 5, 7, 10, 12.5 and 15 kVAr units of P.F. correction for operation on 3 phase 50 Hz. with externally discharging resistances , earthing terminals and built on angle iron or channel iron frame work and provided with terminal cover box complete erected on provided iron bracket or on floor duly tested by licensee. (PWD Electrical CSR 2022-23 Item No. 6-5-3 P.N.115) |
| 21 | Supplying and erecting 525 V 3 phase, 50 Hz., APP type capacitor havingminimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In andminimum life 150000 hours kVAr bank of all polypropylene condensers (APP)with the standard capacities of 2, 3, 5, 7, 10, 12.5 and 15 kVAr units of P.F.correction for operation on 3 phase 50 Hz. with externally discharging resistances, earthing terminals and built on angle iron or channel iron frame work and provided with terminal cover box complete erected on provided iron bracket or on floor duly tested by licensee(PWD Electrical CSR 2022-23 Item No. 6-5-4 P.N.115) |
| 22 | Providing replacement of unserviceable starting relay for AC unit.(PWD Electrical CSR 2022-23 Item No. 3-10-12 P.N.53) |
| 23 | Providing replacement of unserviceable starting capacitor for AC unit.(PWD Electrical CSR 2022-23 Item No. 3-10-13 P.N.53) |
| 24 | Providing replacement of unserviceable running capacitor for AC unit.(PWD Electrical CSR 2022-23 Item No. 3-10-14 P.N.53) |
| 25 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores,etc. complete asperIS-1239/2004.Note : One coupler shall be provided with each full length of pipe cost of which is included in ratesbelow.MEDIUM Class G.I.Pipe (MJP Civil SSR 2023-24 Item No.1-b P.N.93) |
| 26 | 15mm (1.23kg./m) |
| 27 | 20mm (1.59kg./m) |
| 28 | 25mm.(2.40kg./m) |
| 29 | 32mm.(3.17kg./m) |
| 30 | 40mm.(3.65kg./m) |
| 31 | 50mm.(5.16kg./m) |
| 32 | Lowering, specials laying and jointing G. I. pipes and of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position,asdirectedbyEngineer-in-charge.MEDIUM Class G.I.Pipe (MJP Civil SSR 2023-24 Item No.2-b P.N.94) |
| 33 | 15mm (1.23kg./m) |
| 34 | 20mm (1.59kg./m) |
| 35 | 25mm.(2.40kg./m) |
| 36 | 32mm.(3.17kg./m) |
| 37 | 40mm.(3.65kg./m) |
| 38 | 50mm.(5.16kg./m) |
| 39 | Union for 15mm dia.(PWD Civil CSR 2022-23 Item No. 316 P.N.538) |
| 40 | Union for 20mm dia.(PWD Civil CSR 2022-23 Item No. 317 P.N.538) |
| 41 | Union for 25mm dia.(PWD Civil CSR 2022-23 Item No. 318 P.N.538) |
| 42 | Union for 32mm dia.(PWD Civil CSR 2022-23 Item No. 319 P.N.538) |
| 43 | Union for 40mm dia.(PWD Civil CSR 2022-23 Item No. 320 P.N.538) |
| 44 | Union for 50mm dia.(PWD Civil CSR 2022-23 Item No. 321 P.N.538) |
| 45 | End cap for 15mm dia.(PWD Civil CSR 2022-23 Item No. 282P.N.537) |
| 46 | End cap for 20 mm dia.(PWD Civil CSR 2022-23 Item No. 283P.N.537) |
| 47 | End cap for 25mm dia.(PWD Civil CSR 2022-23 Item No. 284P.N.537) |
| 48 | End cap for 32 mm dia.(PWD Civil CSR 2022-23 Item No. 285 P.N.537) |
| 49 | End cap for 40 mm dia.(PWD Civil CSR 2022-23 Item No. 286 P.N.537) |
| 50 | End cap for 50 mm dia.(PWD Civil CSR 2022-23 Item No. 287 P.N.537) |
| 51 | Elbow 90 Degree for 15mm dia.(PWD Civil CSR 2022-23 Item No. 270 P.N.537) |
| 52 | Elbow 90 Degree for 20mm dia.(PWD Civil CSR 2022-23 Item No. 271 P.N.537) |
| 53 | Elbow 90 Degree for 25mm dia.(PWD Civil CSR 2022-23 Item No. 272 P.N.537) |
| 54 | Elbow 90 Degree for 32mm dia.(PWD Civil CSR 2022-23 Item No. 273 P.N.537) |
| 55 | Elbow 90 Degree for 40mm dia.(PWD Civil CSR 2022-23 Item No. 274 P.N.537) |
| 56 | Elbow 90 Degree for 50mm dia.(PWD Civil CSR 2022-23 Item No. 275 P.N.537) |
| 57 | Tee for 15 mm dia.(PWD Civil CSR 2022-23 Item No. 276 P.N.537) |
| 58 | Tee for 20 mm dia.(PWD Civil CSR 2022-23 Item No. 277 P.N.537) |
| 59 | Tee for 25 mm dia.(PWD Civil CSR 2022-23 Item No. 278 P.N.537) |
| 60 | Tee for 32 mm dia.(PWD Civil CSR 2022-23 Item No. 279 P.N.537) |
| 61 | Tee for 40 mm dia.(PWD Civil CSR 2022-23 Item No. 280 P.N.537) |
| 62 | Tee for 50 mm dia.(PWD Civil CSR 2022-23 Item No. 281 P.N.537) |
| 63 | Ball cock for 15mm dia.(PWD Civil CSR 2022-23 Item No. 288 P.N.537) |
| 64 | Ball cock for 20mm dia.(PWD Civil CSR 2022-23 Item No. 289 P.N.537) |
| 65 | Ball cock for 25mm dia.(PWD Civil CSR 2022-23 Item No. 290 P.N.537) |
| 66 | Ball cock for 32mm dia.(PWD Civil CSR 2022-23 Item No. 291 P.N.537) |
| 67 | Ball cock for 40mm dia.(PWD Civil CSR 2022-23 Item No. 292 P.N.537) |
| 68 | Ball cock/Valve for 50mm dia.(PWD Civil CSR 2022-23 Item No. 294 P.N.538) |
| 69 | Socket for 15mm tap(PWD Civil CSR 2022-23 Item No. 113 P.N.533) |
| 70 | Socket for 20mm tap(PWD Civil CSR 2022-23 Item No. 114 P.N.534) |
| 71 | Socket for 25mm tap(PWD Civil CSR 2022-23 Item No. 115 P.N.534) |
| 72 | Socket for 32mm tap(PWD Civil CSR 2022-23 Item No. 116 P.N.534) |
| 73 | Socket for 40mm tap(PWD Civil CSR 2022-23 Item No. 117 P.N.534) |
| 74 | Socket for 50mm tap(PWD Civil CSR 2022-23 Item No. 118 P.N.534) |
| 75 | cPVC pipe 15mm dia.(PWD Civil CSR 2022-23 Item No. 246 P.N.537) |
| 76 | cPVC pipe 20mm dia.(PWD Civil CSR 2022-23 Item No. 247 P.N.537) |
| 77 | cPVC pipe 25mm dia.(PWD Civil CSR 2022-23 Item No. 248 P.N.537) |
| 78 | cPVC pipe 32mm dia.(PWD Civil CSR 2022-23 Item No. 249 P.N.537) |
| 79 | cPVC pipe 40mm dia.(PWD Civil CSR 2022-23 Item No. 250 P.N.537) |
| 80 | cPVC pipe 50mm dia.(PWD Civil CSR 2022-23 Item No. 251 P.N.537) |
| 81 | cPVC Coupling for 15mm dia.(PWD Civil CSR 2022-23 Item No. 252 P.N.537) |
| 82 | cPVC Coupling for 20mm dia.(PWD Civil CSR 2022-23 Item No. 253 P.N.537) |
| 83 | cPVC Coupling for 25mm dia.(PWD Civil CSR 2022-23 Item No. 254 P.N.537) |
| 84 | cPVC Coupling for 32mm dia.(PWD Civil CSR 2022-23 Item No. 255 P.N.537) |
| 85 | cPVC Coupling for 40mm dia.(PWD Civil CSR 2022-23 Item No. 256 P.N.537) |
| 86 | cPVC Coupling for 50mm dia.(PWD Civil CSR 2022-23 Item No. 257 P.N.537) |
| 87 | Supplying Nails (MJP Civil SSR 2023-24 Item No.33 P.N.12) |
| 88 | Supplying NutBolts (MJP Civil SSR 2023-24 Item No.34 P.N.12) |
| 89 | Supplying Wire (MJP Civil SSR 2023-24 Item No.61 P.N.13) |
| 90 | Providing and fixing H.D.Pcontainer one piece moulded water tank made out of high density polythylerand built corrugated inclusive of delivery upto destination hoisting and fixing of accessories such as inlet,outlet overflow pipe inclusive of all tanks capacity between 200 to 1000 liters (PWD Civil CSR 2022-23 Item No. 42.53 P.N.280) |
| 91 | ProvidingandfixingH.D.Pcontaineronepiecemouldedwater tankmadeoutof low density polythyler and built corrugation including of delivery up to destination hoistingand fixingof accessories suchas inlet, outlet overflowof all tanks capacity above 1000 to 20,000 litres(PWD Civil CSR 2022-23 Item No. 42.54 P.N.280) |
| 92 | Supplying Jointing Tape (PWD Civil CSR 2022-23 Item No. 50 P.N.529) |
| 93 | Supplying, erecting & marking DPMCB 6 A to 32 A, B-series with rated short circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB (PWD Electrical CSR 2022-23 Item No. 5-3-7 P.N.90) |
| 94 | Supplying, erecting & marking SPMCB 6A to 32A, C-series with rated short circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB (PWD Electrical CSR 2022-23 Item No. 5-3-2 P.N.90) |
| 95 | Supplying, erecting & marking SPMCB 40A to 63A, C-series with rated short circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB (PWD Electrical CSR 2022-23 Item No. 5-3-4 P.N.90) |
| 96 | Supplying, erecting & marking DPMCB 40A to 63A, C-series with rated short circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB (PWD Electrical CSR 2022-23 Item No. 5-3-8 P.N.90) |
| 97 | Supplying and replacing thermal overload relay for motor starter suitable for up to 12.5 HP.(PWD Electrical CSR 2022-23 Item No. 18-3-11 P.N.90) |
| 98 | Supplying and erecting pump protection relay comprising current sensing phase failure and UV+OV relay with dry run and overload protection suitable for 3 phase pumps.(PWD Electrical CSR 2022-23 Item No. 12-4-7 P.N.204) |
| 99 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainlesssteel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GSTlevied by GOI & GOM in all respect etc. complete.Sluice valves -PN-1(Without by pass)(MJP SSR 2023-24 Item No.2-A P.N.145) 100 mm |
| 100 | Rewinding of electric motor upto 1 H.P. single phase up to 1400 RPM of all types, makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing condenser, screws etc. testing for the original speed and no load consumption with guarantee for one year (PWD Electrical CSR 2022-23 Item No. 18-1-7 P.N.280) |
| 101 | Rewinding of electric motor up to 1 H.P. three phase up to 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (PWD Electrical CSR 2022-23 Item No. 18-1-8 P.N.280) |
| 102 | Rewinding of electric motor above 1 HP upto 2 H.P. three phase up to 1400 RPM of all types and makes with copper wire, over hauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (PWD Electrical CSR 2022-23 Item No. 18-1-9 P.N.280) |
| 103 | Rewinding of electric motor above 2 H.P. upto 3 H.P. three phase up to1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc.testing for the original speed and no load consumption with guarantee for one year (PWD Electrical CSR 2022-23 Item No. 18-1-10 P.N.281) |
| 104 | Rewinding of submersible pump motor in Borewell of all types and makes up to and including 5 HP with coated copper wires & overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed, H.P. and no load consumption & guarantee for one year (PWD Electrical CSR 2022-23 Item No. 18-1-19 P.N.281) |
| 105 | Replacing the existing driving end bearing of original make for electric motorA.Csingle phase /3 phase up to 1H.P. of all types with Required alignment of the shaft and testing the same. (PWD Electrical CSR 2022-23 Item No. 18-2-1 P.N.282) |
| 106 | Replacing the existing driving end bearing of original make for electric motorA.C. single phase/3phase1.5H.P. to 2HP of all types with Required alignment of the shaft and testing the same. (PWD Electrical CSR 2022-23 Item No. 18-2-2 P.N.282) |
| 107 | Replacing the existing driving end bearing of original make for electric motor A.C. single phase/3phase 3HP to 7.5HP of all types with Required alignment of the shaft and testing the same. (PWD Electrical CSR 2022-23 Item No. 18-2-3 P.N.282) |
| 108 | Teflon Tape 12 mm X 0.1 mm X10 M ( As per market Rate) |
| 109 | Insulation Electrical Tape ( As per market Rate) |
| 110 | C.I.Bip tap 12mm (PWD Civil CSR 2022-23 Item No.37 P.N.532) |
| 111 | Bib cock stop tap brass heavy 15mm (PWD Civil CSR 2022-23 Item No.66 P.N.532) |
| 112 | Bib cock stop tap brass heavy 20mm (PWD Civil CSR 2022-23 Item No.67 P.N.532) |
| 113 | Supplying Fitter 1st class Skilled Labour (Maharashtra Govt. Gazzete Extra ordinary part-I L Date 24 Feb, 2015 for full time skilled Lobour basic rate for Zone I for A class Municipal Council And Labour Commissioner Letter Date 06/08/2024) |
| 114 | Supplying Electrician Skilled Labour (Maharashtra Govt. Gazzete Extra ordinary part-I L Date 24 Feb, 2015 for full time skilled Lobour basic rate for Zone I for A class Municipal Council And Labour Commissioner Letter Date 06/08/2024) |
| 115 | Supplying Plumber Skilled Labour(Maharashtra Govt. Gazzete Extra ordinary part-I L Date 24 Feb, 2015 for full time skilled Lobour basic rate for Zone I for A class Municipal Council And Labour Commissioner Letter Date 06/08/2024) |
| 116 | Supplying Mazdoor UnSkilled Labour(Maharashtra Govt. Gazzete Extra ordinary part-I L Date 24 Feb, 2015 for full time skilled Lobour basic rate for Zone I for A class Municipal Council And Labour Commissioner Letter Date 06/08/2024) Please Enable Macros to View BoQ information |