| 1 | Item No. 1 : Cleaning grass and removal of rubbish , including all lead and depositing outside the periphery of the area as directed, including 1 % Cess for labour welfare etc. complete |
| 2 | Item No. 2 : Dismentalling dry rubble stone pitching including stacking them neatly including all lead & lift , including 1 % Cess for labour welfare etc. complete |
| 3 | Item No.3 : Stripping Up to 10 cm depth in all kind of soil, Soft Murum hard murum, with all lead & Lift and depositing as directed by Engineer in charge including 1 % Cess for labour welfare etc. complete |
| 4 | Item No.4 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . |
| 5 | Item No.5 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . |
| 6 | Item No.6 : Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . |
| 7 | Item No.7 : Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete . |
| 8 | Item No.8 : Providing cut off trench filling using selected impervious soil from approved borrow areas ( Government acquired land ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compacter including cost of water with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . |
| 9 | A ) With Borrow Material From Submergence |
| 10 | Item No. 9: Providing casing embankment using selected pervious material available directly from excavation , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, including watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water / excluding compaction etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . |
| 11 | A ) Top Shrunked Portion |
| 12 | Including Watering & Compaction with vibratory compacter |
| 13 | B ) U/S Berm & D/S Resectioning |
| 14 | Including Watering & Consolidation By Other Than Mechanical Means . |
| 15 | Item No. 10 : Providing casing embankment using selected pervious material from approved borrow areas ( Government acquired land ), laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete . |
| 16 | U/S Berm & D/S Resectioning Including Watering & Consolidation By Other Than Mechanical Means . |
| 17 | A ) With Borrow Material From Submergence |
| 18 | Item No.11: Removing dry silt from the drain with all lead & lift and depositing as directed including 1 % Cess for labour welfare etc. comp . |
| 19 | Item No. 12 : Providing and constructing 200 mm thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials or from removed pitching including labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. Including 1 % Cess for labour welfare etc. complete . |
| 20 | Item No.13 : Providing and constructing 230 mm thick dry rubble stone pitching using stones and stone chips from approved source from borrow area including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. including 1 % Cess for labour welfare etc. complete . |
| 21 | Item No.14 : Dismantling the stone masonry in cement mortar including stacking the material as directed with all lead & Lift including 1 % cess For Labour Welfare etc. complete |
| 22 | Item No 15 : Providing and fixing in position TMT - FE -500 bar reinforcement of various diameters for RCC works as per detailed designs and drawing ,including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete as directed with all lead & lift including 1 % Cess For Labour Welfare etc complete. |
| 23 | Item No.16 : Providing and laying in situ cement concrete of grade M-15 1:2:4 (40 MSA) , for flank wall & ww Bar, ( Up To GL ) , of trap / granite / gneiss / quartzite /graded metal for PCC wirth or without surface reinforceent / RCC Concreting with Concrete Mixer with shuttering and scaffolding including placing, compacting, curing including 1 % Cess on labour welfare excluding royalty of material, etc complete . |
| 24 | Item No. 17 : Providing and laying in situ cement concrete of grade M-15 1:2:4 (40 MSA) , of trap / granite / gneiss / quartzite /graded metal for flank wall & ww Bar, For Sub & Super Structure, with Concrete Mixer including form work including placing, compacting, curing including 1 % Cess on labour welfare excluding royalty of material, etc. complete . |
| 25 | Item No 18 : Providing and fixing information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green / white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non - peal able crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge including 1 % Cess for labour welfare etc. complete . |
| 26 | Item No.19 : Royalty Charges For Construction Material |
| 27 | For Sand |
| 28 | For Other Mineral |
| 29 | Item No.20 :Testing Charges ( Quality Control ) |
| 30 | Hearting - Moisture Content |
| 31 | Specific Gravity |
| 32 | Permeablity |
| 33 | Field Density ( Core Cutter Method ) |
| 34 | Casing - Moisture Content |
| 35 | Specific Gravity |
| 36 | Field Density ( Sand Replacement Method ) |
| 37 | Stone Water Absorption & Specific Gravity |
| 38 | Compressive strength of cement concrete M -15 40 MSA ( Conventional Curing Tank ) |
| 39 | Steel weight / meter ,Tensile Strength & Elongation of steel |
| 40 | Item No.21 : Insurance 1 % |
| 41 | Item No.22 : CGST 9 % |
| 42 | Item No.23 : SGST 9 % Please Enable Macros to View BoQ information |