| 1 | Supply & Fixing of following spare parts suitable for above engine as reqd. |
| 2 | FUEL FILTER CARTRIDGE (2nos for Each DG set) DV0.020.03.0.00 |
| 3 | LUBE OIL FILTER (1no for each DG set) DV0.014.27.0.00 |
| 4 | SPINON PRELINE FILTER CTG (1no for each DG set) DV0.053.05.0.00 |
| 5 | Kirloskar Care Premium Genuine Oil 50 Litres Can (1no for each DG set) 82.060.10.0.50 |
| 6 | LUBE OIL FILTER (1no for each DG set) DV0.014.11.0.00 |
| 7 | Kirloskar Care Genuine Coolant Premix 26 Liters Can-1No (5Nos for each DG set) 82.020.35.1.26 |
| 8 | AIR CLEANER PRIMARY ELEMENT (2nos for each DG set) KV2.505.02.0.00 |
| 9 | AIR CLEANER SAFETY ELEMENT (2nos for each DG set) KV2.505.03.0.00 |
| 10 | FUEL PIPE ASSLY FLEXIBLE (1nos for each DG set) DV0.022.110.0.00 |
| 11 | HOSE T BOLT CLAMP FOR OD 137MM (6-7nos for each DG set) KV0.505.14.0.00 |
| 12 | V BELT SPB AR1170 (2 NOS SET) (2nos for each DG set) DV0.016.23.0.00 |
| 13 | V BELT BX58 (1nos for each DG set) DV0.016.08.0.00 |
| 14 | JOINT FOR ROCKER COVER (7-8nos for each DG set) DV0.009.05.0.00 |
| 15 | K SEALENT (80 ML) (2-3nos for each DG set) 82.060.10.0.80 |
| 16 | CYLINDER HEAD GASKET 115 (10nos for each DG set) DV0.007.43.0.00 |
| 17 | VALVE STEM SEAL (27nos for each DG set) 06.631.02.0.00 |
| 18 | Poviding Radiator Servicing Charge at workshop after dismantling i/c transportation from site and back ,arresting leakages checking all radiator pipes carefully etc as complete as reqd.(DG set no:-3) 99.RAD.01. 00 |
| 19 | Poviding complete parts by parts of Radiator Servicing Charge with appropriate machines & blowers at site etc complete as reqd.(DG set No:-2) 99.RAD.02. 00 |
| 20 | Supplying and pouring the Rust Buster (1nos for each DG set) 82.060.10.0.92 |
| 21 | Supplying and pouringK Clean, 1 Liter Can (4nos for each DG set) 82.020.35.5.01 |
| 22 | Providing Cylinder head repair charges at lathe machine/workshop etc as complete as reqd. 99.CHR.01.00 |
| 23 | Labour Charges for complete servicing i/c testing trial run ,checking all safety parameters etc as complete as reqd. 99.0PW.01.0.00 |
| 24 | Reparing /Remodifying of existing RAIN Cap protection of Silencer Pipe (as per OEM's standard) to avoid rain entry into cylinder head etc as complete as reqd. |
| 25 | SITC of Gen set Main Controller unit with digital display of similar make, testing with all the safety parameters, earthing system ,commissioning etc as complete as requiredetc as complete as reqd. DV0.858.05.0.00 Please Enable Macros to View BoQ information |